Ecer asks for your consent to use your personal data to:
Personalised advertising and content, advertising and content measurement, audience research and services development
Store and/or access information on a device
Your personal data will be processed and information from your device (cookies, unique identifiers, and other device data) may be stored by, accessed by and shared with 135 TCF vendor(s) and 65 ad partner(s), or used specifically by this site or app.
Some vendors may process your personal data on the basis of legitimate interest, which you can object to by do not consent. Contact our platform customer service, you can also withdraw your consent.
Your message must
be between 20-3,000 characters!
Submit Requirement
Thank You!
Your requirement has been sent. we will contact you quickly!
{"title":"Durable Fully Welded Trailing Arm for 41x82 Double Spliced C Strut Channel with","imgUrl":"https:\/\/img.chinax.com\/nimg\/2e\/85\/96c07c72a0d6de9620543809bb31-200x200-1\/durable_fully_welded_trailing_arm_for_41x82_double_spliced_c_strut_channel_with.jpg","attrs":{"Packaging Details":"Wooden frame or cardboard box packaging, customizable","Shape":"C Channel","Certification":"ISO9001","Processing Service":"Cutting, Decoiling, Punching, Welding, Bending"}}
{"title":"20\uff5810 Cold Formed Slotted C Channel For Steel Structure And Building Constructio","imgUrl":"https:\/\/img.chinax.com\/nimg\/45\/bc\/7c312c982e6bde2aebeaf0742886-200x200-1\/20_ef_bd_9810_cold_formed_slotted_c_channel_for_steel_structure_and_building_construction.jpg","attrs":{"Place of Origin":"Hebei, China","Thickness":"1.5mm \/ 2.0mm \/ 2.5mm","Application":"Building operations","Price":"$ 0.9-2.4"}}
{"title":"Durable Carbon Steel Yellow Powder Coated C Strut Channel with Smooth Surface","imgUrl":"https:\/\/img.chinax.com\/nimg\/17\/cc\/01e63b493453c342583c993b1e93-200x200-1\/durable_carbon_steel_yellow_powder_coated_c_strut_channel_with_smooth_surface_and_anti_rust_properties_for_construction.jpg","attrs":{"Delivery Time":"Delivery within 15-30 days","Material":"Q235 Carbon Steel","Certification":"ISO9001","Processing performance":"Cutting, Decoiling, Punching, Welding, Bending"}}
{"title":"Durable C Strut Channel with Powder Coated Black Finish Cold Formed Steel","imgUrl":"https:\/\/img.chinax.com\/nimg\/82\/fa\/644f8c280ed3f0087bf0f21dd7a9-200x200-1\/durable_c_strut_channel_with_powder_coated_black_finish_cold_formed_steel_profile_for_mep_systems_photovoltaic_mounting_and_constr.jpg","attrs":{"Packaging Details":"Wooden frame or cardboard box packaging, customizable","Length":"1m-12m or Customer's Requirments","colors":"Support customization","Place of Origin":"Hebei, China"}}
{"title":"41x82 Hot Dipped Galvanized Double Spliced C Strut Channel with High Section","imgUrl":"https:\/\/img.chinax.com\/nimg\/24\/65\/c16bbfa7ec1d985d858f4dd3454d-200x200-1\/41x82_hot_dipped_galvanized_double_spliced_c_strut_channel_with_high_section_rigidity_for_large_diameter_pipeline_support.jpg","attrs":{"Certification":"ISO9001","Service":"Custom Metal Fabrication Service","Supply Ability":"50000 pieces per day","Usage":"Construction, Electromechanical, Machinery"}}
{"title":"Red Powder Coated C Channel Strut 1.5mm \/ 2.0mm For Fire Protection System","imgUrl":"https:\/\/img.chinax.com\/nimg\/8a\/6b\/04483473191b109d25fa9eb8e9ae-200x200-1\/red_powder_coated_c_channel_strut_1_5mm_2f_2_0mm_for_fire_protection_system.jpg","attrs":{"Certification":"ISO9001","Feature":"Corrosion Resistant, High Strength, Easy Installation, Modular Design","Supply Ability":"50000 pieces per day","Usage":"Construction, Electromechanical, Machinery"}}
{"title":"Heavy Duty 41 by 82 Double Combined C Strut Channel with High Load Bearing","imgUrl":"https:\/\/img.chinax.com\/nimg\/31\/ef\/8a4e7468e8e869d3aeb1d2ce404e-200x200-1\/heavy_duty_41_by_82_double_combined_c_strut_channel_with_high_load_bearing_capacity_for_construction_support_applications.jpg","attrs":{"Certification":"ISO9001","Service":"Custom Metal Fabrication Service","Payment Terms":"T\/T, PayPal, Xtransfer","Length":"1m-12m or Customer's Requirments"}}
Wooden frame or cardboard box packaging, customizable
Shape
C Channel
Processing Service
Cutting, Decoiling, Punching, Welding, Bending
Thickness
0.5-3.0mm or Customer's Requirements
Application
Building operations
Payment Terms
T/T, PayPal, Xtransfer
Process
Semi-welding + Stamping Forming
Delivery Time
Delivery within 15-30 days
Bearing Capacity
500-2000
Supply Ability
50000 pieces per day
Material
Q235/Q355 high strength steel
Certification
ISO9001
Place of Origin
Hebei, China
Fully‑Welded Trailing Arm for 41×82 C‑Section Steel, Heavy‑Duty Bracket Fitting for Solar, Cable Tray & Seismic Support Systems
Product Description:
This fully‑welded trailing arm is a heavy‑load core fitting specially matched for 41×82 double‑spliced C‑section steel support systems. Manufactured from high‑strength structural steel with full‑penetration continuous welding process, it delivers outstanding integral rigidity, anti‑vibration performance and high shear‑resistance, widely deployed for solar mounting brackets, large‑size cable tray supports, seismic bracing, factory steel structures and heavy‑duty pipeline hanging applications.
