| Max PV Voltage | 950 V DC |
| Frequency | 50 / 60 Hz |
| Max Off-grid Parallel Units | 10; approved design |
| Approximate Weight | 2500 kg |
| Delivery Time | Confirmed in the project quotation |
| Payment Terms | T/T |
| Nominal Battery Energy | 261 kWh |
| Battery Protection | IP65; battery only |
| MPPT Channels | 1 or 4; confirm configuration |
| Rated Capacity | 314 Ah |
| Max PV Current | 200 A |
| Diesel Generator Port | Yes; interface to confirm |
| Switching Time | <10 ms; datasheet conditions |
| Supply Ability | 5 units |
| Battery Chemistry | LiFePO4 |
| Max PV Power | 120 kW |
| Max AC Current | 180 A |
| MPPT Voltage Range | 250–850 V DC |
| AC Voltage | 400 / 230 V; 3P+N+PE |
| Rated AC Power | 125 kW |
| Battery Cooling | Liquid cooling |
| Nominal Battery Voltage | 832 V |
| Solution Provider | YINTU |
| Packaging Details | Packing and shipping dimensions to be confirmed for the ordered configuration. |
| Model Number | YT-Hybrid ESS-125kW-261kWh |
| Brand Name | YINTU |
View Detail Information
Explore similar products
Integrated Commercial & Industrial Energy Storage IP65 Protection 250 KW Hybrid
150.5 KWh Commercial And Industrial Energy Storage Smart Temp Control Fire
52 KWh / 25 KW Hybrid ESS Energy Storage Cabinets IP54 For Commercial Industrial
Air Cooled Commercial & Industrial Energy Storage Systems 120 KWh 60 KW IP54
Product Specification
| Max PV Voltage | 950 V DC | Frequency | 50 / 60 Hz |
| Max Off-grid Parallel Units | 10; approved design | Approximate Weight | 2500 kg |
| Delivery Time | Confirmed in the project quotation | Payment Terms | T/T |
| Nominal Battery Energy | 261 kWh | Battery Protection | IP65; battery only |
| MPPT Channels | 1 or 4; confirm configuration | Rated Capacity | 314 Ah |
| Max PV Current | 200 A | Diesel Generator Port | Yes; interface to confirm |
| Switching Time | <10 ms; datasheet conditions | Supply Ability | 5 units |
| Battery Chemistry | LiFePO4 | Max PV Power | 120 kW |
| Max AC Current | 180 A | MPPT Voltage Range | 250–850 V DC |
| AC Voltage | 400 / 230 V; 3P+N+PE | Rated AC Power | 125 kW |
| Battery Cooling | Liquid cooling | Nominal Battery Voltage | 832 V |
| Solution Provider | YINTU | Packaging Details | Packing and shipping dimensions to be confirmed for the ordered configuration. |
| Model Number | YT-Hybrid ESS-125kW-261kWh | Brand Name | YINTU |
| High Light | 125 kW Industrial Energy Storage Cabinets ,Liquid Cooling Commercial Energy Storage Cabinets ,Customized Commercial Energy Storage Cabinets | ||
COMMERCIAL & INDUSTRIAL ENERGY STORAGE SOLUTIONS
A 125 kW hybrid energy storage system with a 261 kWh LFP battery and up to 120 kW PV input for commercial and industrial sites. Built-in MPPT and a diesel-generator interface support project designs that coordinate solar generation, storage and backup power.
The integrated cabinet combines battery storage, PCS, BMS, EMS and built-in MPPT. The source configuration is IYP-B261L-125H3-120M1-HX1. A diesel-generator port is listed, with generator ratings, controls and switching arrangements to be agreed for the site.
YINTU is an energy storage solution provider. We work with capable manufacturing partners to match equipment, system configuration and project services to each customer's commercial or industrial site.
Coordinate rooftop solar with workshop demand and charge/discharge schedules. A site load study identifies which peaks can be managed within 125 kW of rated AC power and the available battery energy. Machine starting and simultaneous loads are checked separately.
Use solar and storage as part of a supply strategy for refrigeration, lighting, handling equipment and office services. Maintain an appropriate reserve for designated essential loads, while scheduling discretionary charging or production around available generation.
Assess the system where daytime solar production coincides with processing, irrigation or packing operations. The generator interface allows a hybrid supply concept for periods when solar and battery energy are insufficient. Pump starting and motor compatibility require engineering review.
Develop a planned grid/off-grid operating scheme for locations with unreliable supply. The datasheet lists switching below 10 ms, but actual continuity depends on protection, switching, control settings and connected equipment; it is not an unconditional no-interruption guarantee.
The integrated PV input can simplify equipment coordination where solar and storage are designed together. The 120 kW PV limit, DC voltage window, current limit and selected MPPT arrangement guide string design. An external PV inverter is not assumed necessary for the supported direct DC input.
Built-in MPPT supports up to 120 kW PV input. The datasheet specifies a 250–850 V DC MPPT range and a 950 V DC maximum PV voltage. PV array design must satisfy all voltage and current limits, including site temperature conditions.
A diesel-generator interface is included in the listed functionality. YINTU coordinates the generator interface and the operating priorities with the manufacturing partner; fuel savings and generator sizing are assessed from the actual project rather than assumed.
