China factories

Chat Now Send Email
China factory - Hunan Yintu New Materials Co., Ltd.

Hunan Yintu New Materials Co., Ltd.

  • China,Changsha ,Hunan
  • Verified Supplier
  1. Home
  2. Products
  3. About Us
  4. Contact Us

Leave a Message

we will call you back quickly!

Submit Requirement
China 5117 KWh Utility Scale Energy Storage Systems 30 Ft Air Cooled LFP Battery
China 5117 KWh Utility Scale Energy Storage Systems 30 Ft Air Cooled LFP Battery

  1. China 5117 KWh Utility Scale Energy Storage Systems 30 Ft Air Cooled LFP Battery
  2. China 5117 KWh Utility Scale Energy Storage Systems 30 Ft Air Cooled LFP Battery
  3. China 5117 KWh Utility Scale Energy Storage Systems 30 Ft Air Cooled LFP Battery

5117 KWh Utility Scale Energy Storage Systems 30 Ft Air Cooled LFP Battery

  1. MOQ:
  2. Price: Quotation on request
  3. Get Latest Price
Cooling method Air cooling
Approximate weight 52 t
Corrosion protection C3; C4 / C5 optional
Installation Outdoor
Supply scope DC-side battery container
Communication interfaces Ethernet
Packaging Details Container transport, lifting plan and shipping arrangements confirmed for the project.
Battery voltage range 1142–1468.8 V
BMS architecture 3-level
Auxiliary supply 25 kW; 380 V & 480 V / 50 Hz (source notation; confirm selection)
System operating temperature −30 to +50°C; derating above 45°C
Cell specification LFP / 3.2 V / 280 Ah
Container format 30 ft
Charge / discharge rate ≤0.5 CP
Ingress protection IP54
Temperature difference ≤5°C (system)
Dimensions W × D × H 9125 × 2438 × 2896 mm
Rated battery energy 5117.95 kWh
External protocol Modbus TCP
Delivery Time Confirmed after configuration approval
Nominal DC voltage 1305.6 V
Altitude ≤3000 m
Model Number YT-Utility ESS-5117kWh
Brand Name YINTU

View Detail Information

Inquiry by Email Get Latest Price
Chat online Now Ask for best deal
  1. Product Details
  2. Company Details

Product Specification

Cooling method Air cooling Approximate weight 52 t
Corrosion protection C3; C4 / C5 optional Installation Outdoor
Supply scope DC-side battery container Communication interfaces Ethernet
Packaging Details Container transport, lifting plan and shipping arrangements confirmed for the project. Battery voltage range 1142–1468.8 V
BMS architecture 3-level Auxiliary supply 25 kW; 380 V & 480 V / 50 Hz (source notation; confirm selection)
System operating temperature −30 to +50°C; derating above 45°C Cell specification LFP / 3.2 V / 280 Ah
Container format 30 ft Charge / discharge rate ≤0.5 CP
Ingress protection IP54 Temperature difference ≤5°C (system)
Dimensions W × D × H 9125 × 2438 × 2896 mm Rated battery energy 5117.95 kWh
External protocol Modbus TCP Delivery Time Confirmed after configuration approval
Nominal DC voltage 1305.6 V Altitude ≤3000 m
Model Number YT-Utility ESS-5117kWh Brand Name YINTU
High Light 5117 kWh Air Cooled Utility ESS ,30 ft Air Cooled Utility BESS ,Air Cooled LFP Battery Containers

UTILITY-SCALE DC BATTERY STORAGE

5117 kWh Air-Cooled DC Battery Container for Grid Energy Shifting

A 5117.95 kWh LFP battery container with controlled air cooling, offering a large DC energy block for grid dispatch and renewable generation projects. The 30 ft enclosure concentrates more than 5 MWh of nominal battery energy in one container. Its approximately 52 t weight and service access requirements should be addressed early in transport, crane and foundation planning.

Equipment and Supply Scope

This listing covers the DC-side battery container, including LFP batteries, battery management, thermal management, DC distribution and the specified protection systems. It is not a complete AC-connected power station. PCS, plant EMS/PPC, transformers, switchgear and grid connection equipment are separate project items unless expressly included in the agreed supply scope.

