| Cooling method | Air cooling |
| Approximate weight | 52 t |
| Corrosion protection | C3; C4 / C5 optional |
| Installation | Outdoor |
| Supply scope | DC-side battery container |
| Communication interfaces | Ethernet |
| Packaging Details | Container transport, lifting plan and shipping arrangements confirmed for the project. |
| Battery voltage range | 1142–1468.8 V |
| BMS architecture | 3-level |
| Auxiliary supply | 25 kW; 380 V & 480 V / 50 Hz (source notation; confirm selection) |
| System operating temperature | −30 to +50°C; derating above 45°C |
| Cell specification | LFP / 3.2 V / 280 Ah |
| Container format | 30 ft |
| Charge / discharge rate | ≤0.5 CP |
| Ingress protection | IP54 |
| Temperature difference | ≤5°C (system) |
| Dimensions W × D × H | 9125 × 2438 × 2896 mm |
| Rated battery energy | 5117.95 kWh |
| External protocol | Modbus TCP |
| Delivery Time | Confirmed after configuration approval |
| Nominal DC voltage | 1305.6 V |
| Altitude | ≤3000 m |
| Model Number | YT-Utility ESS-5117kWh |
| Brand Name | YINTU |
View Detail Information
Explore similar products
3.44 MWh Liquid-Cooled Utility ESS with 1.725 MW Rated Power
5.016 MWh Utility Scale Energy Storage Systems Liquid Cooled Utility ESS IP54
3290 kWh Utility Scale Battery Energy Storage Systems Modular 20 Foot Battery
3.85 MWh Liquid Cooled Utility Scale ESS With 2 MW Rated Power IP54 Protection
Product Specification
| Cooling method | Air cooling | Approximate weight | 52 t |
| Corrosion protection | C3; C4 / C5 optional | Installation | Outdoor |
| Supply scope | DC-side battery container | Communication interfaces | Ethernet |
| Packaging Details | Container transport, lifting plan and shipping arrangements confirmed for the project. | Battery voltage range | 1142–1468.8 V |
| BMS architecture | 3-level | Auxiliary supply | 25 kW; 380 V & 480 V / 50 Hz (source notation; confirm selection) |
| System operating temperature | −30 to +50°C; derating above 45°C | Cell specification | LFP / 3.2 V / 280 Ah |
| Container format | 30 ft | Charge / discharge rate | ≤0.5 CP |
| Ingress protection | IP54 | Temperature difference | ≤5°C (system) |
| Dimensions W × D × H | 9125 × 2438 × 2896 mm | Rated battery energy | 5117.95 kWh |
| External protocol | Modbus TCP | Delivery Time | Confirmed after configuration approval |
| Nominal DC voltage | 1305.6 V | Altitude | ≤3000 m |
| Model Number | YT-Utility ESS-5117kWh | Brand Name | YINTU |
| High Light | 5117 kWh Air Cooled Utility ESS ,30 ft Air Cooled Utility BESS ,Air Cooled LFP Battery Containers | ||
UTILITY-SCALE DC BATTERY STORAGE
A 5117.95 kWh LFP battery container with controlled air cooling, offering a large DC energy block for grid dispatch and renewable generation projects. The 30 ft enclosure concentrates more than 5 MWh of nominal battery energy in one container. Its approximately 52 t weight and service access requirements should be addressed early in transport, crane and foundation planning.
This listing covers the DC-side battery container, including LFP batteries, battery management, thermal management, DC distribution and the specified protection systems. It is not a complete AC-connected power station. PCS, plant EMS/PPC, transformers, switchgear and grid connection equipment are separate project items unless expressly included in the agreed supply scope.
YINTU is an energy storage solution provider. We work with manufacturing partners to select battery equipment and coordinate the interfaces required for each project.
Charge under an approved dispatch schedule and discharge through an external PCS during the selected peak period. The battery provides the energy reservoir; the PCS defines the AC conversion capability. Usable energy, reserve margins and conversion losses determine the actual delivery duration.
A coordinated PCS and plant EMS can charge or discharge the battery to moderate short-term variations in photovoltaic or wind output and follow an export schedule. The achievable ramp rate and response depend on converter capability, communications, available state of charge and the grid operator’s requirements.
The battery supplies or absorbs active energy when the selected PCS and controller respond to a regulation signal. Reserve availability must respect battery voltage, temperature, charge/discharge limits and state of charge. Frequency response is a complete-system function, not a standalone guarantee from the battery enclosure.
Discharging during defined high-load intervals can reduce the peak power requested from a connection or support a constrained node. Suitability depends on the local load profile, connection limit and required duration. Any infrastructure-deferral or revenue case needs a project study; the battery rating alone does not establish the result.
The 30 ft enclosure concentrates more than 5 MWh of nominal battery energy in one container. Its approximately 52 t weight and service access requirements should be addressed early in transport, crane and foundation planning.
Tree-inspired airflow channels and pack-level fan-speed control are described in the datasheet, with system temperature difference at or below 5°C. Coordinated cooling helps manage thermal conditions during the planned duty cycle. Ambient temperature and cooling auxiliary consumption must be included in the plant energy model.
The three-level BMS works with DC collection, grounding and protection systems. Pack-targeted suppression, combustible-gas detection, smoke prevention and explosion venting are described alongside 5VA insulation materials. Final fire-system selection and site fire design require configuration-specific review.
