| Payment Terms | L/C,T/T |
| Supply Ability | Supply According to Customer Needs |
| Delivery Time | According to Order Confirmation |
| Packaging Details | Packing According to Customer Requirements |
| Counterweight | 50 tons |
| Heavy Boom | 24-84m |
| Operating Weight | 130 tons |
| Engine Output Power | 242kW |
| Crawler Width | 1.5 meters |
| Core Components | PLC, Engine,Motor, Reducer, Pump |
| Crawler Length | 8 meters |
| Light Boom | 78-126m |
| Brand Name | XCMG |
| Model Number | XLC220 |
| Place of Origin | China |
View Detail Information
Explore similar products
55T Hydraulic Crawler Crane In Bridge Construction XGC55 203.5t.M
Second Hand Xcmg Crawler Crane 55 Ton For Rescue And Emergency
Complex Terrain Crawler Crane 55 Ton / XCMG Used Crawler Crane
Power Industry Second Hand Crawler Cranes 220T XLC220 1239t.M
Product Specification
| Payment Terms | L/C,T/T | Supply Ability | Supply According to Customer Needs |
| Delivery Time | According to Order Confirmation | Packaging Details | Packing According to Customer Requirements |
| Counterweight | 50 tons | Heavy Boom | 24-84m |
| Operating Weight | 130 tons | Engine Output Power | 242kW |
| Crawler Width | 1.5 meters | Core Components | PLC, Engine,Motor, Reducer, Pump |
| Crawler Length | 8 meters | Light Boom | 78-126m |
| Brand Name | XCMG | Model Number | XLC220 |
| Place of Origin | China | ||
| High Light | 220T Second Hand Crawler Cranes ,Crawler Cranes Hydraulic XLC220 ,XLC220 XCMG Crawler Crane | ||
Crawler crane models: XLC220
Max rated lifting capacity: 220t
Max lifting moment: 1239t.m
Typical working conditions
Main boom working condition_No arm end pulley HB/1_55t+21t main boom main hook performance
| Operating radius(m) | Main boom length(m) | |||||||||
| 53 | 56 | 59 | 62 | 65 | 68 | 71* | 74* | 77* | 80* | |
| 10 | 81 | 79.2 | 77.5 | 68.5 |
|
|
|
|
|
|
| 12 | 66.4 | 65.1 | 63.8 | 62.6 | 61.3 | 60.3 | 59 | 55 |
|
|
| 14 | 55.9 | 54.9 | 53.9 | 52.9 | 51.9 | 51.1 | 50 | 49.3 | 48.3 | 44.6 |
| 16 | 48 | 47.2 | 46.4 | 45.5 | 44.7 | 44 | 43.1 | 42.5 | 41.7 | 41.1 |
| 18 | 41 | 40.8 | 40.4 | 39.7 | 39 | 38.4 | 37.7 | 37.2 | 36.5 | 35.9 |
| 20 | 35.2 | 35 | 34.9 | 34.7 | 34.4 | 33.9 | 33.2 | 32.8 | 32.2 | 31.7 |
| 22 | 30.7 | 30.5 | 30.3 | 30.1 | 29.9 | 29.9 | 29.5 | 29.2 | 28.6 | 28.2 |
| 24 | 27 | 26.8 | 26.6 | 26.5 | 26.2 | 26.2 | 25.9 | 25.9 | 25.6 | 25.2 |
| 26 | 24 | 23.8 | 23.6 | 23.4 | 23.2 | 23.1 | 22.8 | 22.8 | 22.6 | 22.5 |
| 28 | 21.4 | 21.2 | 21.1 | 20.9 | 20.6 | 20.6 | 20.3 | 20.3 | 20 | 19.9 |
| 30 | 19.2 | 19.1 | 18.9 | 18.7 | 18.5 | 18.4 | 18.1 | 18.1 | 17.8 | 17.7 |