YINTU is an energy storage solution provider. We work with manufacturing partners to select battery equipment and coordinate the interfaces required for each project.

YT-Utility ESS-5117kWh application concept
Illustrative 30 ft battery-container application concept. External conversion and grid equipment are project-specific; this is not a completed-project photograph.

Grid and Renewable Energy Applications

Grid energy shifting: align stored energy with peak demand

Charge under an approved dispatch schedule and discharge through an external PCS during the selected peak period. The battery provides the energy reservoir; the PCS defines the AC conversion capability. Usable energy, reserve margins and conversion losses determine the actual delivery duration.

Renewable output smoothing and dispatch control

A coordinated PCS and plant EMS can charge or discharge the battery to moderate short-term variations in photovoltaic or wind output and follow an export schedule. The achievable ramp rate and response depend on converter capability, communications, available state of charge and the grid operator’s requirements.

Frequency regulation and operating reserves

The battery supplies or absorbs active energy when the selected PCS and controller respond to a regulation signal. Reserve availability must respect battery voltage, temperature, charge/discharge limits and state of charge. Frequency response is a complete-system function, not a standalone guarantee from the battery enclosure.

Peak management at a grid connection

Discharging during defined high-load intervals can reduce the peak power requested from a connection or support a constrained node. Suitability depends on the local load profile, connection limit and required duration. Any infrastructure-deferral or revenue case needs a project study; the battery rating alone does not establish the result.

System Features and Project Value

A defined energy block for plant design

The 30 ft enclosure concentrates more than 5 MWh of nominal battery energy in one container. Its approximately 52 t weight and service access requirements should be addressed early in transport, crane and foundation planning.

Controlled airflow across battery packs

Tree-inspired airflow channels and pack-level fan-speed control are described in the datasheet, with system temperature difference at or below 5°C. Coordinated cooling helps manage thermal conditions during the planned duty cycle. Ambient temperature and cooling auxiliary consumption must be included in the plant energy model.

Layered monitoring and protection

The three-level BMS works with DC collection, grounding and protection systems. Pack-targeted suppression, combustible-gas detection, smoke prevention and explosion venting are described alongside 5VA insulation materials. Final fire-system selection and site fire design require configuration-specific review.

Service life planned around real duty

The source states a 20-year design life and up to two charges and two discharges per day. These are design references, not a warranty or a promise of constant lifetime capacity. Dispatch depth, ambient conditions, maintenance and end-of-life capacity targets need to be agreed for the project.

How the System Fits Your Site

In the illustrated AC-coupled example, the battery DC output connects to a compatible bidirectional PCS, then through the project transformer and switchgear to the grid. A photovoltaic plant connects through its own inverter and interface equipment to the AC collector. Plant EMS/PPC coordinates dispatch and exchanges status with the BMS. This battery container does not connect directly to PV strings or the AC grid. Alternative architectures require an approved project design.

YT-Utility ESS-5117kWh conceptual system topology
Concept diagram only. Follow the approved single-line diagram and installation documents.

Technical Specifications

Battery and DC Ratings

Parameter Specification
Model YT-Utility ESS-5117kWh
Cell chemistry / specification LFP / 3.2 V / 280 Ah
Rated battery energy 5117.95 kWh
Nominal DC voltage 1305.6 V
Battery voltage range 1142–1468.8 V
Charge / discharge rate ≤0.5 CP
System voltage class 1500 V
AC output power Not specified; determined by separately selected PCS and system design
Design life 20 years (source design reference; not warranty)

Thermal Management and Protection

Parameter Specification
Cooling method / medium Air cooling; pack-level fan-speed control
Temperature difference ≤5°C (system)
BMS architecture 3-level
Auxiliary power supply 25 kW; 380 V & 480 V / 50 Hz (source notation; confirm selection)
Fire suppression S-type aerosol / HFC-227EA / perfluorohexanone options
Ingress protection IP54
Corrosion protection C3; C4 / C5 optional

