Payment Terms | L/C, T/T |
Supply Ability | 60000tons per year |
Delivery Time | 5-8 weeks days |
Packaging Details | In woven bags or wooden cases |
Technique | Cold Drawn and DOM |
Application | Hydraulic Pipe |
Standard | DIN2391 EN10305-1/4 |
Alloy or not | Non-alloy |
Thickness | 0.5 - 8 mm |
Origin | China |
OD | 4-76mm |
Surface | Zinc or others |
Brand Name | Torich |
Model Number | DIN2391 EN10305-1/4 |
Certification | IS09001 ISO14001 TS16949 |
Place of Origin | China |
View Detail Information
Explore similar products
12X1mm Precision steel tubing Automotive tubing
JIS-G 3445,EN 10305-3 STKM11,STKM12 Supporting Auto Seat Headrest Pipe
ASME SB444 Nickel Alloy Pipes Inconel625 Uns N06625 Alloy 625 Hydraulic Control
304 304L 316 316L SS Micro Tubes Needle tubes
Product Specification
Payment Terms | L/C, T/T | Supply Ability | 60000tons per year |
Delivery Time | 5-8 weeks days | Packaging Details | In woven bags or wooden cases |
Technique | Cold Drawn and DOM | Application | Hydraulic Pipe |
Standard | DIN2391 EN10305-1/4 | Alloy or not | Non-alloy |
Thickness | 0.5 - 8 mm | Origin | China |
OD | 4-76mm | Surface | Zinc or others |
Brand Name | Torich | Model Number | DIN2391 EN10305-1/4 |
Certification | IS09001 ISO14001 TS16949 | Place of Origin | China |
4130 30CrMo chromly seamless thick wall tube OD16mm OD12mm
Standard: DIN 2391 EN 10305-1/4
OD:4-76mm
Wall thickness:0.5-8mm
Material:E215 E235 E355 ST35,ST37.4,ST45,ST52.4 4130 30CrMo etc
Hydraulic steel tube | |||||
Standard | Material | Delivery | Surface | Sizes | |
DIN | 2391/1630/2445 | ST37.4 ST52.4 | NBK | 1) BA 2)Black phosphating 3) Galvanizing | OD2 -60mm × WT0.3 -10mm |
EN | 10305-4 | E235 E355 | (+)N | ||
BS | 3602 | CFS 360 | Zinc Layer thickness more than 8um | ||
Other steel grades also available upon request |
Delivery condition:
The tubes can be produced in the following delivery conditions:
BK (+C) Cold finished/hard (cold finished as drawn).
No heat treatment after the last cold forming process.
BKW (+LC) Cold finished/soft (lightly cold worked)
After the last heat treatment there is a light finishing pass (cold drawing).
BKS (+SR) Cold finished/stress relieve annealed.
After the final cold forming process the tubes are stress relieve annealed.
GBK (+A) Annealed.
After the final cold forming process the tubes are annealed in a controlled atmosphere.
NBK (+N) Normalized. (Mainly focus on)
After the final cold forming process the tubes are annealed above the upper transformation point in a controlled atmosphere
Company Details
Business Type:
Manufacturer,Importer,Exporter,Trading Company,Seller
Year Established:
2008
Total Annual:
15000000-20000000
Employee Number:
100~200
Ecer Certification:
Site Member
Torich Interational Limited is a professional manufacturer and exporter of steel pipes materials. It is an international marketing and sales company specialized in steel tubes, which holds the factories of Seamless Steel Tubes with Carbon and Alloy Steel Grade, Welded Precision Steel Tubes,DO... Torich Interational Limited is a professional manufacturer and exporter of steel pipes materials. It is an international marketing and sales company specialized in steel tubes, which holds the factories of Seamless Steel Tubes with Carbon and Alloy Steel Grade, Welded Precision Steel Tubes,DO...
Get in touch with us
Leave a Message, we will call you back quickly!