| Supply Ability | 500set/month |
| Standard | ANSI IEEE |
| Operation | Step-down |
| Delivery Time | 30days |
| Primary Voltage | 480V |
| Payment Terms | T/T |
| Vector group | Dyn1 |
| Secondary Voltage | 416Y/240V |
| Capacity | 2000kVA |
| Type | Three Phase Pad Mounted Transformer |
| Feed Type | Loop feed |
| Packaging Details | Plywood case |
| Model Number | ZGS11-H-2000/34.5 |
| Certification | UL/cUL |
| Brand Name | WINLEY |
| Place of Origin | CHINA |
View Detail Information
Explore similar products
1500 KVA Three Phase Pad Mounted Transformer with 7-Level Off-Circuit Tapping
2500Kva Three Phase Pad Mounted Isolation Oil-Immersed Transformer 480V To 480Y
3000 Kva 3 Phase Pad Mounted Transformer Step-Down 24940V & 12470V UL Certified
2000Kva Three Phase Pad Mounted Transformer Oil Immersed 12.47KV Distribution UL
Product Specification
| Supply Ability | 500set/month | Standard | ANSI IEEE |
| Operation | Step-down | Delivery Time | 30days |
| Primary Voltage | 480V | Payment Terms | T/T |
| Vector group | Dyn1 | Secondary Voltage | 416Y/240V |
| Capacity | 2000kVA | Type | Three Phase Pad Mounted Transformer |
| Feed Type | Loop feed | Packaging Details | Plywood case |
| Model Number | ZGS11-H-2000/34.5 | Certification | UL/cUL |
| Brand Name | WINLEY | Place of Origin | CHINA |
| High Light | 2000kVA three-phase pad-mounted transformer ,loop-feed transformer 34500V to 480Y/277V ,data center pad-mounted transformer | ||
Engineered for supreme reliability and high-capacity power delivery, this 2000 kVA three-phase liquid-filled pad-mounted transformer provides seamlessly efficient step-down conversion from 34500V to 480Y/277V. It serves as an indispensable backbone for demanding outdoor underground distribution networks powering industrial plants, high-density data centers, commercial campuses, and critical infrastructure.
Engineered for loop-feed versatility, it integrates robust, compartmentalized HV/LV construction, coordinated primary protection, ONAN self-cooling, a Dyn1 vector configuration, and a 150 kV primary BIL. The transformer is UL/cUL Listed under File No. E536138 and complies with ANSI C57.12.34 and DOE 2016 energy-efficiency requirements.
| Specification | Data | Specification | Data |
|---|---|---|---|
| Product Type | Three-phase liquid-filled pad-mounted transformer, compartmental type | Model | ZGS11-H-2000/34.5 |
| Rated Capacity | 2000 kVA | Operation | Step-down |
| Primary Voltage | 34500V | Secondary Voltage | 480Y/277V |
| Phase | Three phase | Rated Frequency | 60 Hz |
| Feed Type | Loop feed | Vector Group | Dyn1 |
| Primary BIL | 150 kV | Secondary BIL | 30 kV |
| Specification | Data | Specification | Data |
|---|---|---|---|
| Cooling Method | ONAN | InsulatinWinding | Aluminum |
| HV BIL / LV BIL | 150kV / 30kV | Temperature Rise | 65°C |
| Overall Dimensions | 98 × 89 × 75 in | Total Weight | 11680 lb |
| Test Item | Tested Value | Test Item | Tested Value |
|---|---|---|---|
| No-Load Loss | 1,766–1,868 W | No-Load Current | 0.15–0.16% |
| Load Loss at 85°C | 13,311–14,140 W | Short-Circuit Impedance | 5.80–5.85% |
Ideal for direct down-conversion from a 34.5 kV utility feed to power heavy motor drives, production machinery, automated assembly lines, and 277 V facility lighting.
Delivers an ultra-reliable 2 MVA 480Y/277V continuous supply for mission-critical IT infrastructure, cooling systems, and UPS support within medium-voltage loop circuits.
The perfect fit for underground medium-voltage networks across hospitals, university campuses, shopping centers, and airport terminal infrastructure.
Optimized for high-density municipal distribution requiring 35 kV-class switching, fully insulated 600 A deadbreak cable interfaces, fused coordination, and secure outdoor pad installation.
Steps down 34.5 kV site collector circuits to 480Y/277V to run auxiliary balance-of-plant (BOP) systems, HVAC units, fire suppression, and control rooms.