Environment and Enclosure

Parameter Specification
System operating temperature −30 to +50°C; derating above 45°C
Operating humidity 0–95% RH; non-condensing
Altitude ≤3000 m
Installation Outdoor
Daily duty Up to 2 charges and 2 discharges per day
Dimensions (W × D × H) 9125 × 2438 × 2896 mm (30 ft)
Approximate weight 52 t

Interfaces and Project Scope

Parameter Specification
Communication interfaces Ethernet
External communication protocol Modbus TCP
PCS and AC grid connection Separately specified project equipment
Plant EMS / PPC Project-level control scope to be confirmed
Standards listed in source GB/T 36276; GB/T 34131; UL 1973; UL 9540A; IEC 62619; UN38.3

Auxiliary AC supply ratings describe internal service power, not AC export capability. “CP” is the source rate notation retained without reinterpretation. Nameplate battery energy is not guaranteed usable AC energy. Standards are source references; confirm certificates and test-report scope for the supplied configuration.

From Project Requirements to a Storage Plant

1. Define power, energy and dispatch

Use generation and grid-dispatch profiles to define AC power, usable energy, delivery duration and reserve commitments. Evaluate auxiliary demand, conversion losses, temperature derating and the agreed end-of-life capacity target.

2. Match equipment and site design

YINTU coordinates battery and PCS interface reviews with manufacturing partners. Check the full DC voltage window, communications, grid requirements, foundations, lifting access, corrosion conditions and maintenance clearances.

3. Confirm the project scope

Confirm the battery supply boundary, external PCS, plant EMS/PPC, transformer, switchgear, protection, auxiliary power, civil works, fire design and commissioning responsibilities. Grid connection and local approvals are project-specific.

Frequently Asked Questions

Does this product include a grid-connected inverter?

The published scope is the DC battery container. A compatible PCS and the required AC/MV interface are specified separately. The auxiliary AC supply does not make the container a standalone grid-connected system.

Can solar panels connect directly to the battery container?

No direct PV-string interface is offered in this listing. Solar integration requires the appropriate PV inverter or DC conversion architecture, protection and plant controls. The illustrated scheme is one possible AC-coupled arrangement.

How many containers and how much PCS power are needed?

Start with the required AC MW, usable MWh, dispatch duration and end-of-life target. Account for the usable SOC window, conversion losses, auxiliary demand, temperature derating and reserve commitments. Select the converter against the entire battery voltage window and the agreed charge/discharge limits.

Can it provide backup, grid-forming or black-start operation?

These functions require a specifically engineered complete system, including suitable PCS controls, auxiliary-power arrangements, protection and an approved operating sequence. They are not standalone capabilities guaranteed by this DC battery container.

Plan Your Utility-Scale Battery Storage Project

Share the required AC power and usable energy, solar generation profile, grid connection voltage, dispatch schedule, site climate and available layout. YINTU can coordinate battery selection, PCS matching and technical clarification with manufacturing partners for a defined project scope.

Parameters are based on the supplied model datasheet and remain subject to final technical confirmation. Illustrations show application concepts, not completed YINTU projects. Listed standards require configuration-specific documentation; cycle life and design life are not warranty commitments.

Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Distributor/Wholesaler,Exporter,Trading Company

  • Year Established:

    2016

  • Total Annual:

    $ 10 million-$ 20,million

  • Employee Number:

    50~100

  • Ecer Certification:

    Verified Supplier

Your Partner for Energy Storage Product Sourcing YINTU Energy is the energy storage business of Hunan Yintu New Materials Co., Ltd. Established in 2016, our company has 10-50 employees and an export share of 100%. We connect overseas distributors, installers, EPC companies and project buyers with... Your Partner for Energy Storage Product Sourcing YINTU Energy is the energy storage business of Hunan Yintu New Materials Co., Ltd. Established in 2016, our company has 10-50 employees and an export share of 100%. We connect overseas distributors, installers, EPC companies and project buyers with...

+ Read More

Get in touch with us

  • Reach Us
  • Hunan Yintu New Materials Co., Ltd.
  • 201, Building B6, Xinggongchang Industrial Park, No.1 Lantian North Road, Economic Development Zone, Changsha, Hunan, China
  • https://www.yintuenergy.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement