Ecer asks for your consent to use your personal data to:
Personalised advertising and content, advertising and content measurement, audience research and services development
Store and/or access information on a device
Your personal data will be processed and information from your device (cookies, unique identifiers, and other device data) may be stored by, accessed by and shared with 135 TCF vendor(s) and 65 ad partner(s), or used specifically by this site or app.
Some vendors may process your personal data on the basis of legitimate interest, which you can object to by do not consent. Contact our platform customer service, you can also withdraw your consent.
{"title":"Cylindrical Roller Bearings for Excavator Spare Parts Travel Device Swing","imgUrl":"https:\/\/img.chinax.com\/nimg\/2b\/25\/1489e75151d69b5268aa59945bb2-200x200-1\/cylindrical_roller_bearings_for_excavator_spare_parts_travel_device_swing_reducer.jpg","attrs":{"Minimum Order Quantity":"1 carton","Delivery":"by air sea and express","Packing":"Carton","Weight":"5-10kg"}}
{"title":"Construction Machinery Parts PC300-7 Main Control Valve Part PC200-7 PC130-7","imgUrl":"https:\/\/img.chinax.com\/nimg\/5c\/0b\/78e10f891c1a17529a35504c3c25-200x200-1\/construction_machinery_parts_pc300_7_main_control_valve_part_pc200_7_pc130_7_boom_arm_holding_valve_723_50_53102_723_40_82401.jpg","attrs":{"Place of Origin":"Guangdong, China","Minimum Order Quantity":"1 piece","Machinery Test Report":"Provided","Price":"$200 \/ piece"}}
{"title":"SK200-5-6 SK200-6E 2nd Carrier Assy for Swing Motor Reduction Gear Box Apply to","imgUrl":"https:\/\/img.chinax.com\/nimg\/9b\/23\/09739b0cae36b7a14b90ae907861-200x200-1\/sk200_5_6_sk200_6e_2nd_carrier_assy_for_swing_motor_reduction_gear_box_apply_to_kobelco_excavator_parts_yn32w01011p1.jpg","attrs":{"Place of Origin":"Guangdong, China","Warranty time":"3 Months","Model":"SK200-6","Weight":"25KG"}}
{"title":"Crawler Excavator Spare Parts EX300-5 Travel 2ND Carrier Assy With Sun Gear","imgUrl":"https:\/\/img.chinax.com\/nimg\/64\/89\/fb8cd0ee19fdd3568254dc009891-200x200-1\/crawler_excavator_spare_parts_ex300_5_travel_2nd_carrier_assy_with_sun_gear_3075002_2f3074989_2f1022197.jpg","attrs":{"Inner Packing":"Inner Packing","Product Name":"Carrier assembly","Machinery Test Report":"Provided","Outer Packing":"Carton or Plywood Case"}}
{"title":"PC60-6 RV Gear Assy with Shaft and Bearing for Travel Reduction Gear Box Final","imgUrl":"https:\/\/img.chinax.com\/nimg\/75\/29\/0ef59a09f3f1bb2264b61146cb61-200x200-1\/pc60_6_rv_gear_assy_with_shaft_and_bearing_for_travel_reduction_gear_box_final_drive_device_gm08_gm09.jpg","attrs":{"Video outgoing-inspection":"Not Available","Color":"as the picture","Condition":"new","Machinery Test Report":"Not Available"}}
{"title":"Yoongshing Excavator Replacement Parts Oil Pressure Sensor 660804 for Sany","imgUrl":"https:\/\/img.chinax.com\/nimg\/45\/91\/c738f76f020bf356ea5df356f186-200x200-1\/yoongshing_excavator_replacement_parts_oil_pressure_sensor_660804_for_sany.jpg","attrs":{"Warranty":"Unavailable","Video outgoing-inspection":"Provided","Quality":"Durable","Minimum Order Quantity":"1 piece"}}
1. Industrial-Grade Reliability & Durability Built with high-strength alloy components and an integrated heavy-duty structure, this engine is engineered to excel in extreme conditions such as mining sites, construction projects, and high-altitude environments. Its low failure rate and long service life significantly reduce downtime and maintenance costs, ensuring stable operation even under continuous heavy loads .
2. Powerful Performance & Optimal Fuel Efficiency Equipped with an advanced turbocharging system and high-precision fuel injection technology, it delivers exceptional low-end torque and instant response, providing strong power for excavation and lifting operations. Meanwhile, its optimized combustion design ensures high fuel utilization, striking a perfect balance between operation efficiency and cost savings .
3. Easy Maintenance & Wide Compatibility Featuring a modular design with rationally laid-out components, daily inspections, filter replacements, and overhauls can be completed efficiently. The engine supports flexible adaptation to various excavator models and mechanical equipment, with high parts commonality within the platform, making modifications and replacements straightforward .
4. Mature Technology & Global After-Sales Support Backed by a proven industrial power platform and extensive market validation, it offers stable and reliable technical performance. We provide a comprehensive global customer service network and spare parts supply system, ensuring fast fault response and convenient parts access to support the long-term efficient operation of your equipment .
About this supplier
Our company was founded in 2000, mainly engaged in the production and sales of excavator parts. Our main products include YOONGSHING brand travel and swing gears, gear reducers, reducer accessories, bearings, oil seals, pulleys, used excavator parts, engines, used refurbished engines, engine parts, as well as the maintenance of excavator travel and swing reducers. Our company is one of the earliest enterprises in China engaged in the construction machinery parts industry. We have a complete range of products for various machine models to meet customer needs, with rich experience to ensure worry-free after-sales service for customers. We strictly control the quality of products to make customers feel assured when using them.
Company overview
Production workflow
Competitive advantages
Factory profile
Customization capabilities
Packaging & shipping specifications
FAQs
Is this engine a new, remanufactured, or used unit?
We offer new/remanufactured/used options (customizable per your request). All units undergo 100% professional testing before shipment to ensure performance meets OEM standards.
What is the warranty period for this engine?
We provide a 12-month/1500-hour warranty (whichever comes first) for new/remanufactured engines, covering manufacturing defects. Used engines come with a 3-month/500-hour limited warranty.
How long is the lead time for production and shipping?
For in-stock units, we ship within 3-7 working days after payment confirmation. For custom orders, the lead time is 15-25 working days, depending on your requirements.
What packaging and shipping methods do you use?
The engine is packed in export-grade wooden crates with anti-rust and shockproof treatment. We support sea, air, and land transportation (e.g., FOB/CIF/DDP) to meet your logistics needs.
Are spare parts available for this engine after purchase?
We maintain a full inventory of original and aftermarket spare parts for this engine model, ensuring quick delivery of wear parts (filters, injectors, gaskets) at competitive prices.
Guangzhou YOONGSHING Machinery Equipment Co., Ltd.Founded with over 25 years of expertise in the engineering machinery industry, we are a leading integrated manufacturer and supplier of excavator spare parts, based in Guangzhou, China.
We specialize in a full range of excavator components, includin... Guangzhou YOONGSHING Machinery Equipment Co., Ltd.Founded with over 25 years of expertise in the engineering machinery industry, we are a leading integrated manufacturer and supplier of excavator spare parts, based in Guangzhou, China.
We specialize in a full range of excavator components, includin...