 
                            
                            
                         
                        
 
                                    
| Payment Terms | L/C, D/A, D/P, T/T | 
| Supply Ability | 5000 Set/Sets per Year T thermal modification process of wood plant | 
| Delivery Time | 25-35 days after get deposit /stock | 
| Packaging Details | thermal modification process of wood plant is for 20GP or 40FT 40HQ OR buck cargo | 
| Brand Name | LUY | 
| Model Number | DN1800*18000 | 
View Detail Information
Explore similar products
 
                            CCA ACQ Impregnation Wood Treatment Plant Autoclave Oven Professional
 
                            High Configuration Wood Treatment Plant , Wood Pressure Treatment Equipment
 
                            CCA ACQ Wood Treatment Plant Timber Treatment Process Vacuum Dry Kiln
 
                            Vacuum Pressure Wood Treatment Plant , Heat Treatment Plant For Wood
Product Specification
| Payment Terms | L/C, D/A, D/P, T/T | Supply Ability | 5000 Set/Sets per Year T thermal modification process of wood plant | 
| Delivery Time | 25-35 days after get deposit /stock | Packaging Details | thermal modification process of wood plant is for 20GP or 40FT 40HQ OR buck cargo | 
| Brand Name | LUY | Model Number | DN1800*18000 | 
| High Light | Automatic light alarm Wood Treatment Plant ,air pneumatic valve Wood Treatment Plant ,Perfect tightness Wood Treatment Plant | ||
Why to choose thermal modification process of wood plant ?
high temperature depth carbonization
 tank diagram
 Stage 1: raise and dry stage by high temperature , with high temperature
 steam to raise 100℃, at this time ,the moisture of the wood is closed to
 zero ,the drying time of high temperature is up to original moisture of
 wood ,and variety of trees ,and thickness of wood , if treated wood have
 high moisture ,it should be put into Kiln drying.
 Stage 2:heat treatment stage ,the heat treatment is under low
 oxygen airtight furnace ,according to treatment requirement , after high
 temperature dry ,when the temperature of furnace get 200 ℃ ,we can
 begin to treat, the time of heat treatment is up to original moisture of
 wood ,and variety of trees ,and thickness of wood
 Stage 3: cool and moisture mediation treatment stage ,after heat treated
 wood become cool within controlled condition ,at this time use spray
 system to cool down the temperature ,then to process moisture mediation
 treatment .Pay more attention at this time ,after heat treatment wood is in
 high temperature stage , and have big temperature difference with
 outside .it will make wood crack ,this treated time is related to variety of
 trees and treated time
 Technology:
dry in the drying kiln with normal temperature
 high temperature steam dry in the carbonization tank
 high temperature heat treatment in the carbonization tank
 spray cooling
 Noted :There is no any chemical within whole treatment process ,it won’t
 produce any harmful material after treated ,after treated wood ,the
 moisture will reduce down ,filber texture was
 destroyed ,therefore ,Thermo-modified wood (carbonization wood )
 with corrosion ,Non-defrmation ,Non-nature crack
 
  
Technology data:
| Model | Capacity(M3_ | Treat capacity | Working pressure | Vacuum degree | 
| DN1200*4000 | 4.6 | 3.0 | 
 
 
 
 
 
 
 
 1.0-1.58Mpa , special design | 
 
 
 
 
 
 
 
 -0.098Mpa | 
| DN1200*6000 | 6.9 | 4.0 | ||
| DN1200*8000 | 9.1 | 5.2 | ||
| DN1500*4000 | 1.7 | 4.0 | ||
| DN1500*6000 | 11 | 6.0 | ||
| DN1500*8000 | 14 | 8.5 | ||
| DN1700*4000 | 9.2 | 5.2 | ||
| DN1700*8000 | 18.3 | 11 | ||
| DN1800*4000 | 10.3 | 5.8 | ||
| DN1800*6000 | 15.5 | 9.0 | ||
| DN1800*8000 | 20.5 | 12 | ||
| DN2000*6000 | 19 | 11 | ||
| DN2000*8000 | 26 | 14 | ||
| DN2000*10000 | 33 | 22 | ||
| DN2000*12000 | 37.68 | 25.12 | ||
| DN2000*14000 | 43.96 | 29.3 | ||
| Dn2000*18000 | 55 | 32 | 
Feature :
1. Double safety protection device :we design double safety device ,manual safety ,and automatic safety interlock ,Only there is pressure inside the tank ,the worker cann’t open the door .
2. Automatic set time function and light alarm ,save worker’s time ,you can set any time in the control box ,once it finish ,it will stop work and alarm
3. Quickly discharge chemical :10 minutes to discharge chemical ,improve treated time
4. Perfect tightness :we use air filled style to seam the door and the system match automatic inlet and outlet air pneumatic valve, it can balance tank pressure well .
5. High efficiency ,save energy ,once the equipment finish vacuum and pressure stage ,the pump will stop ,but whole tank still keep vacuum state
6. Advanced open door method ,only one young girl can open the door easierly 
Company Details
Business Type:
Manufacturer 
Year Established:
2008 
Total Annual:
8000000-10000000
Employee Number:
200~210 
Ecer Certification:
Verified Supplier 
Since 2008, Luy Machinery Equipment CO., LTD have more than 10 years experience in pressure vessel, the company covers an area of 5300m2 and has more than 200 employees. It is a modern new-type equipment manufacturing enterprise integrating design, manufacture and sales. Our main ... Since 2008, Luy Machinery Equipment CO., LTD have more than 10 years experience in pressure vessel, the company covers an area of 5300m2 and has more than 200 employees. It is a modern new-type equipment manufacturing enterprise integrating design, manufacture and sales. Our main ...
Get in touch with us
Leave a Message, we will call you back quickly!