| Material | Steel |
| Product name | Tube And Clamp Scaffold |
| Packaging Details | Bundled / Tied in bundles/Optimization of container loading |
| Colour | Customer's Request |
| Usage | Buidling Constrcution |
| Supply Ability | 1000 piece in 10 days |
| Packing | 37 or 61 pieces/bundle. |
| Surface treatment | Hot dip galvanized or PVC coated |
| Payment Terms | T/T |
| Size | 3.56 kg/m -4.37 kg/m |
| Delivery Time | 10-30 workday |
| Keyword | quick clamp pipe fittings |
| Design Style | Industrial |
| Advantage | Stable |
| Certification | ROHS |
| Brand Name | WKS |
| Place of Origin | Hebei,China |
View Detail Information
Explore similar products
Aluminum Tube And Coupler Scaffolding Stable Quick Erect Scaffold Flexible
Stable Tube And Clamp Scaffold Heavy Duty Ship Building Scaffolding Customized
Multi Purpose Tube Clamp Scaffolding Industrial Tubular Pipe Scaffolding For
Modular Tube And Clamp Scaffold Flexible Tubular Steel Scaffolding For High Rise
Product Specification
| Material | Steel | Product name | Tube And Clamp Scaffold |
| Packaging Details | Bundled / Tied in bundles/Optimization of container loading | Colour | Customer's Request |
| Usage | Buidling Constrcution | Supply Ability | 1000 piece in 10 days |
| Packing | 37 or 61 pieces/bundle. | Surface treatment | Hot dip galvanized or PVC coated |
| Payment Terms | T/T | Size | 3.56 kg/m -4.37 kg/m |
| Delivery Time | 10-30 workday | Keyword | quick clamp pipe fittings |
| Design Style | Industrial | Advantage | Stable |
| Certification | ROHS | Brand Name | WKS |
| Place of Origin | Hebei,China |
The Cuplock Scaffolding System is a modular steel scaffold using a cup-and-blade connection - hammer down the upper cup to lock ledgers in seconds. Made from Q355B steel with hot-dip galvanized finish (≥55μm), it offers up to 120 kN load per standard and EN 12810 compliance.
Compared to frame or tube-clamp systems, Cuplock provides faster erection, higher strength, and 20+ years corrosion resistance - ideal for general construction and formwork falsework.
| Parameter | Value |
|---|---|
| Material | Q355B Steel |
| Pipe Size | 48.3mm × 3.2mm |
| Cup Spacing | 1.0m |
| Finish | Hot-dip galvanized (≥55μm) |
| Max Leg Load | Up to 120 kN |
| Standards | EN 12810, EN 12811 |
| Spacing | Height ≤5m |
|---|---|
| 1.2×1.2m | 120 kN |
| 1.5×1.5m | 80 kN |
| 1.8×1.8m | 50 kN |
| Aspect | Cuplock | Ring Lock |
|---|---|---|
| Connection | Cup + blade | Rosette + wedge |
| Angle | 90° only | 45° increments |
| Max Load | 120 kN | 150 kN |
| Cost | Moderate | Higher |
Company Details
Business Type:
Manufacturer,Trading Company
Year Established:
2024-07-30
Employee Number:
150~200
Ecer Certification:
Verified Supplier
Founded in 1993, WORKSUN GROUP is a seasoned leading enterprise in China's formwork and scaffolding industry. With 32 years of steady development, it has evolved into a large comprehensive private enterprise integrating R&D, production, sales, and services of formwork and scaffolding products. H... Founded in 1993, WORKSUN GROUP is a seasoned leading enterprise in China's formwork and scaffolding industry. With 32 years of steady development, it has evolved into a large comprehensive private enterprise integrating R&D, production, sales, and services of formwork and scaffolding products. H...
Get in touch with us
Leave a Message, we will call you back quickly!