| Payment Terms | T/T,Paypal |
| Supply Ability | 10KKPCS Per Month |
| Delivery Time | 5-7 Days |
| Packaging Details | Tape 20000PCS/Carton (Default) ; Bulk ,10000PCS/Carton |
| Name | Miniature Fuse 5A 250V |
| Speed | Fast-acting |
| Rated Current | 5A |
| Voltage | 250V |
| Color | Black(Default)/Red |
| Size | 8x4x8mm |
| Shape | Rectangular |
| Breaking Capacity | Low |
| IEC Designation | IEC 127-3 |
| I2T | 78 A2.S |
| Model Number | MFS1500A |
| Certification | UL,VDE,KC,PSE,cUL,CQC |
View Detail Information
Explore similar products
One Time Surface Mount Glass Fuses 125Vac 2 Ampere Non Resettable
Board Mount Through Hole Cartridge Excluded Radial Box Slow Blow Micro Fuse T 1A
TE5 TE7 TR5 8mm Black Square Type Quick Acting Subminiature Fuse F 2Ampere
Glass Fuses , Slow Blow Time Delay Ceramic Fuses 3A 250V 3.6x10mm
Product Specification
| Payment Terms | T/T,Paypal | Supply Ability | 10KKPCS Per Month |
| Delivery Time | 5-7 Days | Packaging Details | Tape 20000PCS/Carton (Default) ; Bulk ,10000PCS/Carton |
| Name | Miniature Fuse 5A 250V | Speed | Fast-acting |
| Rated Current | 5A | Voltage | 250V |
| Color | Black(Default)/Red | Size | 8x4x8mm |
| Shape | Rectangular | Breaking Capacity | Low |
| IEC Designation | IEC 127-3 | I2T | 78 A2.S |
| Model Number | MFS1500A | Certification | UL,VDE,KC,PSE,cUL,CQC |
| High Light | slow blow glass fuse ,mini glass fuses | ||
PCB Mount Circuit Protection Compact Design Long Leaded PVC Cap Fast Acting Micro Miniature Fuse F 5A 250V
What is a Micro Fuse?
A micro fuse is a radial leaded subminiature fuse, offered in either a cylindrical or rectangular form factor. Micro fuses were originally designed for the U.S. Space Program. The micro fuse is made with either glass, plastic or metal bodies. They are designed to be electrically equivalent to miniature glass cartridge, fuses in a smaller package with higher tolerance to impact and vibration. Micro fuses can plug, in to a PC board mounted fuse holder. Micro fuse voltage, ratings typically range from 65 volts AC to 300 volts AC. Micro fuses with voltage ratings up to 450 volts DC are also available. Micro fuses are offered in fast acting, or time lag, versions. Micro fuses are typically built in accordance with UL 248-14, and CSA C22.2/No.248.14 or IEC 60127-3, standards. Some fuse micro series are also offered in MIL Spec, versions.
![]()
Scope of application
This product is suitable for various kinds of electronic devices’ circuit over current protection. Widely used in industrial of Battery Charges, Consumer Electronics, Power supplies, Industrial Controllers, etc.
Standards
In accordance with IEC60127-1, IEC60127-3 Standard sheet4, GB9364.1-1997, GB9364.3-1997.
Agency Approvals
| Agency | Ampere Range | Agency File Number |
| UR | 50mA ~ 6.3A | E340427(JDYX2) |
| C-UR | 50mA ~ 6.3A | E340427(JDYX8) |
| VDE | 50mA ~ 6.3A | 40039420 |
| CQC | 50mA ~ 6.3A | CQC16012154495 |
| PSE | 50mA ~ 6.3A | PSE16021073 |
| KC | 50mA ~ 6.3A | SU05052-16004/16005/16006 |
Specification
| P/N | Rated current | Rated voltage | Max. Voltage Drop (mv) | I2TMelting Integral(A2.S) |
| MFS0200A | 200mA | 250V | 1700 | 0.04 |
| MFS0250A | 250mA | 250V | 1400 | 0.06 |
| MFS0315A | 315mA | 250V | 1300 | 0.1 |
| MFS0400A | 400mA | 250V | 1200 | 0.2 |
| MFS0500A | 500mA | 250V | 1100 | 0.35 |
| MFS0630A | 630mA | 250V | 650 | 0.5 |
| MFS0800A | 800mA | 250V | 240 | 1.3 |
| MFS1100A | 1A | 250V | 200 | 1.6 |
| MFS1125A | 1.25A | 250V | 200 | 2.4 |
| MFS1160A | 1.6A | 250V | 190 | 4.6 |
| MFS1200A | 2A | 250V | 170 | 7.9 |
| MFS1250A | 2.5A | 250V | 170 | 12 |
| MFS1315A | 3.15A | 250V | 150 | 22 |
| MFS1400A | 4A | 250V | 130 | 29 |
| MFS1500A | 5A | 250V | 130 | 78 |
| MFS1630A | 6.3A | 250V | 130 | 97 |
| MFS1800A | 8A | 250V | 100 | 290 |
| MFS2100A | 10A | 250V | 100 | 430 |
Dimension (mm)
![]()
Materials
| NO. | Part Name | Material |
| 1 | Cap | Black or Brown Thermoplastic Polyamide PA 6.6, UL 94 V-0 |
| 2 | Base | Black or Brown Thermoplastic Polyamide PA 6.6, UL 94 V-0 |
| 3 | Fuse element | Alloy |
| 4 | Lead wire | Copper, Tin-plated |
Melting Time
| % of Ampere Rating(In) | Melting Time |
| 150%* In | 60 min Minimum |
| 210%* In | 30 min Max |
| 275%* In | 10 ms~3 s |
| 400%* In | 3 ms~300 ms |
| 1000%* In | 20 ms Max |
Microfuse PCB Mount Holder
Company Details
Business Type:
Manufacturer,Exporter
Year Established:
2006
Total Annual:
1,500,000-2,500,000
Employee Number:
138~168
Ecer Certification:
Verified Supplier
Uchi was established in 2006 in Dongguan, China. After years of development, Uchi has become a large scale hi-tech enterprise that specialized in development and production of complete series of MOV,PTC, NTC series, PPTC series, Fuse(ALL TYPE),Resistor、integrated circuit 、 Capacitor, ... Uchi was established in 2006 in Dongguan, China. After years of development, Uchi has become a large scale hi-tech enterprise that specialized in development and production of complete series of MOV,PTC, NTC series, PPTC series, Fuse(ALL TYPE),Resistor、integrated circuit 、 Capacitor, ...
Get in touch with us
Leave a Message, we will call you back quickly!