Products
Manufacturer of a wide range of products which include East Vertical Multi-Stage Centrifugal Pump for Conveying Machine Tool Coolant,Grundfos TP 125-745/2 Booster Vertical in-Line Circulating Pump Multistage,East Dfjc Dongfang Int...
MOQ: 1
Price: Negotiable
Payment Terms | L/C,D/A,D/P,T/T,Western Union,MoneyGram |
Supply Ability | Peak Season Lead Time: 1-3 months ,Off Season Lead Time: 1 month |
Delivery Time | 5-8 weeks |
Packaging Details | Standard Export Plywood Case or Carton |
Liquid Temperature | Normal Temperature and Hot Water |
Standard Voltage | 220V/50Hz.380V/50Hz.etc |
Protection Level | Lp55: Insulation Grade: F: |
Rotate Speed | 2900r/Min |
Maximum lift | 6~260m |
Maximum flow rate | 0.4~180m'/H |
Brand Name | East |
Model Number | DFLK DFLKF |
Place of Origin | China |
MOQ: 1
Price: Negotiable
Payment Terms | L/C,D/A,D/P,MoneyGram,Western Union,T/T |
Supply Ability | Peak Season Lead Time: 1-3 months Off Season Lead Time: 1-3 months |
Delivery Time | within 15 workdays |
Packaging Details | Wooden Box |
Liquid Conveyed | Water |
Liquid Temperature Range | -25 .. 120 °C |
Liquid Temperature During Operation | 20 °c |
Density | 998.2 Kg/M³ |
Rated Flow Rate | 265.3 m³/h |
Maximum Pressure at Specified Temperatur | 16 bar / 120 °C |
Power Supply Frequency | 50 Hz |
Rated Voltage | 3 x 380 V |
Rated Head | 66.83 m |
Ambient temperature range | -20 .. 40 °C |
Brand Name | Grundfos |
Model Number | TP 125-745/2 |
MOQ: 1
Price: Negotiable
Packaging Details | Wooden case packing |
Delivery Time | 5-8weeks |
Payment Terms | L/C,D/A,D/P,T/T,Western Union,MoneyGram |
Supply Ability | Peak Season Lead Time: 1-3 months Off Season Lead Time: 1-3 months |
Power Supply Voltage | 380V×(100±10%), Three - Phase Five - |
Ambient Temperature | –20°c to 50°c (Customization Is Avai |
Relative Air Humidity | 20% - 90% (at 20°c), Without Condensation |
Brand Name | East |
Model Number | Dfjc |
Place of Origin |
MOQ: 1
Price: Negotiable
Payment Terms | L/C,D/A,D/P,MoneyGram,Western Union,T/T |
Supply Ability | Peak Season Lead Time: 1-3 months Off Season Lead Time: 1-3 months |
Delivery Time | within 15 workdays |
Packaging Details | Wooden Box |
Maximum lift | 1000m |
Maximum flow rate | 1360 m³/H |
Flow Rate Range | 3.75 - 1360 M³/H |
Head Range | 46 - 1000 M |
Inlet Pressure | ≤ 0.6MPa |
Medium Temperature | -20°c - 105°c |
Brand Name | EAST |
Model Number | DP |
MOQ: 1
Price: Negotiable
Payment Terms | L/C,D/A,D/P,T/T,Western Union,MoneyGram |
Supply Ability | Peak Season Lead Time: 1-3 months ,Off Season Lead Time: 1 month |
Delivery Time | 5-8 weeks |
Packaging Details | Standard Export Plywood Case or Carton |
Flow Range | 2 - 1400 M³/H |
Head Range | 5 - 130 M |
The Maximum Working Pressure of The Pump | ≤ 1.6MPa |
That Is, The Suction Port Pressure + The | ≤ 1.6MPa |
Medium Temperature | -15ºC < T ≤ +80ºC. for The Hot - Wate |
Ambient Temperature | ≤ 40ºC |
Motor Insulation Class | Class B or Class F |
Motor Protection Class | IP54 or IP55 |
Brand Name | East |
