Products
Manufacturer of a wide range of products which include Powder Coating Carton Pallet Flow Rack Aluminum Alloy Flow Rails With Plastic Rollers,Double Deep Adjustable Warehouse Racking 500kg Per Pallet,2500kg Q235B Double Deep Select...
MOQ: Negotiation
Price: Negotiation
Payment Terms | T/T |
Supply Ability | around 12,500,000 kg per year |
Delivery Time | around 34 days upon receipt the signed, stamped PO and deposit |
Packaging Details | Standard packaging, wrapped by plastic films, strips, and plywood pallets, plywood boxes |
Product Name | Carton flow rack |
Alternative Name | dynamic flow rack |
Load capacity | 100 ~ 1000 kg per level |
Design | Racking with inclined roller levels |
Surface Finish | Powder coating or galvanizing |
Workmanship | Cutting, punching, welding, pre-treatment, painting |
Brand Name | HUADE |
Model Number | HD-CFR-3 |
Certification | R-mark / ISO 9001 / ISO 14001 |
Place of Origin | China |
MOQ: Negotiation
Price: Negotiation
Payment Terms | T/T |
Supply Ability | around 1000 tons per week |
Delivery Time | around 20 or 25 days upon receipt signed & stamped PO and deposit |
Packaging Details | standard packaging, wrapped by the plastic strips |
Product Name | double deep pallet racking system |
Max. load capacity | 2500 kg per pallet |
Steel grade | Q235B or Q345 |
Standards | FEM, RMI |
Surface finish | Powder coating &Galvanized |
Use | Warehouse Rack |
Brand Name | HUADE |
Model Number | HD-PR-10 |
Certification | R-mark / ISO9001 / 14001 |
Place of Origin | China |
MOQ: Negotiation
Price: Negotiation
Payment Terms | T/T |
Supply Ability | around 1000 tons per week |
Delivery Time | around 20 or 25 days upon receipt signed & stamped PO and deposit |
Packaging Details | standard packaging, wrapped by the plastic strips |
Product Name | double deep pallet racking system |
Max. load capacity | 2500 kg per pallet |
Steel grade | Q235B or Q345 |
Standards | FEM, RMI |
Surface finish | Powder coating &Galvanized |
Use | Warehouse Rack |
Brand Name | HUADE |
Model Number | HD-PR-10 |
Certification | R-mark / ISO9001 / 14001 |
Place of Origin | China |
MOQ: Negotiable
Price: Negotiable
Payment Terms | T/T |
Supply Ability | 4000 tons/month |
Delivery Time | around 4~6 weeks receipt signed & stamped PO and deposit |
Packaging Details | Steel parts wrapped by plastic films and electric parts packed by plywood boxes |
Material: | Q235 steel, |
Certification: | CE, ISO9001:2015 |
Place of Origin: | Nanjing, Jiangsu, China |
HS code: | 7308900000 |
Packaging : | Both uprights and beams packed inside bundled tightly with steel belts. with PE film Covered all ,Paper cartons for accessories. |
Port: | Nanjing or Shanghai (Nanjing is recommended for economic reason) |
Brand Name | Huade |
Model Number | HD-CFR |
Certification | ISO9001 / CE / R-mark from RMI |
Place of Origin | China |
MOQ: Negotiable
Price: Negotiable
Payment Terms | T/T |
Supply Ability | 4000 tons/month |
Delivery Time | around 5~6 weeks receipt signed & stamped PO and deposit |
Packaging Details | Steel parts wrapped by plastic films and electric parts packed by plywood boxes |
Material | S235JR Steel |
Standard | FEM / RMI |
Finish | Expoxy Electrostatic Powder Coating |
Size | Customized |
Color | RAL system |
Brand Name | Huade |
Model Number | HD-CFR |
Certification | ISO 9001/14001 |
Place of Origin | China |
MOQ: Negotiation
Price: Negotiation
Payment Terms | T/T |
Supply Ability | around 12,500 tons per year |
Delivery Time | around 32 days upon receipt the signed, stamped PO and deposit |
Packaging Details | Steel parts wrapped by plastic films and strips, electric parts packed by plywood cartons |
Product Name | Carton flow rack |
Alternative Name | Gravity flow rack |
Load capacity | 100 ~ 1000 kg per level |
Steel | Q235B |
Standards | FEM / RMI |
Size | according to the requirement |
Brand Name | HUADE |
Model Number | HD-CFR-1 |
Certification | R-mark / ISO 9001, 14001 |
Place of Origin | China |
MOQ: Negotiation
Price: Negotiation
Payment Terms | T/T |
Supply Ability | around 12,500,000 kg per year |
Delivery Time | around 33 days upon receipt the signed, stamped PO and deposit |
Packaging Details | Steel parts wrapped by plastic films, strips, and plywood pallets and electric parts packed by plywood boxes |
Product Name | Carton flow rack |
Alternative Name | dynamic flow rack |
Load capacity | 100 ~ 1000 kg per level |
Structure | Racking with plastic rollers |
Warranty | 12 months |
Features | Free of maintenance |
Brand Name | HUADE |
Model Number | HD-CFR-2 |
Certification | R-mark / ISO 9001 / 14001 |
Place of Origin | China |
MOQ: Negotiation
Price: Negotiation
Payment Terms | T/T |
Supply Ability | around 12,500,000 kg per year |
Delivery Time | around 35 days upon receipt the signed, stamped PO and deposit |
Packaging Details | Standard packaging, wrapped by plastic films, strips, and plywood pallets, plywood boxes |
Product Name | Gravity flow rack |
Alternative Name | dynamic flow rack |
Load capacity | 100 ~ 1000 kg per level |
Advantages | clear visibility, goods easy to be found |
Disadvantages | Plastic rollers should be maintained carefully |
Color | Light grey, yellow, blue, orange, green |
Brand Name | HUADE |
Model Number | HD-CFR-4 |
Certification | ISO / RMI (R-mark) |
Place of Origin | China |
MOQ: Negotiation
Price: Negotiation
Payment Terms | T/T |
Supply Ability | around 12,500,000 kg per year |
Delivery Time | around 6 weeks upon receipt the signed, stamped PO and deposit |
Packaging Details | Export packaging, wrapped by plastic films and plywood pallets, plywood cartons |
Product Name | Carton flow rack |
Alternative Name | gravity flow rack |
Load capacity | 100 ~ 1000 kg per level |
Height | depending the height of the products and depth of the racking |
Width | depending on how many cartons being placed |
Depth | depending on depth of the cartons or boxes |
Brand Name | HUADE |
Model Number | HD-CFR-5 |
Certification | ISO 9001 / RMI (R-mark) |
Place of Origin | China |
MOQ: Negotiation
Price: Negotiation
Payment Terms | T/T |
Supply Ability | around 1000 tons per month |
Delivery Time | around 5-6 weeks upon receipt the signed, stamped PO and deposit |
Packaging Details | Export packaging and electric items packed by plywood boxes |
Product Name | Carton flow rack |
Steel | Q235b |
Standards | FEM / RMI |
Structure | Racking with inclined roller levels |
Warranty | 12 months |
Design | according to the requirement |
Brand Name | HUADE |
Model Number | HD-CFR-6 |
Certification | ISO 9001 / 14001 / RMI (R-mark) |
Place of Origin | China |
Explore more categories
Get in touch with us
Leave a Message, we will call you back quickly!