Payment Terms | D/P, D/A, L/C, T/T |
Supply Ability | 1000SET |
Delivery Time | 3 months |
Packaging Details | Wooden packing |
Efficiency | 99% |
Oem | Yes |
Rated rotor speed | 200rpm 300rpm 500rpm 600rpm 750rpm 1000rpm |
Condition | New |
Warranty | 1 Year(12 months) |
Feature | Bridge Crane |
Max. lifting load | 10ton |
Application | Workshop,Plants |
Brand Name | DSSD |
Model Number | Single beam crane |
Certification | CE,iso |
Place of Origin | china |
View Detail Information
Explore similar products
Industrial Span 30m 20 Ton Overhead Bridge Crane A6~A8 Duty
5 Ton 10 Ton 20 Ton 500 Ton Double Girder Overhead Travelling Crane
380V 50HZ 10T European Single Beam Bridge Crane
Industrial Warehouse Overhead Bridge Crane Lifting Equipment High Efficiency
Product Specification
Payment Terms | D/P, D/A, L/C, T/T | Supply Ability | 1000SET |
Delivery Time | 3 months | Packaging Details | Wooden packing |
Efficiency | 99% | Oem | Yes |
Rated rotor speed | 200rpm 300rpm 500rpm 600rpm 750rpm 1000rpm | Condition | New |
Warranty | 1 Year(12 months) | Feature | Bridge Crane |
Max. lifting load | 10ton | Application | Workshop,Plants |
Brand Name | DSSD | Model Number | Single beam crane |
Certification | CE,iso | Place of Origin | china |
High Light | 10T Single Beam Crane ,99% Efficiency Single Beam Crane ,TUV Overhead Bridge Crane |
Single beam crane
Product Paramenters
Maintenance of single beam crane
1. Before the original factory of the lifting equipment, it is necessary to keep a record of the true identity. Safety inspection and maintenance before installation of equipment: check the integrity of the key organizational characteristics of the machine and equipment, check the visible defects of the key steel frame structure and connections, and the axle pins and anchor bolts, and check the anti-corrosion status of the machine and equipment surface , Generate records, and show installation suggestions.
2. Lifting equipment, machinery and equipment are maintained by full-time personnel. After the delivery of machinery and equipment, the usual maintenance should be undertaken by the actual operator of the machinery and equipment or the staff of the application enterprise, and the installation and maintenance company shall be responsible for the supervision and inspection of the usual maintenance. The usual maintenance theme and thought section is summarized as "cross line work method": cleaning, tightening, lubricating, adjusting, and anti-corrosion. 10-30 minutes before and at the end of every day, inspect each part and location of the machinery and equipment to see if everything is normal, lubricate the oil according to the regulations, pay attention to whether the noise of the machinery and equipment is normal, and do a good job in the cleaning and shift work In order to exceed the appearance of the machinery and equipment to be clean and tidy, and to operate all normal purposes, the usual maintenance records and shift records must be made into fixed reports and kept as files.
Company Details
Business Type:
制造商
Year Established:
2007
Total Annual:
1000000-6000000
Employee Number:
>30-50
Ecer Certification:
Verified Supplier
德阳东森水电设备有限公司成立于2007年,公司专业研发,生产和销售水电站水轮发电机组及其辅助设备等.公司可提供各型机组设计,制造,设备成套,安装调试以及从事水电站投资等综合性服务.产品有混流,轴流,贯流,冲击,斜击式五大... 德阳东森水电设备有限公司成立于2007年,公司专业研发,生产和销售水电站水轮发电机组及其辅助设备等.公司可提供各型机组设计,制造,设备成套,安装调试以及从事水电站投资等综合性服务.产品有混流,轴流,贯流,冲击,斜击式五大...
Get in touch with us
Leave a Message, we will call you back quickly!