| Supply Ability | 10 sets per month |
| Delivery Time | 25-45 working days |
| After-sales Service Provided | Free spare parts, Field installation, commissioning and training |
| After Warranty Service | Video technical support, Online support and Spare parts |
| rated capacity | 100-250KVA |
| usage | Weld Nut Screw Bolt Stud |
| rated duty cycle | 50% |
| warranty | 1 Year |
| Product Name | Capacitor Discharge Energy Storage Resistance Projection Welder For Stainless Steel Stud Bolt Nut Spot Welding |
| voltage | 380 V, 220 V, 440V |
| Payment Terms | L/C,D/A,D/P,Western Union,T/T |
| Brand Name | Xingweihan |
| Certification | CE, RoHS, ISO |
| Place of Origin | Sichuan, China |
View Detail Information
Explore similar products
20000J Dual Heads Capacitor Discharge Resistance Nut Spot Welder High Energy
Dual-Head CD Multi-Point Projection Welding Machine for Precision Fastener
Stable Discharge CD Projection Welding Machine for Uniform Nut and Screw Welding
CD Projection Welding Machine for Aluminum Stud Screw Bolt and Nut Welding
Product Specification
| Supply Ability | 10 sets per month | Delivery Time | 25-45 working days |
| After-sales Service Provided | Free spare parts, Field installation, commissioning and training | After Warranty Service | Video technical support, Online support and Spare parts |
| rated capacity | 100-250KVA | usage | Weld Nut Screw Bolt Stud |
| rated duty cycle | 50% | warranty | 1 Year |
| Product Name | Capacitor Discharge Energy Storage Resistance Projection Welder For Stainless Steel Stud Bolt Nut Spot Welding | voltage | 380 V, 220 V, 440V |
| Payment Terms | L/C,D/A,D/P,Western Union,T/T | Brand Name | Xingweihan |
| Certification | CE, RoHS, ISO | Place of Origin | Sichuan, China |
| High Light | 440v capacitor discharge spot welder ,440v capacitor discharge spot welding machine ,weld nut capacitor discharge spot welder | ||
When stainless steel fastener welding runs three shifts a day, the economics of the machine matter as much as the weld quality. This CD projection welder is engineered for continuous industrial operation: dual nut conveyors for automated feeding, 2000KG frame for round-the-clock stability, and capacitor discharge technology that reduces electrode wear and grid load compared to AC alternatives — delivering lower total cost of ownership over years of production.
✓ Dual Nut Conveyors — Automated Feeding for Continuous Production
✓ 24/7 Industrial Rating — 2000KG Frame, Impact-Resistant Structure
✓ Low Total Cost of Ownership — Reduced Electrode Wear, Grid-Friendly
✓ Process Safety — Automatic Cycle Eliminates Human Error
In high-volume stainless steel fastener production, the purchase price of a welding machine is a fraction of its lifetime cost. Electrode replacement frequency, electricity consumption, scrap rate from inconsistent welds, and production downtime from equipment failure add up over years of operation. This CD projection welder is designed to minimize every one of these cost drivers while maintaining 24/7 production capability.
The integrated dual nut conveyor system automatically feeds fasteners to the welding position, reducing manual handling and maintaining consistent cycle times. Operators load bulk nuts into the conveyors rather than positioning each fastener individually. For production lines welding thousands of stainless steel nuts per shift, this automated feeding eliminates a significant bottleneck and reduces operator fatigue.
The ultra-short CD pulse reduces electrode contact time with the workpiece, extending electrode life compared to sustained-heat AC welding. The capacitor bank charges gradually from the grid and discharges in milliseconds, eliminating the high peak power demand that AC welders place on facility electrical systems. Lower electrode consumption and grid-friendly power draw translate to measurable operating cost savings over months and years of production.