Perfectly compatible with standard 41×82 back‑to‑back double‑spliced C channel, the full‑welded connection eliminates partial‑weld hidden risks. The compact integrated structure efficiently disperses heavy loads and improves wind‑snow resistance capacity. It supports flexible position and angle adjustment during site assembly. Available with hot‑dip galvanized or powder‑sprayed anti‑corrosion finishes, it features long service lifespan and high cost‑efficiency. Well‑suited for industrial plants, municipal infrastructure projects and new‑energy power station constructions.
Parameter Name
Specification
Unit
Material
Q235 / Q355 High‑Strength Carbon Steel
—
Adapted C‑Section Steel
41×82 Double‑Spliced C‑Strut Channel
mm
Processing Technology
Fully‑Welded + Stamped Forming
—
Anti‑corrosion Treatment
Hot‑dip Galvanizing / Powder Coating
—
Bearing Capacity
800‑3000
N
Applicable Temperature
‑40 ~ 80
℃
Service Life
≥15
Year
Installation and Usage Notes:
Before installation, inspect the fully‑welded trailing arm completely. Confirm no cracks, welding defects or rust exist on weld seams and main body; verify product specification matches the 41×82 C‑section steel to be assembled.
During installation, adopt professional installation tools to connect trailing arm with 41×82 C‑channel. Ensure welding and bolt joints are fastened without looseness. Do not overload or force‑fit components to avoid structural damage.
Arrange installation position aligning with stress points of the whole support system. Adjust mounting angle according to actual site working conditions to realize uniform load distribution and prevent local stress concentration.
Complete comprehensive inspection after installation. Test bearing performance and structural stability; put into service only after passing all safety requirements.
In daily service period, regularly check welding seams and connecting positions. Maintain or replace components timely once rust, looseness or deformation occurs.
Strictly prohibit operation beyond rated bearing capacity and applicable temperature range to prevent safety accidents.
For transportation and storage, avoid heavy collision and extrusion. Store in dry and ventilated environment to prevent premature corrosion.
FAQ:
Q: Are you a factory or a trading company?
A: We are a professional manufacturing factory. You are welcome to visit our workshop anytime. Our workshop is equipped with a complete set of advanced steel‑structure processing equipment, which guarantees stable product quality and competitive factory‑direct prices.
Q: What is your delivery time?
A: Our sales representative will confirm exact lead time based on your order details. For bulk orders, please communicate with our production department in advance. Normally production finishes within 30 days after receiving deposit, partial shipment is acceptable for large‑volume orders.
Q: Can you offer design service?
A: Yes. Our experienced engineering team can provide customized solutions according to your project requirements. We supply architectural drawings, structural sketches, processing drawings and installation blueprints for your confirmation at different construction stages.
Q: What are your payment terms?
A: 30% deposit in advance, 70% balance settled before shipment.
Q: How do you control the quality of your product?
A: a) Design review: Anticipate potential risks in advance and deliver reliable structural solutions;
b) Raw material control: Only qualified steel raw materials are adopted;
c) Production control: Precision fabrication techniques, skilled operators and strict on‑line quality inspection.
Company Details
Bronze Gleitlager
,
Bronze Sleeve Bushings
and
Graphite Plugged Bushings
from Quality China Factory
Business Type:
Manufacturer,Exporter,Seller
Year Established:
2002
Total Annual:
12000000-15000000
Employee Number:
100~120
Ecer Certification:
Verified Supplier
Yaoguang New Energy Technology Co., Ltd is a China-based manufacturer specializing in C channel steel and cold formed steel sections. Our main products include galvanized C channels, pre-galvanized C purlins, lipped C profiles, slotted C channels, and custom roll formed sections. These products are ... Yaoguang New Energy Technology Co., Ltd is a China-based manufacturer specializing in C channel steel and cold formed steel sections. Our main products include galvanized C channels, pre-galvanized C purlins, lipped C profiles, slotted C channels, and custom roll formed sections. These products are ...