Products
Manufacturer of a wide range of products which include 220kv Steel Lattice Tubular Electrical Substation Structure for Power Transmissi,500kv Bus Support Substation Structure BS / EN S355JR / S235JR Material,ASTM A36 220 Kv Transm...
MOQ: one container
Price: Negotiation
| Payment Terms | L/C, T/T |
| Supply Ability | 5000 tons per month |
| Delivery Time | 30 days |
| Packaging Details | packages suitable for transportation |
| Material | Q345B or Q235B ,420 |
| Voltage | 10-1000KV |
| Surface treatment | hot dip galvanization or color painting |
| Application | electrical transmission and distribution |
| Warranty period | 30 years |
| Welding standard | AWS D 1.1 |
| Brand Name | LT |
| Model Number | LT-087 |
| Certification | ISO,SGS |
| Place of Origin | Qingdao,China |
MOQ: one set
Price: Negotiation
| Payment Terms | L/C, T/T, Western Union |
| Supply Ability | 2000 tons per month |
| Delivery Time | 30days |
| Packaging Details | packages suitable for transportation or as requirement |
| Material | BS/EN S355JR,S235JR |
| Type | Dead end structures/static poles/bus support |
| Usage | Power transmission and distribution/converter /switching |
| Welding standard | AWS D 1.1 |
| Rated voltage | 10-500kv |
| Galvanization standard | ASTM A 123 |
| Brand Name | OEM/LT |
| Model Number | OEM/LT-084 |
| Certification | ISO9001,ISO 14001,OHSAS 45001,SGS |
| Place of Origin | QINGDAO,CHINA |
MOQ: 1 set
Price: Negotiation
| Payment Terms | L/C, T/T, Western Union |
| Supply Ability | 3000 tons per month |
| Delivery Time | 30 working days |
| Packaging Details | usually we use steel wire to fix tower to bundles and use plastic to protect the zinc |
| Material | ASTM A36, A572 Grade 50 |
| Surface Treatment | hot dip galvanization |
| Application | Electricity distribution |
| Voltage | High voltage |
| Seaport | Qingdao port ,China |
| Hs code | 73082000 |
| Brand Name | OEM/LT |
| Model Number | OEM/LT-222 |
| Certification | ISO01/ISO14001/OHSAS45001 |
| Place of Origin | Qingdao ,China |
MOQ: 1 set
Price: Negotiation
| Payment Terms | L/C, T/T, Western Union |
| Supply Ability | 3000 tons per month |
| Delivery Time | 30 working days |
| Packaging Details | usually we use plastic or old type to protect the flange and overlapping place |
| Steel Grade | Q345B,Q235B |
| Surface Treatment | Hot dip galvanization and colored |
| Design | Customized design is accepted |
| Circuit | Single/double/multi |
| Type | Cable Tower /Indepence Tower |
| Structure | 4 legged lattice tower |
| Brand Name | OEM/LT |
| Model Number | OEM/LT-226 |
| Certification | ISO01/ISO14001/OHSAS45001/SGS |
| Place of Origin | Qingdao ,China |
MOQ: 1 set
Price: Negotiation
| Payment Terms | L/C, T/T, Western Union or as discussed |
| Supply Ability | 3000 tons per month |
| Delivery Time | 30 working days |
| Packaging Details | usually we use steel wire to fix tower to bundles and use plastic to protect the zinc |
| Material | Q345B and Q235B |
| Surface | Hot dip galvanization |
| Structure | Lattice angle steel tower |
| Usage | Overhead power line |
| Zinc Thickness | Min average zinc thickness is not less than 86um |
| Port | Qingdao port |
| Brand Name | LT |
| Model Number | LT-227 |
| Certification | ISO 9001-2015,ISO14001-2015,OHSAS 45001-2015,SGS |
| Place of Origin | Qingdao ,China |
MOQ: 1 set
Price: Negotiation
| Payment Terms | L/C, T/T, Western Union |
| Supply Ability | 2000 tons per month |
| Delivery Time | 30 working days |
| Packaging Details | usually we use steel wire to make angle into bundle and use plastic to protect the key parts |
| Material | Q420,Q345B,Q235B |
| Surface Treatment | Hot dip galvanization and painting |
| Test | Type test and pre-shipment test |
| Voltage | 10-1000KV |
| Zinc thickness | The min average zinc thinkness is not less than 86um |
| Usage | Suspension tower/tension tower/terminal tower/transposition tower |
| Brand Name | OEM/LT |
| Model Number | OEM/LT-228 |
| Certification | ISO01/ISO14001/OHSAS45001/SGS |
| Place of Origin | Qingdao ,China |
MOQ: 1 set
Price: Negotiation
| Payment Terms | L/C, T/T, Western Union |
| Supply Ability | 3000 tons per month |
| Delivery Time | 30 working days |
| Packaging Details | usually we use steel wire to make angle steel into bundle and use special material to protect Zinc |
| Steel Grade | S355JR |
| Surface Treatment | Hot dip galvanization and color painting |
| Port | Qingdao port |
| Zinc thinkness | Min average thickness is not less than 86um |
| Galvanization | ISO1461 |
| Type | Terminal Tower |
| Brand Name | OEM/LT |
| Model Number | OEM/LT-229 |
| Certification | ISO01/ISO14001/OHSAS45001/SGS |
| Place of Origin | Qingdao ,China |
MOQ: 1 set
Price: Negotiation
| Payment Terms | L/C, T/T, Western Union |
| Supply Ability | 3000 tons per month |
| Delivery Time | 30 working days |
| Packaging Details | usually we use steel wire to make angle steel into bundle and use special material to protect Zinc |
| Steel Grade | S235JR and S355JR |
| Surface Treatment | Hot dip galvanization and color painting |
| Type | 4 legged angle steel tower |
| Appication | Power distribution and transmission line |
| Port | Qingdao port |
| Zinc thinkness | Min average is not less than 86um |
| Brand Name | OEM/LT |
| Model Number | OEM/LT-231 |
| Certification | ISO01/ISO14001/OHSAS45001/SGS |
| Place of Origin | Qingdao ,China |
MOQ: 1 set
Price: Negotiation
| Payment Terms | L/C, T/T, Western Union |
| Supply Ability | 3000 tons per month |
| Delivery Time | 30 working days |
| Packaging Details | Use special material to protect Zinc |
| Steel Grade | Q345B and Q235B |
| Surface Treatment | Hot dip galvanization and color painting |
| Appication | Electricity distribution network |
| Connection | Overlapping connection or flange connection |
| Welding | CO2 welding,submerged arc auto welding |
| Zinc thinkness | Min average thickness is not less than 86um |
| Brand Name | OEM/LT |
| Model Number | OEM/LT-230 |
| Certification | ISO01/ISO14001/OHSAS45001/SGS |
| Place of Origin | Qingdao ,China |
MOQ: one set
Price: Negotiation
| Payment Terms | L/C, T/T, Western Union |
| Supply Ability | 5000 tons per month |
| Delivery Time | 30days |
| Packaging Details | packages suitable for transportation or as requirement |
| Material | ASTM A36,ASTM A 572 grade 50 |
| surface treatment | hot dip galvanziation or painting |
| connection | overlaping or flange connection |
| Application | Electricity distribution network |
| Height | From 10M-100M or according to client's requirement |
| Sea port | Qingdao Port |
| Brand Name | OEM/LT |
| Model Number | OEM/LT-224 |
| Certification | ISO,SGS |
| Place of Origin | QINGDAO,CHINA |
Explore more categories
Get in touch with us
Leave a Message, we will call you back quickly!