The source states a 20-year design life and up to two charges and two discharges per day. These are design references, not a warranty or a promise of constant lifetime capacity. Dispatch depth, ambient conditions, maintenance and end-of-life capacity targets need to be agreed for the project.
In the illustrated AC-coupled example, the battery DC output connects to a compatible bidirectional PCS, then through the project transformer and switchgear to the grid. A photovoltaic plant connects through its own inverter and interface equipment to the AC collector. Plant EMS/PPC coordinates dispatch and exchanges status with the BMS. This battery container does not connect directly to PV strings or the AC grid. Alternative architectures require an approved project design.
| Parameter | Specification |
|---|---|
| Model | YT-Utility ESS-5117kWh |
| Cell chemistry / specification | LFP / 3.2 V / 280 Ah |
| Rated battery energy | 5117.95 kWh |
| Nominal DC voltage | 1305.6 V |
| Battery voltage range | 1142–1468.8 V |
| Charge / discharge rate | ≤0.5 CP |
| System voltage class | 1500 V |
| AC output power | Not specified; determined by separately selected PCS and system design |
| Design life | 20 years (source design reference; not warranty) |
| Parameter | Specification |
|---|---|
| Cooling method / medium | Air cooling; pack-level fan-speed control |
| Temperature difference | ≤5°C (system) |
| BMS architecture | 3-level |
| Auxiliary power supply | 25 kW; 380 V & 480 V / 50 Hz (source notation; confirm selection) |
| Fire suppression | S-type aerosol / HFC-227EA / perfluorohexanone options |
| Ingress protection | IP54 |
| Corrosion protection | C3; C4 / C5 optional |
| Parameter | Specification |
|---|---|
| System operating temperature | −30 to +50°C; derating above 45°C |
| Operating humidity | 0–95% RH; non-condensing |
| Altitude | ≤3000 m |
| Installation | Outdoor |
| Daily duty | Up to 2 charges and 2 discharges per day |
| Dimensions (W × D × H) | 9125 × 2438 × 2896 mm (30 ft) |
| Approximate weight | 52 t |
| Parameter | Specification |
|---|---|
| Communication interfaces | Ethernet |
| External communication protocol | Modbus TCP |
| PCS and AC grid connection | Separately specified project equipment |
| Plant EMS / PPC | Project-level control scope to be confirmed |
| Standards listed in source | GB/T 36276; GB/T 34131; UL 1973; UL 9540A; IEC 62619; UN38.3 |
Auxiliary AC supply ratings describe internal service power, not AC export capability. “CP” is the source rate notation retained without reinterpretation. Nameplate battery energy is not guaranteed usable AC energy. Standards are source references; confirm certificates and test-report scope for the supplied configuration.
Use generation and grid-dispatch profiles to define AC power, usable energy, delivery duration and reserve commitments. Evaluate auxiliary demand, conversion losses, temperature derating and the agreed end-of-life capacity target.
YINTU coordinates battery and PCS interface reviews with manufacturing partners. Check the full DC voltage window, communications, grid requirements, foundations, lifting access, corrosion conditions and maintenance clearances.
Confirm the battery supply boundary, external PCS, plant EMS/PPC, transformer, switchgear, protection, auxiliary power, civil works, fire design and commissioning responsibilities. Grid connection and local approvals are project-specific.
The published scope is the DC battery container. A compatible PCS and the required AC/MV interface are specified separately. The auxiliary AC supply does not make the container a standalone grid-connected system.
No direct PV-string interface is offered in this listing. Solar integration requires the appropriate PV inverter or DC conversion architecture, protection and plant controls. The illustrated scheme is one possible AC-coupled arrangement.
Start with the required AC MW, usable MWh, dispatch duration and end-of-life target. Account for the usable SOC window, conversion losses, auxiliary demand, temperature derating and reserve commitments. Select the converter against the entire battery voltage window and the agreed charge/discharge limits.
These functions require a specifically engineered complete system, including suitable PCS controls, auxiliary-power arrangements, protection and an approved operating sequence. They are not standalone capabilities guaranteed by this DC battery container.
Share the required AC power and usable energy, solar generation profile, grid connection voltage, dispatch schedule, site climate and available layout. YINTU can coordinate battery selection, PCS matching and technical clarification with manufacturing partners for a defined project scope.
Parameters are based on the supplied model datasheet and remain subject to final technical confirmation. Illustrations show application concepts, not completed YINTU projects. Listed standards require configuration-specific documentation; cycle life and design life are not warranty commitments.
Company Details
Business Type:
Distributor/Wholesaler,Exporter,Trading Company
Year Established:
2016
Total Annual:
$ 10 million-$ 20,million
Employee Number:
50~100
Ecer Certification:
Verified Supplier
Your Partner for Energy Storage Product Sourcing YINTU Energy is the energy storage business of Hunan Yintu New Materials Co., Ltd. Established in 2016, our company has 10-50 employees and an export share of 100%. We connect overseas distributors, installers, EPC companies and project buyers with... Your Partner for Energy Storage Product Sourcing YINTU Energy is the energy storage business of Hunan Yintu New Materials Co., Ltd. Established in 2016, our company has 10-50 employees and an export share of 100%. We connect overseas distributors, installers, EPC companies and project buyers with...
Get in touch with us
Leave a Message, we will call you back quickly!