| Safety Performance | Triple overload protection, fault cut-off within 10ms |
| System Structure | Modular Configuration |
| Delivery Time | 30 Working Days |
| Control Method | Computerized automatic measurement and control |
| Onboard Instruments | Power analyzer, DC resistance tester, turns ratio tester |
| Payment Terms | T/T,L/C |
| Fault Current Disconnection | ≤10 ms |
| Packaging Details | Plywood Case |
| Main Components | Medium-frequency generator, induction voltage regulator, test transformer & cabinets |
| Model Number | SXBZ |
| Brand Name | Sansion |
| Place of Origin | China |
| Certification | CE/SGS/EMS/ISO 9001 |
View Detail Information
Explore similar products
Transformer Test Console with Integrated Digital Measurement and Centralized
Three-Phase Transformer Test Bench for Factory Routine Testing, Precision
Automatic Transformer Comprehensive Test Bench for Distribution and Power
Automatic Transformer Comprehensive Test Bench for Turns Ratio, Winding
Product Specification
| Safety Performance | Triple overload protection, fault cut-off within 10ms | System Structure | Modular Configuration |
| Delivery Time | 30 Working Days | Control Method | Computerized automatic measurement and control |
| Onboard Instruments | Power analyzer, DC resistance tester, turns ratio tester | Payment Terms | T/T,L/C |
| Fault Current Disconnection | ≤10 ms | Packaging Details | Plywood Case |
| Main Components | Medium-frequency generator, induction voltage regulator, test transformer & cabinets | Model Number | SXBZ |
| Brand Name | Sansion | Place of Origin | China |
| Certification | CE/SGS/EMS/ISO 9001 | ||
| High Light | fully automatic transformer test system ,transformer comprehensive test equipment ,transformer test system for manufacturers | ||
The SXBZ Series Transformer Comprehensive Testing Solution is designed for transformer manufacturers, electrical testing laboratories, maintenance facilities, and power equipment companies that need a coordinated approach to transformer testing. Instead of operating multiple independent instruments for different procedures, the system brings power supply, voltage regulation, measurement, control, protection, and data acquisition into a coordinated testing workflow.
The system can integrate voltage, current, power, and other electrical measurement functions required for transformer testing. This provides a centralized way to monitor important testing parameters during operation.
The system can be configured with DC resistance testing functions for transformer winding resistance measurement. It is suitable for routine inspection, manufacturing tests, maintenance, and troubleshooting applications.
Turns ratio testing can be incorporated into the system configuration to support transformer winding ratio verification.
Testing operations can be managed through a centralized control interface, helping operators reduce unnecessary switching between different instruments.
Measurement data can be collected and stored according to the configured testing requirements. This is particularly useful for transformer manufacturers handling repeated testing procedures.
| Item | Description |
|---|---|
| Product Series | SXBZ Series |
| System Type | Transformer Comprehensive Testing System |
| Control Mode | Centralized / Computerized Control |
| System Structure | Modular Configuration |
| Voltage Measurement | Configurable |
| Current Measurement | Configurable |
| Power Measurement | Configurable |
| DC Resistance Test | Configurable |
| Turns Ratio Test | Configurable |
| Data Acquisition | Configurable |
| Protection | Three-Level Overload Protection |
| Fault Current Disconnection | ≤10 ms |
| Application | Factory / Laboratory / Maintenance |
| Customization | Available |
What transformers can be tested with the SXBZ system?
The system can be configured for different power and distribution transformer applications, including oil-immersed and dry-type transformers.
Is the SXBZ a standard product?
The SXBZ is a configurable comprehensive testing system. The final configuration depends on the customer's transformer specifications and required test items.
Can existing testing equipment be integrated?
The system configuration can be discussed according to the customer's existing equipment and testing requirements.
Can the testing process be automated?
Centralized and computerized control can be configured according to the required level of automation.
Can test data be recorded?
Yes. Data acquisition and test-result recording functions can be incorporated into the system.
Company Details
Business Type:
Manufacturer
Year Established:
2005
Ecer Certification:
Verified Supplier
Sansion Power Electric Co., Ltd was established in 2005, a technocrat who have rich experience of more than 10 years in R&D, manufacturing and marketing of power electrical testing products, which are widely used in the fields of power electric, railroad, energy conservation and environment prot... Sansion Power Electric Co., Ltd was established in 2005, a technocrat who have rich experience of more than 10 years in R&D, manufacturing and marketing of power electrical testing products, which are widely used in the fields of power electric, railroad, energy conservation and environment prot...
Get in touch with us
Leave a Message, we will call you back quickly!