![]()
| Rated Power (KVA) |
High Voltage (KV) |
Low Voltage (V) |
No-load Loss (W) |
On-load Loss (W) |
Height (mm) |
Depth (mm) |
Width (mm) |
Weight (kg) |
Weight (Lbs) |
|---|---|---|---|---|---|---|---|---|---|
| 75KVA | 34.5KV 4.160KV 12.47KV 13.2KV 13.8KV 24940GrdY/14400 1247Grdy/7200 4160GrdY/2400 or others |
277V 347V 480V 600V 120/240V 208GrdY/120 415GrdY/240 480GrdY/277 600Y/347 |
180 | 1250 | 1430 | 910 | 1930 | 645 | 1422 |
| 150KVA | 280 | 2200 | 1530 | 980 | 1510 | 989 | 2180 | ||
| 300KVA | 480 | 3650 | 1680 | 1080 | 1660 | 1415 | 3119 | ||
| 500KVA | 680 | 5100 | 1790 | 1160 | 1810 | 1905 | 4200 | ||
| 750KVA | 980 | 7500 | 2030 | 1300 | 2030 | 2755 | 6074 | ||
| 1000KVA | 1150 | 10300 | 1854 | 1549 | 1651 | 3235 | 7132 | ||
| 1500KVA | 1640 | 14500 | 2150 | 1570 | 2210 | 5835 | 12864 | ||
| 2000KVA | 2160 | 20645 | 2220 | 1600 | 2380 | 6430 | 14175 | ||
| 2500KVA | 2680 | 23786 | 2330 | 1650 | 3070 | 8865 | 19544 | ||
| 3000KVA | 3300 | 30300 | 2460 | 1850 | 3260 | 11300 | 24912 | ||
| 3735KVA | 4125 | 37875 | 2680 | 2060 | 4080 | 14400 | 31746 |
A: Winley delivers standard three-phase pad-mounted transformers with a 4–6 weeks production time after technical approval. We provide a detailed production schedule and real-time manufacturing photos to help track progress.
A: We offer a flexible MOQ of just 1 unit. Complete inquiries are quoted within 1–2 days with 24/7 support. Leveraging our extensive North American project experience, we ensure highly cost-effective and reliable solutions.
A: Yes, We accept OEM and ODM. Winley three-phase pad-mounted transformers are available in standard ratings from 45–5000kVA (and maximum capability up to 10MVA), with HV systems up to 36 kV. We can customize electrical parameters, structure, fluid, protection, switches, gauges, tank and paint according to customer drawings, with the capability to integrate components from brands like Qualitrol, Eaton Cooper, and MR.
A: Yes. Our full range of products are UL/cUL-certified under UL File No. E536138, designed strictly in compliance with ANSI/IEEE, CSA, DOE, and NEMA requirements to meet grid connection and regulatory standards.
A: We deliver a complete compliance package: approval drawings, datasheets, routine test reports, UL/cUL certs, DOE 2016 docs, and operation manuals. We also back your project with lifetime documentation support.
A: Winley ensures quality through 4 annual unannounced UL audits and strict ISO 9001 process management with dedicated QC oversight. Prior to delivery, every unit undergoes comprehensive routine testing, including Winding Resistance, Turns Ratio, Polarity and Phase Relation, and No-Load Loss and Excitation Current tests. We also fully support Factory Acceptance Testing (FAT) and third-party inspections (SGS).
A: 24 months from B/L. During the warranty period, If there are any accessory problems, just provide photos of damaged accessory, then we will provide free service. According to the number of products, we will provide easily damaged accessories for free. We can also provide technical support if you need.
Company Details
Business Type:
Manufacturer,Seller
Year Established:
2007
Total Annual:
$45M-$60M
Employee Number:
150~210
Ecer Certification:
Verified Supplier
R&D and production capabilities Winley Electric boasts a team of dozens of experienced senior engineers who are well-versed in transformer standards of different countries including ANSI, IEEE, CSA, DOE2016, NEMA and IEC60076, and who can tailor cost-effective transformer solutions ... R&D and production capabilities Winley Electric boasts a team of dozens of experienced senior engineers who are well-versed in transformer standards of different countries including ANSI, IEEE, CSA, DOE2016, NEMA and IEC60076, and who can tailor cost-effective transformer solutions ...
Get in touch with us
Leave a Message, we will call you back quickly!