Payment Terms | T/T, Western Union |
Supply Ability | 2000Set/Year |
Delivery Time | Within 7-12 days |
Packaging Details | Standard export transportation package |
Production Name | GK 200 Geological Drilling Rig |
Model | GK-200 |
Drilling Depth | 200 meters |
Drilling Hole Diameter | Customized |
Power | Diesel Engine |
Application | Engineering ,Coring and Sampling |
Voltage: | 220v |
Weight: | 600kg |
Brand Name | ShiTan |
Model Number | GK-200 |
Certification | ISO9001 |
Place of Origin | China |
View Detail Information
Explore similar products
200 Meter Water Borehole Drilling Rig , Borehole Drilling Machine With
800 Meter Water Borehole Drilling Rig Machine With Compressor
HH180 Geological Drilling Rig Machine Gold Mining Machine With Fully Hydraulic
Reliable Geological Drilling Rig Machine, XY-1B Exploration Drill Rigs
Product Specification
Payment Terms | T/T, Western Union | Supply Ability | 2000Set/Year |
Delivery Time | Within 7-12 days | Packaging Details | Standard export transportation package |
Production Name | GK 200 Geological Drilling Rig | Model | GK-200 |
Drilling Depth | 200 meters | Drilling Hole Diameter | Customized |
Power | Diesel Engine | Application | Engineering ,Coring and Sampling |
Voltage: | 220v | Weight: | 600kg |
Brand Name | ShiTan | Model Number | GK-200 |
Certification | ISO9001 | Place of Origin | China |
High Light | mining exploration geological drilling rig ,300mm hole diameter geological drilling rig ,high speed engineering geological drill rig |
200 Meters Drilling Depth Mining Exploration Geological Drilling Rig Machine
GK 200 Geological Drilling Rig Introduction
The drilling rig is suitable for engineering geological survey of buildings such as civil engineering, railways, hydropower, transportation, bridges, dam foundations, etc.; geological core drilling and physical exploration; small grouting holes, geothermal holes, blasting holes, drilling of various concrete detecting holes Advance; small well drilling, small pile hole.
Drilling Rig Product Model | |
Drilling diameter(mm) | 75,91,110,130,150,300 |
Drilling depth (m) | 200,150,100,70,50,30 |
Drill pipe diameter (mm) | 42,50 |
Drilling angle(°) | 90~75 |
Equipment size(L * B * H) | 1730 * 860 * 1360 (mm) |
Rig weight (except engine) | 700 |
Mobile device | |
Moving length | 350mm |
Leave distance | 300mm |
Gyrator | |
Spindle speed (four gear) (r/min) | 115,230,505,1010 |
Spindle travel(mm) | 450 |
Spindle no-load lifting maximum moving speed(m/s) | 0.05 |
Spindle no load drop maximum movement speed(m/s) | 0.067 |
Spindle maximum feed pressure(KN) | 15 |
Spindle maximum lifting force(KN) | 25 |
Spindle maximum output torque(KN• m) | 1.5 |
Winch assembly | |
Winch maximum lifting force (single rope) | 20 |
Reel speed (r/min) | 20,39,85,170 |
Reel circumferential speed(m/s) | 0.172, 0.345, 0.738, 1.476 |
Reel diameter(mm) | 140 |
Wire rope diameter(mm) | 9.3 |
Wire rope density (m) | 40 |
Brake diameter(mm) | 278 |
Brake band width (mm) | 50 |
Pump type | Horizontal single cylinder double acting |
Maximum displacement (motor)(L/min) | 95 (77) |
The maximum allowable pressure (Mpa) | 1.2 |
Work pressure (Mpa) | 0.7 |
Cylinder diameter (mm) | 80 |
Piston stroke(mm) | 100 |
Oil pump | |
Oil pump type | YBC-20/125 |
Nominal pressure (Mpa) | 12.5 |
Rated flow(ml/r) | 20 |
Rated speed(r/min) | 800-2500 |
Diesel engine or motor | |
Diesel engine | 1110 |
Rated power (KW) | 16.2 |
Rated speed (r/min) | 2200 |
Rated pressure(Mpa) | 12.5 |
Motor type | Y160M - 4 |
Rated power (KW) | 11 |
Rated speed (r/min) | 1460 |
GK 200 Engineering Drilling Rig Advantages
(1) It has automatic hydraulic feeding mechanism to improve drilling efficiency and reduce the physical labor intensity of workers.
(2) The ball card clamping mechanism is used instead of the chuck, and the clamping positioning mechanism is provided to implement the non-stop rewinding.
(3) It is equipped with a bottom pressure gauge to indicate the pressure, which is convenient for grasping the inside of the hole.
(4) The handle is concentrated and easy to operate.
(5) Compact structure, the rig and the power machine are all installed on the same base, occupying a small area.
(6) Light weight, high decomposability, easy to relocate, suitable for work in plain or mountainous areas.
(7) It is equipped with a safety shield, which highlights the humanized design features of the equipment.
(8) The fixing nut is installed at the joint between the lower end of the feed cylinder and the vertical shaft box, which improves the reliability of the drilling rig.
Drilling Attentions Before Reaching the Sand Layer
First , mix a pool of mud for standby in advance and replace it in time before reaching the sand layer. When the bit passes through the sand layer, the mud will paste the sand,how do you like this method?
Company Details
Business Type:
Manufacturer,Exporter,Seller
Year Established:
2010
Total Annual:
50000000-100000000
Employee Number:
100~120
Ecer Certification:
Verified Supplier
Jinzhou City Shitan Machinery Equipment CO. LTD. is a professional production and processing company for core drilling rigs, crawler drilling rigs, various track chassis, various types of mud pumps, various track transport vehicles, etc. It is one of the outstanding manufacturers o... Jinzhou City Shitan Machinery Equipment CO. LTD. is a professional production and processing company for core drilling rigs, crawler drilling rigs, various track chassis, various types of mud pumps, various track transport vehicles, etc. It is one of the outstanding manufacturers o...
Get in touch with us
Leave a Message, we will call you back quickly!