| Payment Terms | T/T |
| Supply Ability | 1000set/month |
| Delivery Time | 30days |
| Packaging Details | Plywood case |
| Application | Battery Energy Storage System (BESS) power stations |
| Capacity | 5MVA(5000KVA) |
| Primary Voltage | 12000V |
| secondary Voltage | 480Y/277 x 480Y/277 |
| Operation | Step-Up Operation (Reverse Feed) or Step Down Operation |
| Cooling Class | KNAN; Self-Cooled |
| Efficiency Standard(s) | Meets DOE 2016 Standards, Meets ANSI/IEEE Standards |
| UL/cUL Certification | UL-US-2431836-0, UL-CA-2423202-0 |
| Brand Name | WINLEY |
| Model Number | ZGS-5000/12 |
| Certification | UL/cUL,CE,ISO |
| Place of Origin | CHINA |
View Detail Information
Explore similar products
500Kva 3 Phase Pad Mounted Transformer Used Residential 34.5KV To 208V UL
1500 KVA Three Phase Pad Mounted Transformer with 7-Level Off-Circuit Tapping
2500Kva Three Phase Pad Mounted Isolation Oil-Immersed Transformer 480V To 480Y
3000 Kva 3 Phase Pad Mounted Transformer Step-Down 24940V & 12470V UL Certified
Product Specification
| Payment Terms | T/T | Supply Ability | 1000set/month |
| Delivery Time | 30days | Packaging Details | Plywood case |
| Application | Battery Energy Storage System (BESS) power stations | Capacity | 5MVA(5000KVA) |
| Primary Voltage | 12000V | secondary Voltage | 480Y/277 x 480Y/277 |
| Operation | Step-Up Operation (Reverse Feed) or Step Down Operation | Cooling Class | KNAN; Self-Cooled |
| Efficiency Standard(s) | Meets DOE 2016 Standards, Meets ANSI/IEEE Standards | UL/cUL Certification | UL-US-2431836-0, UL-CA-2423202-0 |
| Brand Name | WINLEY | Model Number | ZGS-5000/12 |
| Certification | UL/cUL,CE,ISO | Place of Origin | CHINA |
| High Light | 480Y/277 Pad Mounted Transformer ,12000V Pad Mounted Transformer ,5MVA Pad Mounted Transformer | ||
5MVA BESS Application Transformer Three Phase Pad Mounted Transformer Step Up 5000Kva 12000V To 480Y/277
The 5 MVA transformer is specifically engineered for Battery Energy Storage System (BESS) power stations.A large-scale BESS can't function without a connection to the existing electrical grid. This connection is possible because of power conversion and transformation that occur electronically. There is a need for transformers for all network voltages since the BESS power output must be compatible with the network voltage.
Product Photos
![]()
![]()
![]()
![]()
![]()
Utility-scale BESS are essential to support the transition toward lower carbon electricity produced from renewable energy sources. BESS can store electricity when there is a surplus and release it when the wind is not blowing or the sun is not shining but most importantly, it can play a major role in balancing the grid. All the energy that is being imported from or exported to the grid runs through transformers.
Main data
| Phase | Three Phase |
| Capacity | 5 MVA (5000 KVA) |
| Vector Group | YNd11 |
| Primary Voltage | 480Y/277 x 480Y/277 |
| Primary Voltage Class | 1.2 kV Class |
| Primary Phasor | Wye-N x Wye-N |
| Primary BIL | 30 KV |
| Secondary Voltage | 12000V Delta |
| Secondary Voltage Class | 15 kV Class |
| Secondary Phasor | Delta |
| Secondary BIL | 95 KV |
| Frequency | 60 Hz |
| Temperature Rise | 65°C |
| Insulation Rating | Class E Insulation - 120°C, 248°F |
| Cooling Class | KNAN; Self-Cooled |
Technical drawings
![]()
Specification
| Rated Power (KVA) |
High Voltage (KV) |
Low Voltage (V) |
No-load Loss (W) |
On-load Loss (W) |
Height (mm) |
Depth (mm) |
Width (mm) |
Weight (kg) |
Weight (Lbs) |
| 75KVA | 34.5KV 4.160KV 12.47KV 13.2KV 13.8KV 24940GrdY/14400 1247Grdy/7200 4160GrdY/2400 or others |
277V 347V 480V 600V 120/240V 208GrdY/120 415GrdY/240 480GrdY/277 600Y/347 |
180 | 1250 | 1430 | 910 | 1930 | 645 | 1422 |
| 150KVA | 280 | 2200 | 1530 | 980 | 1510 | 989 | 2180 | ||
| 300KVA | 480 | 3650 | 1680 | 1080 | 1660 | 1415 | 3119 | ||
| 500KVA | 680 | 5100 | 1790 | 1160 | 1810 | 1905 | 4200 | ||
| 750KVA | 980 | 7500 | 2030 | 1300 | 2030 | 2755 | 6074 | ||
| 1000KVA | 1150 | 10300 | 1854 | 1549 | 1651 | 3235 | 7132 | ||
| 1500KVA | 1640 | 14500 | 2150 | 1570 | 2210 | 5835 | 12864 | ||
| 2000KVA | 2160 | 20645 | 2220 | 1600 | 2380 | 6430 | 14175 | ||
| 2500KVA | 2680 | 23786 | 2330 | 1650 | 3070 | 8865 | 19544 | ||
| 3000KVA | 3300 | 30300 | 2460 | 1850 | 3260 | 11300 | 24912 | ||
| 3735KVA | 4125 | 37875 | 2680 | 2060 | 4080 | 14400 | 31746 |
Production process
![]()
![]()
![]()
FAQ
1. Q: Can I have a sample order?
A: Yes, we welcome sample order to test and check quality.
2. Q: What is the lead time?
A: Mass production time 15-25 days.
3. Q: How long is the warranty?
A: 24 monthes from B/L. If there are any accessory problems,just provide the photos of damaged accessory,then we will provide free service. According to the number of products,we will provide easily damaged accessories for free. we also can provide technical support if you need.
4. Q: Is OEM/ODM available?
A: Yes,it is! We are manufacturer with our own R&D team, we can customize products according to customer's drawing or requirements.
Customized services:
a. Customized color and special function.
b. Customized box.
c. Print customer's logo.
d. Your other ideas about product, we can help you design and put them into production. The above customized services must be confirmed before production.
5. Q: How to control the products quality?
A: Our company owns the core technology ,all kinds of products hold CE certificate. We have professional engineers. Workers are strictly required to make products according to the drawings. Each process has technical instructors.The QC supervisors will regularly inspect the production. We will do products performance tests during production, and comprehensive quality tests when the products is completed.
Company Details
Business Type:
Manufacturer,Seller
Year Established:
2007
Total Annual:
$45M-$60M
Employee Number:
150~210
Ecer Certification:
Verified Supplier
R&D and production capabilities Winley Electric boasts a team of dozens of experienced senior engineers who are well-versed in transformer standards of different countries including ANSI, IEEE, CSA, DOE2016, NEMA and IEC60076, and who can tailor cost-effective transformer solutions according to... R&D and production capabilities Winley Electric boasts a team of dozens of experienced senior engineers who are well-versed in transformer standards of different countries including ANSI, IEEE, CSA, DOE2016, NEMA and IEC60076, and who can tailor cost-effective transformer solutions according to...
Get in touch with us
Leave a Message, we will call you back quickly!