| 32 | 17.4 | 17.2 | 17 | 16.8 | 16.6 | 16.5 | 16.2 | 16.2 | 16 | 15.8 |
| 34 | 15.7 | 15.6 | 15.4 | 15.2 | 14.9 | 14.9 | 14.6 | 14.6 | 14.3 | 14.2 |
| 36 | 14.3 | 14.1 | 13.9 | 13.7 | 13.5 | 13.4 | 13.1 | 13.1 | 12.9 | 12.8 |
| 38 | 13 | 12.8 | 12.7 | 12.5 | 12.2 | 12.1 | 11.9 | 11.9 | 11.6 | 11.5 |
| 40 | 11.9 | 11.7 | 11.5 | 11.3 | 11.1 | 11 | 10.7 | 10.7 | 10.5 | 10.3 |
| 42 | 10.8 | 10.7 | 10.5 | 10.3 | 10.1 | 10 | 9.7 | 9.7 | 9.5 | 9.3 |
| 44 | 9.9 | 9.8 | 9.6 | 9.4 | 9.1 | 9.1 | 8.8 | 8.8 | 8.5 | 8.4 |
| 46 | 9.1 | 8.9 | 8.7 | 8.5 | 8.3 | 8.2 | 7.9 | 7.9 | 7.7 | 7.6 |
| 48 |
| 8.1 | 7.9 | 7.8 | 7.5 | 7.4 | 7.2 | 7.2 | 6.9 | 6.8 |
| 50 |
| 7.4 | 7.2 | 7.1 | 6.8 | 6.7 | 6.5 | 6.5 | 6.2 | 6.1 |
| 52 |
|
| 6.6 | 6.4 | 6.2 | 6.1 | 5.8 | 5.8 | 5.6 | 5.5 |
| 54 |
|
|
| 5.8 | 5.6 | 5.5 | 5.2 | 5.2 | 5 | 4.9 |
| 56 |
|
|
|
| 5 | 4.9 | 4.7 | 4.7 | 4.4 | 4.3 |
| 58 |
|
|
|
| 4.5 | 4.4 | 4.2 | 4.2 | 3.9 | 3.8 |
| 60 |
|
|
|
|
| 3.9 | 3.7 | 3.7 | 3.4 | 3.3 |
| 62 |
|
|
|
|
|
| 3.2 | 3.2 | 3 | 2.9 |
| 64 |
|
|
|
|
|
|
| 2.8 | 2.6 | 2.5 |
| 66 |
|
|
|
|
|
|
| 2.4 | 2.2 | 2.1 |
| Magnification | 7 | 6 | 6 | 6 | 6 | 5 | 5 | 4 | 4 | 4 |
Notes:
1.When the main boom length exceeds 71m, a waist rope is required for the combination at the "*" position. When the main boom length exceeds 74m, it is recommended to use an inclined wedge to assist in raising the boom.
2.The tower arm rear pull plate needs to be removed from each boom section, and the tower arm guide pulley needs to be removed from the top section of the main boom.
Main boom working conditions_Characteristics of main boom hook with boom end pulley auxiliary hook (HBS/1)
Main boom working condition_Working range of main boom main hook with arm end pulley auxiliary hook (HBS/1)
![]()
Company Details
Business Type:
Manufacturer,Exporter,Seller
Year Established:
2015
Total Annual:
10 millon-50millon
Employee Number:
50~100
Ecer Certification:
Active Member
Shandong Tengfei Hoisting Engineering Co., Ltd. is a Chinese company that sells second-hand crane equipment for self-use, with more than ten years of sales experience. All our crane equipment is from our own projects, the equipment is in good condition, there are no middlemen, and the price is bette... Shandong Tengfei Hoisting Engineering Co., Ltd. is a Chinese company that sells second-hand crane equipment for self-use, with more than ten years of sales experience. All our crane equipment is from our own projects, the equipment is in good condition, there are no middlemen, and the price is bette...
Get in touch with us
Leave a Message, we will call you back quickly!