Liquid cooling is specified for the battery, with intelligent PCS cooling. RS485 and WiFi communications are listed. Remote-service scope and site communications are confirmed in the project configuration.
The 125 kW rating and 261 kWh nominal energy provide two separate sizing inputs. Available backup time depends on usable energy, load profile, reserve and operating limits.
PV strings connect to the cabinet's built-in MPPT within the 120 kW PV limit. The hybrid PCS and battery coordinate with the site AC supply and designated commercial loads. The generator uses a separate interface in the approved design. The diagram shows functional relationships only: it does not authorize direct grid-generator paralleling or replace the required switching, protection and single-line design.
| Parameter | Specification |
|---|---|
| Product configuration | YT-Hybrid ESS-125kW-261kWh |
| Source series | YT-Hybrid ESS-125/250kW-261kWh |
| Source model | IYP-B261L-125H3-120M1-HX1 |
| Battery chemistry | LiFePO4 |
| Nominal battery energy | 261 kWh |
| Nominal battery voltage | 832 V |
| Rated capacity | 314 Ah |
| Battery cooling | Liquid cooling |
| Parameter | Specification |
|---|---|
| Maximum PV power | 120 kW |
| Maximum PV voltage | 950 V DC |
| MPPT voltage range | 250–850 V DC |
| Maximum PV current | 200 A |
| MPPT channels | 1 or 4, depending on configuration; confirm selection |
| PV connection | Direct DC input via built-in MPPT; string design subject to stated limits |
| Parameter | Specification |
|---|---|
| Rated on-grid / off-grid AC power | 125 kW |
| AC voltage / wiring | 400 / 230 V AC; L1 / L2 / L3 / N / PE |
| Frequency | 50 / 60 Hz |
| Maximum AC current | 180 A |
| Grid/off-grid switching time | <10 ms, as stated in the datasheet; system conditions apply |
| Maximum parallel units | 10; listed in the datasheet off-grid section |
| Diesel-generator port | Yes; electrical ratings and controls to be confirmed |
| AC power selection | Confirm available output under the specified battery, PV, temperature and SOC operating conditions |
| Parameter | Specification |
|---|---|
| Battery ingress protection | IP65 for the battery only; overall cabinet rating not specified |
| Fire protection | Yes; extinguishing medium and arrangement not specified |
| PCS cooling | Intelligent cooling |
| Operating temperature | -10°C to 55°C |
| Humidity | 5–95% |
| Altitude | <2,000 m |
| Communication | RS485 / WiFi |
| Dimensions | 1,520 × 1,350 × 2,000 mm; source order, confirm dimensional orientation |
| Approximate weight | 2,500 kg |
| Certification documents | Not specified in this datasheet; confirm required documents for the destination and exact configuration |
Identify whether the priority is peak management, solar self-consumption, backup or microgrid operation. Use the actual load profile and generation resources to set the power, energy and operating reserve.
YINTU coordinates equipment selection and technical clarification with the manufacturing partner, including voltage, controls, environment, expansion and optional functions.
The project quotation defines the cabinet configuration, external switchgear, protection and metering, PV equipment, generator interface, transport, commissioning support and after-sales responsibilities. External equipment and on-site works are included only when expressly specified. Warranty, lead time and commercial terms are confirmed in the agreed quotation.
Yes. The datasheet lists built-in MPPT and up to 120 kW PV input. Final string design must meet the voltage and current limits. The sheet lists 1 or 4 MPPT channels, so the ordered option must be confirmed.
A generator port is listed, but its detailed electrical ratings and control strategy are not supplied. YINTU coordinates the generator interface, source priority and switching requirements before confirming the project scope.
This version provides 125 kW rated AC power and up to 120 kW PV input. The 250 kW version accepts up to 240 kW PV input. Both list the same 261 kWh nominal battery energy.
No. The source explicitly assigns IP65 to the battery. The complete cabinet protection rating and suitability for the proposed installation environment must be confirmed.
YINTU provides solution selection and project coordination with manufacturing partners. Equipment supply, integration support, commissioning and service responsibilities are defined in the quotation for the specific project.
Send YINTU your location, grid voltage and frequency, interval load data, peak demand, PV capacity, generator details, required backup loads and operating hours. We will coordinate equipment selection and a project-specific configuration for technical review.
Specifications are transcribed from the supplied YINTU datasheets and remain subject to the confirmed configuration and approved technical documents. Nominal battery energy is not usable AC energy. Application images and topology diagrams are illustrative concepts, not completed project references. Final installation, protection, source switching and grid approval must follow the site design.
Company Details
Business Type:
Distributor/Wholesaler,Exporter,Trading Company
Year Established:
2016
Total Annual:
$ 10 million-$ 20,million
Employee Number:
50~100
Ecer Certification:
Verified Supplier
Your Partner for Energy Storage Product Sourcing YINTU Energy is the energy storage business of Hunan Yintu New Materials Co., Ltd. Established in 2016, our company has 10-50 employees and an export share of 100%. We connect overseas distributors, installers, EPC companies and project buyers with... Your Partner for Energy Storage Product Sourcing YINTU Energy is the energy storage business of Hunan Yintu New Materials Co., Ltd. Established in 2016, our company has 10-50 employees and an export share of 100%. We connect overseas distributors, installers, EPC companies and project buyers with...
Get in touch with us
Leave a Message, we will call you back quickly!