Payment Terms | T/T, L/C |
Supply Ability | 200,000 Tons / Year |
Delivery Time | 20-40 Days |
Packaging Details | Standard Packing |
Structure Type | Workshop |
Weight | Light Weight |
Install | Online Guidance, Support Installation |
Customizable | Yes |
Secondary Frame | Hot Dipped Galvanized Purlin |
Wall Type | Steel Cladding |
Strength | Strong |
Main Steel | Q355, Q355, Q235, |
Frame Finishing | Heat Treated |
Roof Gutter | color steel sheet |
Brand Name | China CT |
Model Number | Steel Structure Warehouse |
Certification | ISO CE |
Place of Origin | China |
View Detail Information
Explore similar products
H Section Column Steel Structure Building Construction Hot Dip Galvanized
Q235b Q355b Steel Structure Workshop Factory Prefabricated Customized
Coast Aluminum Steel Structure Workshop Building Customized For Factory
Q345/Q355 Light Prefabricated Steel Structure Building Workshop
Product Specification
Payment Terms | T/T, L/C | Supply Ability | 200,000 Tons / Year |
Delivery Time | 20-40 Days | Packaging Details | Standard Packing |
Structure Type | Workshop | Weight | Light Weight |
Install | Online Guidance, Support Installation | Customizable | Yes |
Secondary Frame | Hot Dipped Galvanized Purlin | Wall Type | Steel Cladding |
Strength | Strong | Main Steel | Q355, Q355, Q235, |
Frame Finishing | Heat Treated | Roof Gutter | color steel sheet |
Brand Name | China CT | Model Number | Steel Structure Warehouse |
Certification | ISO CE | Place of Origin | China |
High Light | Modular Steel Structure Workshop Building ,Galvanized Steel Structure Workshop Building ,Hot Dip Galvanized Steel Workshop |
Hot Dig Galvanized Steel Structure Workshop Building Metal Frame Construction
Outstanding Corrosion Resistance: The hot-dip galvanizing process provides a durable zinc coating that protects the steel frame from rust and corrosion, ensuring long-term durability in harsh environments.
Robust Structural Integrity: The steel structure is designed with high strength and load-bearing capacity, making it suitable for heavy industrial applications and capable of supporting large machinery and equipment.
Quick Assembly and Construction: The metal frame components are prefabricated and designed for fast on-site assembly, reducing construction time and labor costs while ensuring precision and quality.
Maintenance-Free Longevity: The galvanized coating minimizes the need for maintenance, as it provides long-lasting protection against weathering and wear, resulting in lower overall lifecycle costs.
Flexible Design and Customization: The modular steel frame allows for flexible layout options and easy customization to meet specific workshop requirements, including size, height, and internal configurations.
FAQ
1. You are manufacturer or trading company?
We are a manufacturer. And welcome to visit us at any time. The quality control flow and sales team will show you
our professionalism. Also you will can get best and most competitive price after visiting us.
2. Is your price competitive compared with other companies?
Our business objectives are to give the best price with best quality. We will do everything we can to reduce your cost and guarantee you get the best product that you paid for.
3. Can you send engineers or whole team to install my project?
We will give detailed installation drawings for free. We can send engineers as installation director or a team upon request.
4. Do you accept container loading inspection?
You are welcomed to send an inspector, not only for the container loading, but any time during the production time.
5. Do you offer designing service for us?
Yes, we could design full solution drawings as your requirements. By using AutoCAD, PKPM, MTS, 3D3S, Tarch, Tekla Structures (Xsteel) and etc. we can design complex industrial building like office mansion, supermarket, auto dealer shop, shipping mall, 5 star hotel.
6. What is the delivery time?
Delivery time depends on order quantities. In general the delivery time to nearest seaport in China will be 40 days after
receiving deposit.
Company Details
Business Type:
Manufacturer,Exporter
Year Established:
2004
Employee Number:
500~800
Ecer Certification:
Verified Supplier
China CT Steelstructure Co., Ltd. is a comprehensive industrial group integrating the research and development, design, manufacturing, production and installation of steel structures. Since its establishment in 2004, it has covered an area of approximately 300,000 square meters and has a... China CT Steelstructure Co., Ltd. is a comprehensive industrial group integrating the research and development, design, manufacturing, production and installation of steel structures. Since its establishment in 2004, it has covered an area of approximately 300,000 square meters and has a...
Get in touch with us
Leave a Message, we will call you back quickly!