Payment Terms | L/C, T/T |
Supply Ability | 5 sets/month |
Delivery Time | 3 months |
Packaging Details | Wooden case |
Name | Plastic Flat Yarn Extrusion Machine |
Max.Extrusion Volume | 330kg/H |
Screw Dia | 100mm |
Ratio of L/D | 33:1 |
Rotate Speed of Screw | 20-120r/Min |
Length of Mold Lip | 800mm |
Max.Production Speed | 450m/Min |
Flat Yarn Fibre Scope | 60-200tex |
Drwing of Winde | 4-10 |
Winder | 132 Spindles |
Warranty | 1 Year |
Origin | China |
Condition | New |
Brand Name | UW |
Model Number | UW-G100x33-800 |
Place of Origin | CHINA |
View Detail Information
Explore similar products
PP/HDPE Flat Yarn Tape Extrusion Line For Woven Cement Bag Container Bags
PP Tape Extrusion Line Plastic Extruding Flat Film Stretching Machine 380KW
Pp PE Polyethylene Tape Extrusion Line For Rafia Monofilament Strapping Tape
Polypropylene Tape Extrusion Line Plastic Cement Bag Making Machine
Product Specification
Payment Terms | L/C, T/T | Supply Ability | 5 sets/month |
Delivery Time | 3 months | Packaging Details | Wooden case |
Name | Plastic Flat Yarn Extrusion Machine | Max.Extrusion Volume | 330kg/H |
Screw Dia | 100mm | Ratio of L/D | 33:1 |
Rotate Speed of Screw | 20-120r/Min | Length of Mold Lip | 800mm |
Max.Production Speed | 450m/Min | Flat Yarn Fibre Scope | 60-200tex |
Drwing of Winde | 4-10 | Winder | 132 Spindles |
Warranty | 1 Year | Origin | China |
Condition | New | Brand Name | UW |
Model Number | UW-G100x33-800 | Place of Origin | CHINA |
High Light | Flat Yarn Extrusion Production Line ,330 kg/H Tape Extrusion Production Line ,HDPE Tape Extrusion Production Line |
High Speed Plastic Extrusion Flat Film Stretching Machine Flat Yarn Extrusion Production Line
Features:
1.Electrical control unit: adopt the European famous-brand processor control (PC) to monitor and control the whole line centrally and fully,
bring the easier operation and more stability. (option)
2. Slitting unit: adopt thenew-typeadjustable strucure, prolong the blade using time.
3. Integrated holding unit: renew the previous film take-off and holding structure, meet the higher line speed requirement.
4.Electric component unit: adopt world-famous brand product with international guarantee.
5. Apple to produce the PP, HDPE normal tape, fibrillated tape, folded tape and some other flat-type tape with various specifications.
Technical Parameters:
Item | UW-G100×33-800 | UW-G110×33-1100 | UW-G120×33-1300 | UW-G130×33-1500 |
Max.extrusion volume | 330kg/h | 400kg/h | 500kg/h | 600kg/h |
Screw Dia | Φ100mm | Φ110mm | Φ120mm | Φ130mm |
Ratio of L/D | 33:1 | 33:1 | 33:1 | 33:1 |
Rotate speed of screw | 20-120r/min | |||
Length of mold lip | 800mm | 1100mm | 1300mm | 1500mm |
Max.production speed | 450m/min | |||
Flat yarm fibre scope | 60-200tex | |||
Drwing of winde | 4-10 | |||
Winding number | 132Spindles | 180Spindles | 216Spindles | 252Spindles |
Machine Configuration:
Standard | Option |
Material loading | Hot air oven,length 6 m |
Auto vacuum material-feeding loader | |
Film take-off | Melt pump |
With multi drives and moisture absorption unit | |
Automatic filter | Static mixer |
Flat Die | Screw type loader/mixing unit Gravvimetric dosing/mixing unit |
Water quench tank | Flat tape fibrilator unit |
Slitting Unit | Flat tape fibrilator unit |
Integrated holding unit | Film thickness gauge and control system |
Edge trim recycle and reefed system | Industrial Process Computer/Eurpe |
Stretching section with 6 godets, incl.heating unit | Multi stretching and annealing section |
Vacuum tape extraction incl.collection box |
Product structure diagram:
Applications:
FAQ:
1. How long will your engineer reach our factory?
Within one week after everything ready (machine arrival your factory, non-woven material, power source, air compressor etc. Prepared)
2. How many days will you finish installing?
We will finish installation and training within 15 days.
3. What should we charge for your engineer?
You should charge for the cost of our engineer's air tickets, hotel, food, and also their salary 80USD one day per person.
4. How long is your machine's warranty period?
All our machine has one year guarantee for electricity parts and two years guarantee for mechanism, starting from finished installation.
5. How could you do if the parts broken within warranty?
We would express the free replacement parts during the warranty date
6. How could you do after one year warranty period?
We also can-do service for you, but you need pay salary for our technicians 80USD/day for each person.
7. What is your terms of payment ?
30% T/T in advance ,balance before shipment.
Company Details
Business Type:
Manufacturer,Exporter
Year Established:
2009
Total Annual:
20,000,000-30,000,000
Employee Number:
10~50
Ecer Certification:
Verified Supplier
Company Introduction: Our company is a professional manufacturer and exporter with design, development and production of pp woven machines, non-woven machines, monofilament production line adhesive tape machine, multifilament extrusion intertwisting machine, circular looms and spare par... Company Introduction: Our company is a professional manufacturer and exporter with design, development and production of pp woven machines, non-woven machines, monofilament production line adhesive tape machine, multifilament extrusion intertwisting machine, circular looms and spare par...
Get in touch with us
Leave a Message, we will call you back quickly!