Grid voltage varies throughout the day, especially in industrial zones with heavy machinery cycling on and off. AC welders are directly affected — a voltage dip means a weak weld, potentially scrapping parts. The CD system decouples welding energy from grid conditions: capacitors charge to a preset level and discharge exactly that stored energy. This energy constancy eliminates scrap caused by power fluctuation, directly improving yield rate and protecting production margins.
Every welding parameter — electrode force, discharge energy, hold time — is pre-programmed and executed automatically by the machine controller. Operators cannot accidentally alter weld quality through inconsistent timing or technique. This process lock-in not only ensures reliable weld replication across all three shifts but also enhances workplace safety by removing operator interaction with the welding cycle.
| Cost Factor | AC Resistance Welder | CD Projection Welder |
|---|---|---|
| Electrode Life | Shorter, sustained heat degrades tips | Extended, short pulse reduces wear |
| Peak Grid Load | High instantaneous demand | Capacitor buffers, lower peak load |
| Scrap Rate (Grid Fluctuation) | Variable, weak welds during voltage dips | Energy constancy, near-zero scrap from power |
| 24/7 Production Suitability | Thermal drift over extended runs | 2000KG frame, stable through continuous shifts |
| Operator Dependency | Manual timing affects quality | Automatic cycle, operator-independent |
| Automation Readiness | Limited integration options | Dual conveyors, PLC-compatible interface |
Manufacturers running dedicated production lines for stainless steel components with welded fasteners need equipment that matches line speed and runs reliably through multi-shift schedules. The dual nut conveyor system maintains consistent feeding cadence, the 2000KG frame handles continuous duty, and the CD energy constancy ensures weld quality does not drift as the machine heats up through hours of operation. Suitable for automotive stainless exhaust component lines, appliance stainless panel production and building hardware manufacturing.
The machine''s automatic weld cycle, dual nut conveyors and PLC-compatible control interface make it suitable for integration into automated or semi-automated production cells. The process-locked welding parameters and energy constancy ensure that every weld in an automated sequence meets specification regardless of production speed or upstream variability. Supports the transition from manual to automated stainless steel fastener welding as production volumes grow.
For manufacturers where stainless steel material cost means every scrapped part hurts the bottom line, the energy constancy of CD technology provides direct financial benefit. No more scrapping parts because the grid dipped during a weld. Combined with extended electrode life and lower peak power costs, the CD welder delivers measurable operating cost advantages that compound over years of production — making the business case beyond initial purchase price.
| Parameter | DN(B)-100 | DN(B)-160 | DN(B)-200 | DN(B)-250 |
|---|---|---|---|---|
| Rated Power (KVA) | 100 | 160 | 200 | 250 |
| Power Input | 3-Phase AC 380V (220V / 440V Available) | |||
| Max. Short Circuit Current (KA) | 30 | 35 | 40 | 45 |
| Duty Cycle (%) | 50 | |||
| Max. Electrode Force (N) | 6000 | 6000 | 10000 | 15000 |
| Electrode Length (mm) | 450 | 500 | ||
| Working Stroke (mm) | 80 | |||
| Cooling Water (L/min) | 20 | |||
| Max. Welding Capacity (mm) | 3.0+3.0 | 4.0+4.0 | 5.0+5.0 | 6.0+6.0 |
| Nut Feeding | Dual Nut Conveyor System | |||
| Machine Weight | 2000KG | |||
| Dimensions (mm) | 1550 x 1150 x 2700 | |||
Xinwei Welding Technology Co., Ltd. operates an 18,000 square meter manufacturing facility with a dedicated R&D team of over 20 engineers. ISO 9001, CE and RoHS certified. Serving customers in more than 30 countries worldwide.
