| Purpose | EV charging |
| Condition | New |
| Interface Standard | Type2 GBT |
| Output Current | AC |
| Output Power | 7kw |
| Input Voltage | 220V±15% AC |
| OEM/ODM | Support |
| Place of Origin | Guangdong, China |
| Brand Name | Huinengzhi |
View Detail Information
Explore similar products
11kW Output Power Weatherproof IP55 LCD Touch Display EV Charging Station Wall
Commercial 120kW 180kW 240kW DC Fast Charger with Dual Guns CCS2 GBT and OCPP1
7kW 32A Wall-mounted EV Charging Station with Universal Compatibility for
High Efficiency 20-40kW DC EV Fast Charger Station with OCPP 1.6J Compliance and
Product Specification
| Purpose | EV charging | Condition | New |
| Interface Standard | Type2 GBT | Output Current | AC |
| Output Power | 7kw | Input Voltage | 220V±15% AC |
| OEM/ODM | Support | Place of Origin | Guangdong, China |
| Brand Name | Huinengzhi |
|
Parameter |
Specification |
|
Max Power |
7kW (32A) |
|
Voltage |
220V - 240V AC |
|
Communication |
Wi-Fi / Bluetooth / RFID/4G/Ethernet optional |
|
Protocol |
OCPP1.6J |
|
Connector |
Type 2 (Mennekes)/SAE J1772 (Type 1)/GB/T 20234 |
|
Cable length |
5meter(UL/TPU) |
|
Standard |
IEC 62196-2 IEC 61851-1 |
|
Protection |
IP54 / IK08 |
residential parking, commercial workplaces, and fleet depots. It solves three critical points for overseas operators:
Grid Capacity Limits: Delivers maximum single-phase charging speed 7kw 32A on standard 230v connections without requiring expensive three-phase grid upgrades.
Logistics & Installation Costs: The ultra-compact structural design reduces ocean freight volume by 30%, maximizing pallet loading efficiency and lowering shipping costs per unit.
Interoperability & Lock-in: Fully open OCPP 1.6J (JSON) protocol ensures seamless integration with any standard third-party Central Management System (CMS), preventing software lock-in.
Compatiable with 95% New Energy Vehicles in market like BYD, GWM, VinFast, VGo
Compliance & Certifications
Electrical Safety: Certified in compliance with IEC 61851-1:2017 (Electric vehicle conductive charging system) and IEC 61851-21-2:2018 (EMC requirements).
Regional Market Access: Standard configurations meet European CE (LVD/EMC/RED) marks, Australian RCM guidelines, and Indian BIS component safety thresholds.
Q1. Who are we?
A: Our company " Shenzhen Huinengzhi Technology"
10+ Years Dedicated EV Charger Manufacturer (Established in 2014).
Over 1000 units deployed across Europe, South America, and Asia.
Independent Hardware and Software R&D with self-developed SECC controllers.
Q2. Do you test all your chargers before shipping?
A: All major components are tested before assembly and each charger is fully tested before shipped
Q3.what can you buy from us?
A: AC &DC EV charging pile
Q4: What charging interface standards do these chargers support?
A: Our charging stations can be configured with various global connector standards:
AC Charging: Type 2 (Europe), Type 1 (North America), GB/T (China).
DC Charging: CCS Combo 2 (Europe), CCS Combo 1 (North America), CHAdeMO (Japan), GB/T (China), and NACS (Tesla standard).
Q5: Are these chargers safe to use in the rain or extreme weather?
A: Yes. Our chargers are designed with high weatherproof ratings (typically IP54 or IP55 for outdoor use). They feature multiple safety protections, including over-current, over-voltage, short-circuit, leakage, and lightning protection.
Q6: Can I custom my LOGO?
Answer: Yes. You can not only custom LOGO, but also color, cable, enclosure box and carton. Just contact us if you have special needs. We accept full customization for Appearance/Software/Functions/ Accessories/Charging Standards/Packaging etc.
Q7: What the MOQ for the product?
A: There is no MOQ request for normal charger. OEM MOQ depends the customers’ requirements and products’ features.
Q8: How long to fully charge a car?
To know how long to charge a car, you need to know the OBC(on board charger) power of the car, the car battery capacity, the charger power. The hours to fully charge a car =battery kw.h/obc or charger power the lower one. For e.g, the battery is 40kw.h,obc is 7kw, charger is 22kw, the 40/7=5.7hours. If the obc is 22kw, then 40/22=1.8hours.
Company Details
Ecer Certification:
Verified Supplier
Shenzhen Huinengzhi Technology Co., Ltd. was established in 2014 and is located in Shenzhen, China. We always focus on the research and development, production, and sales of Electric vehicle charging stations. We have a 1600 square meter production base, advanced production technology, experienced R... Shenzhen Huinengzhi Technology Co., Ltd. was established in 2014 and is located in Shenzhen, China. We always focus on the research and development, production, and sales of Electric vehicle charging stations. We have a 1600 square meter production base, advanced production technology, experienced R...
Get in touch with us
Leave a Message, we will call you back quickly!