| Payment Terms | L/C, T/T |
| SHELL | SA387 GR.11 CL.1 |
| STUD BOLT&NUTS | SA193 GR.B16/SA194 GR.4 |
| Packaging Details | Nude Cargo/Bare Packaging, Frame Packaging |
| SKIRT | SA387 GR.11 CL.1/SA516 GR.70 |
| Delivery Time | 60---150 DAYS |
| Supply Ability | 50SETS/MONTHS |
| Design Code & Certification | ASME Section VIII, Division 1 (2015 Edition) |
| NOZZLE FLANGES | SA182 GR.F11 CL.2 |
| PLATE | SS304 |
| Brand Name | YUHONG |
| Certification | ASME VIII DIV.1 , PED, API , NB, NACE MR0175 |
| Place of Origin | China |
| Model Number | High-Temperature CO-Shift Reactor |
View Detail Information
Explore similar products
ASME SA516 GR.70 Hydrogenation Reactor Pressure Vessel Tank 200000L
ASME U-Stamp Carbon Steel Vessel with Insulation Cladding
ASME U Stamp Pressure Vessel Condensate Tank EN10025 S275JR for Hydro Plant
ASME U Stamp Pressure Vessel Steam Separator SA106 Grade B for Oil and Gas
Product Specification
| Payment Terms | L/C, T/T | SHELL | SA387 GR.11 CL.1 |
| STUD BOLT&NUTS | SA193 GR.B16/SA194 GR.4 | Packaging Details | Nude Cargo/Bare Packaging, Frame Packaging |
| SKIRT | SA387 GR.11 CL.1/SA516 GR.70 | Delivery Time | 60---150 DAYS |
| Supply Ability | 50SETS/MONTHS | Design Code & Certification | ASME Section VIII, Division 1 (2015 Edition) |
| NOZZLE FLANGES | SA182 GR.F11 CL.2 | PLATE | SS304 |
| Brand Name | YUHONG | Certification | ASME VIII DIV.1 , PED, API , NB, NACE MR0175 |
| Place of Origin | China | Model Number | High-Temperature CO-Shift Reactor |
| High Light | ASME U Stamp pressure vessel ,hydrogen service reactor vessel ,certified pressure vessel reactor | ||
ASME U Stamp Pressure Vessel Reactor Tube Bundle for Hydrogen Service
YUHONG High-Temperature CO-Shift Reactor (HT CO-Shift Reactor) is a critical, heavy-duty pressure vessel custom-engineered. Designed and certified in strict accordance with ASME Section VIII, Division 1 (2015 Edition) with official "U" Stamp certification
High-Temperature CO-Shift Reactor - Material Specifications
High-Temperature CO-Shift Reactor - Internal Bed & Packing
High-Temperature CO-Shift Reactor - Testing Standards
100% Non-Destructive Testing (NDT): All pressure-retaining butt welds. Attachment fillet welds are verified via 100% Magnetic Particle (MT) or Dye Penetrant Testing (PT)
Advanced Heat Treatment: Elliptical heads are fully Normalized & Tempered post-forming. The fully assembled vessel undergoes rigorous shop Post-Weld Heat Treatment (PWHT).
Toughness Verification: Standard Charpy V-Notch Impact Testing.
Traceable ITP Compliance: A dedicated Production Test Coupon
![]()
Company Details
Business Type:
Manufacturer,Exporter,Trading Company,Seller
Year Established:
1990
Total Annual:
50M-75M
Employee Number:
50~850
Ecer Certification:
Verified Supplier
.gtr-container-k7p2x9 { font-family: Arial, Helvetica, "Times New Roman", Arial, sans-serif; font-size: 14px; line-height: 1.6; color: #000000; padding: 16px; max-width: 100%; box-sizing: border-box; } .gtr-container-k7p2x9 p { margin-top: 0; margin-bottom: 1em; text-align: lef... .gtr-container-k7p2x9 { font-family: Arial, Helvetica, "Times New Roman", Arial, sans-serif; font-size: 14px; line-height: 1.6; color: #000000; padding: 16px; max-width: 100%; box-sizing: border-box; } .gtr-container-k7p2x9 p { margin-top: 0; margin-bottom: 1em; text-align: lef...
Get in touch with us
Leave a Message, we will call you back quickly!