| Delivery Time | 15-30 working days |
| Rated flow of system | 15L/minX2 |
| Center height of assy | 745mm |
| Payment Terms | L/C, T/T |
| System rated pressure | 6.5MPa |
| Maximum brake moment of emergent brake | 157kN.m |
| Type | Drilling Drawworks |
| Application | Deep And Ultra Deep Well |
| Model Number | PS30 |
| Brand Name | XI'AN RIG |
| Place of Origin | China |
| Certification | API |
View Detail Information
Explore similar products
API 7K Drilling Drawworks JC50 Oil Rig Drawworks Water Cooled
JC18 Hydraulic Drawworks API Standard Draw Works For Oil Field
API Q1 Spiral Bevel Gearbox Spray Painted Angle Gearbox For Power Transmission
Polished Surface Brake Block High Friction Auxiliary Brake For Drilling Rig
Product Specification
| Delivery Time | 15-30 working days | Rated flow of system | 15L/minX2 |
| Center height of assy | 745mm | Payment Terms | L/C, T/T |
| System rated pressure | 6.5MPa | Maximum brake moment of emergent brake | 157kN.m |
| Type | Drilling Drawworks | Application | Deep And Ultra Deep Well |
| Model Number | PS30 | Brand Name | XI'AN RIG |
| Place of Origin | China | Certification | API |
| High Light | durable drilling drawworks ,durable drilling rig drawworks | ||
Five Core Functions of the Drilling Drawworks (Full Coverage of the Entire Drilling Process)
The drilling drawworks runs through the entire drilling life cycle — spudding in, drilling ahead, making connections, tripping, running casing, well completion, derrick raising/lowering, and accident handling. Five core functions support the normal operation of the entire drilling process.
1. Heavy-Load Tripping of Drill String and Running of Casing (Core Main Function)
During drilling operations, the drawworks undertakes all lifting, lowering, transfer, and suspension of drill pipe, drill collars, bits, downhole tool assemblies, and casing strings. In deep-well drilling, the total weight of the string can reach several hundred tons, all borne by the drawworks wire rope and drum. Relying on the high-torque output of the drawworks for smooth lifting and uniform lowering, the frequent tripping procedures are completed. This is the core function with the greatest workload and highest usage frequency in drilling.
2. Precise Weight-on-Bit Control and Automatic Drilling (Auto-Feed) During Drilling
Under normal drilling conditions, the drawworks does not lift or lower at full speed; instead, it feeds in at micro-speed, constant torque, and constant pressure. By dynamically releasing the string weight through hook-load control, it delivers a stable weight on bit to the bit with precision, allowing the bit to uniformly penetrate the formation and break rock steadily. Modern variable-frequency drawworks are equipped with automatic drilling (auto-feed) systems, enabling fully automatic constant-weight drilling and constant-speed feed, greatly reducing manual operation errors and improving drilling uniformity, wellbore quality, and rate of penetration (ROP).
3. Integral Derrick Raising and Folding/Storage
Throughout rig relocation, installation, and positioning, the raising of the derrick, lowering of the derrick, and section adjustments are all completed by pulling with the main drawworks. The drawworks provides large pulling force, working with the hoisting sheave system to safely raise and fold derricks weighing hundreds of tons — it is the core power equipment for rig installation and commissioning.
4. Wellhead Auxiliary Cathead Operations
Both ends of the drawworks are equipped with front and rear cathead shafts, capable of auxiliary pulling for making up and breaking out connections, pipe handling, pulling drill pipe, pipe alignment/centralization, lifting small tools, wellhead positioning, and auxiliary tensioning — high-frequency wellhead auxiliary operations and an important auxiliary power source for mechanized wellhead work.
5. Downhole Emergency Safety Handling
In the event of stuck pipe, drilling stalls, drill string obstruction, or complex downhole conditions, the drawworks can instantly deliver a huge overpull load, completing upward jarring to release stuck pipe, shock-release load relief, and emergency suspension and locking, preventing buried bits, stuck pipe, and drill string drop-off. It is the key safety equipment for downhole accident prevention and emergency escape.
![]()
Technical parameter:
System rated pressure 6.5MPa
Rated flow of system 15L/minX2
Maximum brake moment of normally open tong 77kN.m
Maximum brake moment of normally closed tong 80kN.m
Maximum brake moment of emergent brake 157kN.m
Brake disc size( thickness×diameter) 40×1500mm
Center height of assy 745mm
Company Details
Business Type:
Manufacturer,Distributor/Wholesaler,Agent,Exporter,Trading Company,Seller
Total Annual:
200-500
Employee Number:
100~110
Ecer Certification:
Verified Supplier
Xi'an RIG– Global Provider of Integrated Petroleum Drilling Equipment Solutions Xi'an RIG Oilfield Equipment Co., Ltd is a China-based supplier headquartered in Xi’an, Shaanxi Province, specializing in end-to-end drilling equipment solutions for international oil & g... Xi'an RIG– Global Provider of Integrated Petroleum Drilling Equipment Solutions Xi'an RIG Oilfield Equipment Co., Ltd is a China-based supplier headquartered in Xi’an, Shaanxi Province, specializing in end-to-end drilling equipment solutions for international oil & g...
Get in touch with us
Leave a Message, we will call you back quickly!