China factories

Chat Now Send Email
China factory - Hunan Yintu New Materials Co., Ltd.

Hunan Yintu New Materials Co., Ltd.

  • China,Changsha ,Hunan
  • Verified Supplier
  1. Home
  2. Products
  3. About Us
  4. Contact Us

Leave a Message

we will call you back quickly!

Submit Requirement
China 125 kW Smart261L Cabinets for Staged Industrial Expansion
China 125 kW Smart261L Cabinets for Staged Industrial Expansion

  1. China 125 kW Smart261L Cabinets for Staged Industrial Expansion

125 kW Smart261L Cabinets for Staged Industrial Expansion

  1. MOQ:
  2. Price:
  3. Get Latest Price
Manufacturer platform range 125 kW to 1.25 MW, project-configured
Integrated cabinet Battery, PCS, BMS and cabinet EMS
Battery DC window 728–936 V
Cooling / enclosure Liquid cooling / IP55
Site communications Ethernet / RS485, Modbus TCP / RTU
Battery energy per cabinet 261.248 kWh LFP
Cabinet size 1000 × 1300 × 2300 mm
Cabinet AC rating 125 kW at 400 V
Model Number Ener Hexon Smart261L
Brand Name YOTAI

View Detail Information

Inquiry by Email Get Latest Price
Chat online Now Ask for best deal
  1. Product Details
  2. Company Details

Product Specification

Manufacturer platform range 125 kW to 1.25 MW, project-configured Integrated cabinet Battery, PCS, BMS and cabinet EMS
Battery DC window 728–936 V Cooling / enclosure Liquid cooling / IP55
Site communications Ethernet / RS485, Modbus TCP / RTU Battery energy per cabinet 261.248 kWh LFP
Cabinet size 1000 × 1300 × 2300 mm Cabinet AC rating 125 kW at 400 V
Model Number Ener Hexon Smart261L Brand Name YOTAI
High Light 125 kW smart cabinets ,staged industrial expansion cabinets ,commercial energy storage cabinets

125 kW Smart261L Cabinets for Staged Industrial Expansion

Plan a staged installation of integrated 125 kW cabinets around a common 400 V bus, with cabinet-level limits and a defined plant dispatch interface.

Ener Hexon Smart261L

Selected configuration

Cabinet AC rating 125 kW at 400 V
Battery energy per cabinet 261.248 kWh LFP
Manufacturer platform range 125 kW to 1.25 MW, project-configured
Battery DC window 728–936 V
Cooling / enclosure Liquid cooling / IP55
Site communications Ethernet / RS485, Modbus TCP / RTU
Integrated cabinet Battery, PCS, BMS and cabinet EMS
Cabinet size 1000 × 1300 × 2300 mm

Reserve capacity at the first stage

The Smart261L gives an EPC team a 125 kW building block with 261.248 kWh of nameplate battery energy. Establish the first-stage power and usable-energy targets from the site load profile, then reserve feeder positions, isolation points, floor space and cable routes for the contemplated expansion. The manufacturer describes a 125 kW to 1.25 MW platform. Final cabinet count and site export capacity depend on the electrical design.

Allocate dispatch to each cabinet

Use the available Ethernet or RS485 interfaces and agree the Modbus register map before detailed design. The site controller should allocate charge and discharge commands according to cabinet availability, battery limits and alarms. Test communication loss, cabinet isolation and reintegration during commissioning. Review the metering location and transformer loading against the aggregated operating plan.

Define the supplied equipment

Each liquid-cooled Smart261L cabinet integrates the battery, PCS, BMS and cabinet EMS. YINTU, an energy storage solution provider, coordinates the manufacturing partner and cabinet selection. Site supervisory controls, AC combiner, protection, transformer and external PV equipment are defined in the project scope.

Equipment illustration based on the model reference. The approved drawing and technical agreement define the ordered configuration.

Commercial & Industrial Energy Storage

Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Distributor/Wholesaler,Exporter,Trading Company

  • Year Established:

    2016

  • Total Annual:

    $ 10 million-$ 20,million

  • Employee Number:

    50~100

  • Ecer Certification:

    Verified Supplier

Your Partner for Energy Storage Product Sourcing YINTU Energy is the energy storage business of Hunan Yintu New Materials Co., Ltd. Established in 2016, our company has 10-50 employees and an export share of 100%. We connect overseas distributors, installers, EPC companies and project buyers with... Your Partner for Energy Storage Product Sourcing YINTU Energy is the energy storage business of Hunan Yintu New Materials Co., Ltd. Established in 2016, our company has 10-50 employees and an export share of 100%. We connect overseas distributors, installers, EPC companies and project buyers with...

+ Read More

Get in touch with us

  • Reach Us
  • Hunan Yintu New Materials Co., Ltd.
  • 201, Building B6, Xinggongchang Industrial Park, No.1 Lantian North Road, Economic Development Zone, Changsha, Hunan, China
  • https://www.yintuenergy.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement