| Payment Terms | L/C,T/T,Western Union,MoneyGram |
| Supply Ability | 20000 Set/Sets per Month |
| Delivery Time | 30 work days |
| Packaging Details | 570x340x165 |
| Durability | Corrosion Resistant |
| Max Temperature | 80°C |
| Productname | Gas Boiler Accessories |
| Compatible With | Natural Gas and LP Gas |
| Weight | Depends on Specific Accessory |
| Gas Type | NG LPG |
| Warranty | 1 Year Manufacturer Warranty |
| Applicable Use | Hotel, Household |
| Brand Name | Vanka |
| Certification | ISO9001:2015,CE |
| Place of Origin | China |
View Detail Information
Explore similar products
Gas Combi Boiler Accessories Control Board Control Board For Home Appliances
Combination Gas Boiler Accessories Cast Aluminum Gas Proportional Valve
Wall Mounted Gas Boiler Accessories Hydraulic Module Floor Heating Systems
15KW–36KW Condensing Gas Boiler Part – Wall Mount Heat Exchanger Core
Product Specification
| Payment Terms | L/C,T/T,Western Union,MoneyGram | Supply Ability | 20000 Set/Sets per Month |
| Delivery Time | 30 work days | Packaging Details | 570x340x165 |
| Durability | Corrosion Resistant | Max Temperature | 80°C |
| Productname | Gas Boiler Accessories | Compatible With | Natural Gas and LP Gas |
| Weight | Depends on Specific Accessory | Gas Type | NG LPG |
| Warranty | 1 Year Manufacturer Warranty | Applicable Use | Hotel, Household |
| Brand Name | Vanka | Certification | ISO9001:2015,CE |
| Place of Origin | China | ||
| High Light | 35 row burner tray boiler component ,industrial grade boiler heating tray ,gas boiler replacement burner tray | ||
35 Row Burner Tray Industrial Grade Boiler Heating Replacement Component
Ultra-High 35-Row Matrix – The industry's highest density configuration provides up to 40% greater active combustion surface area versus standard trays, enabling unprecedented heat flux and rapid system response.
Forged for Extreme Duty – Constructed from Grade 310H Stainless Steel or Inconel-alloy variants, engineered to withstand sustained temperatures exceeding 1150°C and resist thermal fatigue, creep, and oxidation.
Intelligent Air-Fuel Stratification – Incorporates multi-stage venturi & baffle technology that ensures optimal stoichiometric mixing across all 35 rows, eliminating cold spots and maximizing combustion efficiency (>99.8%).
Global Project Support – Backed by a dedicated engineering team offering CFD simulation, combustion analysis, and on-site commissioning support for turnkey projects.
| Parameter | Specification |
|---|---|
| Product Class | Industrial Mega-Capacity Burner Tray |
| Row Configuration | 35 rows, ultra-high-density staggered array |
| Primary Applications | Utility Power Boilers, Large Industrial Steam Generators, Cogeneration (CHP) Plants, District Heating Hubs |
| Fuel Flexibility | Natural Gas / Heavy Oil / Syngas / Dual-Fuel & Tri-Fuel Configurations |
| Thermal Capacity Range | 5 MW – 50 MW+ (Scalable per project design) |
| Core Material Options | 310H Stainless Steel / Inconel 601/625 / Custom High-Temp Alloys |
| Design Pressure | Up to 4.0 MPa (580 PSI) |
| Connection Standard | ANSI B16.5 / DIN / JIS Flanges (Customizable) |
| Typical Dimensions | 800–1500 mm (Length) × 400–600 mm (Width) – Fully Customizable |
Q1: What scale of operation is this 35-row tray designed for?
A1: It is engineered for utility-scale and heavy industrial applications, including power plants (>10MW), large industrial complexes, refinery heaters, and major district energy systems requiring extreme reliability and output.
Q2: Can this component be integrated into existing boiler retrofits or must it be part of a new build?
A2: It is designed for both. We provide full retrofit engineering packages, including 3D laser scanning of existing combustion chambers, CFD modeling for integration analysis, and custom fabrication to match legacy flange and mounting layouts.
Q3: What is the lead time for a custom project of this scale?
A3: For engineered-to-order projects: 8–12 weeks from final design approval to shipment. This includes material procurement, precision fabrication, welding, NDT testing, and pre-shipment inspection. Expedited options are available.
Q4: What technical support do you provide during commissioning?
A4: We offer tiered support packages: Basic (documentation & remote guidance), Standard (onsite supervisor for 3–5 days), and Premium (full commissioning team including combustion tuning and operator training).
Company Details
Business Type:
Manufacturer
Year Established:
2019
Total Annual:
5-15
Employee Number:
50~100
Ecer Certification:
Verified Supplier
.gtr-container-mno456pqr { font-family: Verdana, Helvetica, "Times New Roman", Arial, sans-serif; color: #333; line-height: 1.6; padding: 20px; max-width: 100%; box-sizing: border-box; } .gtr-container-mno456pqr__title { font-size: 18px; font-weight: bold; margi... .gtr-container-mno456pqr { font-family: Verdana, Helvetica, "Times New Roman", Arial, sans-serif; color: #333; line-height: 1.6; padding: 20px; max-width: 100%; box-sizing: border-box; } .gtr-container-mno456pqr__title { font-size: 18px; font-weight: bold; margi...
Get in touch with us
Leave a Message, we will call you back quickly!