Model Number | Dfp |
Place of Origin | china |
MOQ: 1
Price: Negotiable
Payment Terms | L/C,D/A,D/P,T/T,Western Union,MoneyGram |
Supply Ability | Peak Season Lead Time: 1-3 months ,Off Season Lead Time: 1 month |
Delivery Time | 5-8 weeks |
Packaging Details | Standard Export Plywood Case or Carton |
Liquid Conveyed | Water |
Liquid Temperature Range | 0 - 40 °c |
Liquid Temperature During Operation | 20 °c |
Density | 998.2 Kg/M³ |
Power Supply Frequency | 50 Hz |
Rated Voltage | 3 X 380 - 480 V |
Net Weight | 613 Kg |
Gross Weight | 766 Kg |
Brand Name | Grundfos |
Model Number | BMS HS |
Place of Origin | Germany |
MOQ: 1
Price: Negotiable
Payment Terms | L/C,D/A,D/P,T/T,Western Union,MoneyGram |
Supply Ability | Peak Season Lead Time: 1-3 months ,Off Season Lead Time: 1 month |
Delivery Time | 5-8 weeks |
Packaging Details | Standard Export Plywood Case or Carton |
Water Supply Flow Rate | 14 - 2373m³/H |
Water Supply Pressure | 0.2 - 0.32MPa |
Constant Pressure Accuracy | ±0.01MPa |
Pressure Stabilization Time | Less Than 15s |
Operation Modes | Manual, Automatic, Group Control |
Starting Mode | Soft Start of Variable - Frequency Pump |
Control Mode | Constant Pressure Control at The Equipment Outlet |
Human - Machine Interface | Color Touch Screen |
Brand Name | East |
Model Number | Dfjn-B |
Place of Origin | China |
MOQ: 1
Price: Negotiable
Payment Terms | L/C,D/A,D/P,T/T,Western Union,MoneyGram |
Supply Ability | Peak Season Lead Time: 1-3 months ,Off Season Lead Time: 1 month |
Delivery Time | 5-8 weeks |
Packaging Details | Standard Export Plywood Case or Carton |
Flow Rate | 70 - 3500 M³/H |
Head | 80 - 400 M |
Temperature of Conveyed Medium | -20 - 80°c |
Direction of Rotation | When Viewed From The Drive End, The Pump Rotates C |
Brand Name | |
Model Number | |
Place of Origin | Germany |
MOQ: 1
Price: Negotiable
Payment Terms | L/C,D/A,D/P,T/T,Western Union,MoneyGram |
Supply Ability | Peak Season Lead Time: 1-3 months ,Off Season Lead Time: 1 month |
Delivery Time | 5-8 weeks |
Packaging Details | Standard Export Plywood Case or Carton |
Flow Rate | 66 - 37000 M³/H |
Head | 5 - 180 M |
Inlet Pressure | < 0.3 MPa |
Conveyed Medium Temperature | Conventional ≤ 80°c, with Cooling Structure |
Brand Name | East |
Model Number | Dfms |
Place of Origin | China |
MOQ: 1
Price: Negotiable
Payment Terms | L/C,D/A,D/P,T/T,Western Union,MoneyGram |
Supply Ability | Peak Season Lead Time: 1-3 months ,Off Season Lead Time: 1 month |
Delivery Time | 5-8 weeks |
Packaging Details | Standard Export Plywood Case or Carton |
Bracket Type | Fixed Bracket |
Tilt Angle | 0 - 50° |
Bracket Height | < 3m |
Component Orientation | Horizontal/Vertical Placement |
Design Standard | AS/NZS 1170/Asce 7 - 10 |
Snow Load | < 300mm |
Wind Load | < 120 Km/H |
Structural Material | Galvanized Steel or Galvalume Steel |
Brand Name | East |
Model Number | DFQJ |
Place of Origin | China |
Explore more categories
Get in touch with us
Leave a Message, we will call you back quickly!