Payment Terms | T/T, Western Union |
Supply Ability | 100000 sets per year |
Delivery Time | 5-8 days after payment |
Packaging Details | Wooden case or naked |
Product Name | Big Pneumatic drill ST 350 Truck Mounted Drilling Machine Water Well Drilling Rig |
Application | drilling well,hammer for drills |
Air pressure | 1.25-3.5Mpa |
After-sales service provided | Engineers available to service machinery overseas |
Warranty | 1 Year |
Weight | 9800KG |
Power | 92Kw |
Usage | Water Well |
Hole diameter | 140-305mm |
Drill rod length | 1.5-6 |
Drilling depth | 350M |
Rod length | 6M |
Brand Name | SHITAN |
Model Number | ST350 |
Certification | ISO |
Place of Origin | China |
View Detail Information
Explore similar products
High Efficiency Portable Well Drilling Rig , XY-2B Hydraulic Borehole Drilling
Deep Water Well Drilling Rig Compact Structure With 150 - 180M Drilling Depth
High Efficiency Water Well Drilling Rig XY-3 300m Depth For Geothermal
220V / 380V Water Well Drilling Equipment , 180m Core Drilling Machine For
Product Specification
Payment Terms | T/T, Western Union | Supply Ability | 100000 sets per year |
Delivery Time | 5-8 days after payment | Packaging Details | Wooden case or naked |
Product Name | Big Pneumatic drill ST 350 Truck Mounted Drilling Machine Water Well Drilling Rig | Application | drilling well,hammer for drills |
Air pressure | 1.25-3.5Mpa | After-sales service provided | Engineers available to service machinery overseas |
Warranty | 1 Year | Weight | 9800KG |
Power | 92Kw | Usage | Water Well |
Hole diameter | 140-305mm | Drill rod length | 1.5-6 |
Drilling depth | 350M | Rod length | 6M |
Brand Name | SHITAN | Model Number | ST350 |
Certification | ISO | Place of Origin | China |
High Light | 350 truck mounted water well drilling rig ,ISO truck mounted water well drilling rig ,trailer mounted drilling machine 350 |
Big Pneumatic drill ST 350 Truck Mounted Drilling Machine Water Well Drilling Rig
ST 350 Truck Mounted Drilling Machine Water Well Drilling Rig Introduction
The rig uses full hydraulic control, and the Top drive to drive the rotation of drilling tools
Reasonable overall layout uses the tractor-mounted or full ground chassis for transportation with good maneuverability. Veryflexible in difficult roads and can be widely used in many fields such as resource exploration of hydrology wells, coalbed methane, the shallow layer of shale gas, terrestrial heat, etc, and can also be used for coal-mine gas exploitation salvage work.
ST 350 Truck Mounted Drilling Machine Water Well Drilling Rig Tech Data
Technical Parameters of ST350 water well drilling rig | |
type | ST350 |
The weight | 9.8T |
Dimension | 6m×2m×2.5m |
The hole diameter | 105-305mm |
Drilling depth | 350m |
One-time advance length | 6m |
Walking speed | 2.5KM/H |
Climbing angles | 30 |
Power | 92KW |
Using air pressure | 1.7-3.3MPA |
Air consumption | 17-35 |
Drill pipe length | 1.5m 2.0m 3.0m 6.0m |
Drill pipe diameter | 89mm,102mm, |
Rig lifting force | 20T |
Swing speed | 55-115rpm |
Swing torque | 6200-85000N.m |
ST 350 Truck Mounted Drilling Machine Water Well Drilling Rig Features
1. Drilling rig drive can be divided into mechanical drive, alternating current drive, direct current drive, compound drive and other forms, with reasonable power matching, high transmission efficiency and reliability. The machine layout is reasonable, the use of standardized, modular design, a variety of combinations of versatility, interchangeability, high degree of integration, installation, transport fast.
2. assembled in sections, connected by bolts or pin shafts. The lifting is divided into vertical lifting in sections or overall rotating lifting, and equipped with buffer device in place to ensure stable and safe positioning.
3. The substructure is in the form of spiral lift, double lift, box stacked, telescopic and so on.
4. The main brake adopts band brake or hydraulic disc brake, the auxiliary brake adopts pneumatic water-cooled push-disk brake, electromagnetic eddy current brake, or the auxiliary brake is made by energy consumption braking of ac frequency conversion motor.
ST 350 Truck Mounted Drilling Machine Water Well Drilling Rig FAQ
1. Q: Are you trading company or manufacturer?
A: We are manufacturer.
2. Q: How long is your delivery time?
A: It is according to the model and quantity.Generally it is 3-5 days if the machines are in stock.It will be 15-30 days if you want to customize the machines.
3. Q: Do you provide samples? Is it free or extra?
A: Yes, we could offer you the sample machine.But it's not free. You need to pay for the sample and the cost of freight.
4. What are the delivery times?
Company Details
Business Type:
Manufacturer,Exporter,Seller
Year Established:
2010
Total Annual:
50000000-100000000
Employee Number:
100~120
Ecer Certification:
Verified Supplier
Jinzhou City Shitan Machinery Equipment CO. LTD. is a professional production and processing company for core drilling rigs, crawler drilling rigs, various track chassis, various types of mud pumps, various track transport vehicles, etc. It is one of the outstanding manufacturers o... Jinzhou City Shitan Machinery Equipment CO. LTD. is a professional production and processing company for core drilling rigs, crawler drilling rigs, various track chassis, various types of mud pumps, various track transport vehicles, etc. It is one of the outstanding manufacturers o...
Get in touch with us
Leave a Message, we will call you back quickly!