Our CD projection welding machines are built for industrial continuous production environments. The 2000KG frame undergoes structural rigidity verification, and each machine completes multi-cycle weld consistency testing on customer-representative stainless steel fastener samples before shipment. The dual nut conveyor system is calibrated and tested for reliable automated feeding at production speed.
| Feature | Your Production Benefit |
|---|---|
| Dual Nut Conveyor System | Automated feeding reduces manual handling, maintains cycle cadence |
| Energy Constancy Technology | Eliminates scrap from grid fluctuation, consistent weld every pulse |
| Reduced Electrode Wear | Short CD pulse extends electrode life, lowers consumable cost |
| Grid-Friendly Operation | Capacitor buffers peak load, reduces electricity infrastructure demand |
| 2000KG 24/7 Frame | Impact-resistant structure for continuous multi-shift operation |
| Process-Locked Automation | Automatic cycle prevents operator error, ensures production safety |
Send us your stainless steel fasteners and sheet metal samples. Our engineers will run multi-cycle production simulation tests on your materials, provide weld nugget cross-section analysis and pull-out test data, and demonstrate the dual nut conveyor system performance — free of charge.
Send your production samples for a free CD welding test with automated feeding
✓ Multi-Cycle Continuous Production Simulation Testing Before Shipment
✓ Weld Nugget Cross-Section Inspection on Customer Stainless Fastener Samples
✓ Pull-Out Force and Torque-to-Failure Verification
✓ Dual Nut Conveyor System Function and Cadence Verification
✓ Frame Rigidity and Electrode Alignment Check Under Continuous Load
✓ ISO 9001:2015 Certified Quality Management System
Q: How does the dual nut conveyor system work in production?
The two independent nut conveyors feed fasteners to the welding position automatically. Operators load bulk nuts into the conveyor hoppers. The system orients and delivers one nut per cycle to the electrode, eliminating manual placement. This maintains consistent cycle cadence and reduces operator fatigue during high-volume production runs. Conveyor speed and timing are synchronized with the weld cycle.
Q: What is the real operating cost difference between CD and AC for continuous production?
Three factors drive the difference. First, electrode life: the CD short pulse minimizes electrode contact time, extending tip life compared to sustained-heat AC. Second, scrap reduction: energy constancy eliminates parts lost to grid fluctuation. Third, power costs: capacitor charging draws lower peak current from the grid. The cumulative effect over months of continuous production typically recovers the equipment price premium within the first 12-18 months of operation.
Q: Can this machine be integrated into an automated production line?
Yes. The automatic weld cycle, dual nut conveyor system and PLC-compatible control interface support integration into semi-automated and fully automated production cells. The process-locked parameters ensure weld quality consistency regardless of upstream automation speed, and the energy constancy means weld quality is independent of line power conditions that may fluctuate with other automated equipment cycling.
Q: Is the machine suitable for 24/7 three-shift operation?
Yes. The 2000KG frame with internal reinforcement ribs is designed for the mechanical demands of continuous production. The capacitor discharge system does not generate the sustained thermal load that causes drift in AC transformers during extended operation. The automatic weld cycle eliminates quality variation between shifts and operators, making the machine suitable for unattended or lightly supervised production periods.
Tell us your fastener type, material grade, daily production volume and automation requirements. Our engineers will recommend the optimal DN model with dual conveyor configuration and develop CD welding parameters for your continuous production application.
12-Month Warranty | Free Production Simulation Test | Factory Direct from Xinwei
Company Details
Business Type:
Manufacturer
Year Established:
2003
Total Annual:
$35000000-$50000000
Employee Number:
70~95
Ecer Certification:
Verified Supplier
.gtr-container-qwe456 { font-family: Verdana, Helvetica, "Times New Roman", Arial, sans-serif; font-size: 14px; line-height: 1.6; color: #333; padding: 20px; box-sizing: border-box; } .gtr-container-qwe456 p { text-align: left !important; } .gtr-container-qwe456__main-... .gtr-container-qwe456 { font-family: Verdana, Helvetica, "Times New Roman", Arial, sans-serif; font-size: 14px; line-height: 1.6; color: #333; padding: 20px; box-sizing: border-box; } .gtr-container-qwe456 p { text-align: left !important; } .gtr-container-qwe456__main-...
Get in touch with us
Leave a Message, we will call you back quickly!