China factories

Chat Now Send Email
China factory - Zhengzhou Hengyang Industrial Co., Ltd

Zhengzhou Hengyang Industrial Co., Ltd

  • China,Zhengzhou ,Henan
  • Verified Supplier
  1. Home
  2. Products
  3. About Us
  4. Contact Us

Leave a Message

we will call you back quickly!

Submit Requirement
China Rock Gold Mining Steps
China Rock Gold Mining Steps

  1. China Rock Gold Mining Steps
  2. China Rock Gold Mining Steps
  3. China Rock Gold Mining Steps
  4. China Rock Gold Mining Steps
  5. China Rock Gold Mining Steps
  6. China Rock Gold Mining Steps

Rock Gold Mining Steps

  1. MOQ: 1
  2. Price: 35000-95700USD/set
  3. Get Latest Price
Payment Terms T/T
Supply Ability 30sets/month
Delivery Time 25-40 days
Packaging Details Negociated
OEM Accept
Condition New
Warranty 12 months
Application rock gold
Usage mineral mining
Brand Name hengyang
Model Number Gold mining
Certification ISO9001
Place of Origin China

View Detail Information

Inquiry by Email Get Latest Price
Chat online Now Ask for best deal
  1. Product Details
  2. Company Details

Product Specification

Payment Terms T/T Supply Ability 30sets/month
Delivery Time 25-40 days Packaging Details Negociated
OEM Accept Condition New
Warranty 12 months Application rock gold
Usage mineral mining Brand Name hengyang
Model Number Gold mining Certification ISO9001
Place of Origin China
High Light gold mining processing stepsmetallurgy gold extraction linerock gold ore processing

1. Mining – Open Pit and Underground — To define the ore from the waste rock, samples are taken and assayed. Assay results are used to mark out areas of ore and waste rock, which are mined separately. Some of the harder areas require blasting to loosen the rock prior to excavation by hydraulic diggers. Dump trucks haul the rock to the primary crushers in the open pit or to the ore stockpiles from underground.

2. Crushing — The primary crushers located at the open pit mine site, receive ore and waste at separate times. They break the larger rocks down to a size suitable for transport on the conveyor belt.

3. Transport — A rubber belted conveyor transports the ore and waste rock from the open pit, approximately two kilometres, via a tunnel through Union Hill, to the mill and waste rock embankments. Large electromagnets remove any steel debris excavated from the old Martha Mine workings.

4. Grinding and Sizing — Ore from both open pit and underground is stockpiled separately at the mill before being fed into a semi autogenous grinding (S.A.G.) mill with lime, water and steel balls. The larger particles from this mill are returned to the S.A.G. mill for more grinding. The finer particles receive more grinding in a ball mill, and are size classified to give a final product of 80% < microns.

5. Leaching and Adsorption — A slurry of ground ore, water and a weak cyanide solution is fed into large steel leach tanks where the gold and silver are dissolved. Following this leaching process the slurry passes through six adsorption tanks containing carbon granules, which adsorb the gold and silver. This process removes 93% of the gold and 70% of the silver.

6. Elution and Electrowinning — The loaded carbon is fed into an elution column where the bullion is washed off. The barren carbon is recycled. The wash solution—pregnant electrolyte—is passed through electrowinning cells where gold and silver is won onto stainless steel cathodes.

7. Bullion Production — The loaded cathodes are rinsed to yield a gold and silver bearing sludge which is dried, mixed with fluxes and put into the furnace. After several hours the molten material is poured into a cascade of moulds producing bars of doré bullion.

8. Water Treatment — Some water from dewatering the mine, from the embankment under-drains and decant water from the tailings pond is recycled for use in the grinding circuit. Excess water is pumped to the water treatment plant and treated to the required standards before discharge into the Ohinemuri River.

9. Tailings Disposal — Waste rock from the open pit mine is used to build the embankment structures. The embankments retain the tailings slurry in a pond where solids settle and compact. Water is decanted off and used in the process plant or treated before it is discharged.



Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer,Exporter

  • Year Established:

    2015

  • Total Annual:

    8500000-12000000

  • Employee Number:

    >95

  • Ecer Certification:

    Verified Supplier

Hengyang Industry is an Chinese Company based in Zhengzhou city that manufactures, on proprietary technology, plants and equipment for waste recycling and recovery with energy production, material recovery or production of finished goods. Innovation, R&D, passionate and skilled team along... Hengyang Industry is an Chinese Company based in Zhengzhou city that manufactures, on proprietary technology, plants and equipment for waste recycling and recovery with energy production, material recovery or production of finished goods. Innovation, R&D, passionate and skilled team along...

+ Read More

Get in touch with us

  • Reach Us
  • Zhengzhou Hengyang Industrial Co., Ltd
  • 500m West, Cross road of Rizhao and Industrial Road, Mazhai Industrial Zone, Zhengzhou City, China
  • https://www.wasteprocessingplant.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement