Payment Terms | T/T, Western Union |
Supply Ability | 1000set |
Delivery Time | 5-8 workday |
Packaging Details | Wooden Box |
Adaptive conditions | Yuchai 92KW |
Gas consumption | 16-55m³/min |
Working wind pressure | 1.25-3.5Mpa |
Walking speed | 2.5km/h |
Drill pipe length | 6m |
Drill pipe diameter | 89mm/102mm/114mm |
Drilling Depth | 150-400m |
Origin | Hebei, China |
Brand Name | SHITAN |
Model Number | ST-400 |
Certification | ISO,CE |
Place of Origin | China |
View Detail Information
Explore similar products
Small Crawler 380v Pneumatic Drilling Rig For 200m
260m Percussive Pneumatic Drilling Rig Crawler Machine
Project Deep Water Pneumatic Drilling Rig 400m
Diesel 400m Depth Pneumatic Crawler Drill Water Well Rig
Product Specification
Payment Terms | T/T, Western Union | Supply Ability | 1000set |
Delivery Time | 5-8 workday | Packaging Details | Wooden Box |
Adaptive conditions | Yuchai 92KW | Gas consumption | 16-55m³/min |
Working wind pressure | 1.25-3.5Mpa | Walking speed | 2.5km/h |
Drill pipe length | 6m | Drill pipe diameter | 89mm/102mm/114mm |
Drilling Depth | 150-400m | Origin | Hebei, China |
Brand Name | SHITAN | Model Number | ST-400 |
Certification | ISO,CE | Place of Origin | China |
High Light | Track Water Drilling Rig ,Gas Dual Purpose Drilling Rig ,High Leg Water Drilling Rig |
A Model of Technological Innovation and Stability
The ST400S crawler-type water well drilling rig integrates top-drive hydraulic rotation, down-the-hole hammer, and mud drilling technologies, offering diverse drilling methods adaptable to all formations—from loose layers to bedrock. With a user-friendly console, the rig can be operated by just 1-2 people, significantly reducing labor requirements.
1. Powerful & Reliable Performance
✅ 93kW Yuchai Diesel Engine – Provides robust, continuous power for deep drilling (up to 400m) in remote or off-grid locations.
✅ Hydraulic Top Drive System – Ensures smooth rotation and propulsion, enhancing drilling speed and precision.
2. Flexible Drilling Options
✅ 3-in-1 Drilling Methods – Switch seamlessly between:
DTH Hammer (for hard rock)
Mud Drilling (for unstable formations)
Rotary Drilling (for general-purpose use).
Drilling Hole Diameter | 105-305mm |
Drill pipe diameter | 89mm/102mm |
Engine | Six cylinder engine Yuchai 92KW |
Drilling method | Hydraulic rotation and propulsion or Mud drilling |
Weight | 9T |
Overall dimension | 5.6m×2m×2.5m |
Fast forward speed | 40m-min |
Use | Water Wells (agricultural, industrial, or domestic) |
Company Details
Business Type:
Manufacturer,Exporter,Seller
Year Established:
2010
Total Annual:
50000000-100000000
Employee Number:
100~120
Ecer Certification:
Verified Supplier
Jinzhou City Shitan Machinery Equipment CO. LTD. is a professional production and processing company for core drilling rigs, crawler drilling rigs, various track chassis, various types of mud pumps, various track transport vehicles, etc. It is one of the outstanding manufacturers o... Jinzhou City Shitan Machinery Equipment CO. LTD. is a professional production and processing company for core drilling rigs, crawler drilling rigs, various track chassis, various types of mud pumps, various track transport vehicles, etc. It is one of the outstanding manufacturers o...
Get in touch with us
Leave a Message, we will call you back quickly!