China factories

Chat Now Send Email
China factory - Jiangsu Zhonghai Bridge Equipment Co.,LTD

Jiangsu Zhonghai Bridge Equipment Co.,LTD

  • China,Zhenjiang ,Jiangsu
  • Verified Supplier
  1. Home
  2. Products
  3. About Us
  4. Contact Us

Leave a Message

we will call you back quickly!

Submit Requirement
China Construction Safety Prefabricated Steel Bailey Bridge 300m Length
China Construction Safety Prefabricated Steel Bailey Bridge 300m Length

  1. China Construction Safety Prefabricated Steel Bailey Bridge 300m Length

Construction Safety Prefabricated Steel Bailey Bridge 300m Length

  1. MOQ: 1 Pcs
  2. Price: USD 95-450
  3. Get Latest Price
Payment Terms L/C,D/P,T/T
Supply Ability 60000ton/year
Delivery Time 8-10 work days
Packaging Details Naked
Name Bailey Bridge
Net Width 3.15m,3.6m,4.2m,7.35m,10.5m
Type Truss Bridge
Material Steel
Length 300
Coating galvanized
Structure TSR
Brand Name Zhonghai Bailey Bridge
Model Number CB200/CB321
Certification IS09001, CE
Place of Origin China

View Detail Information

Inquiry by Email Get Latest Price
Chat online Now Ask for best deal
  1. Product Details
  2. Company Details

Product Specification

Payment Terms L/C,D/P,T/T Supply Ability 60000ton/year
Delivery Time 8-10 work days Packaging Details Naked
Name Bailey Bridge Net Width 3.15m,3.6m,4.2m,7.35m,10.5m
Type Truss Bridge Material Steel
Length 300 Coating galvanized
Structure TSR Brand Name Zhonghai Bailey Bridge
Model Number CB200/CB321 Certification IS09001, CE
Place of Origin China
High Light steel bailey bridge 300msafety bailey bridge panelsafety steel bailey bridge

Prefabricated Bailey Bridge/excellent Quality Bailey Bridge


In the bridge reconstruction construction, in order to ensure construction safety, the following safety equipment is required:


Protective equipment
- **Safety helmets and safety belts**: Construction workers must wear safety helmets and safety belts, especially when working at heights, the safety belts should be tied to a secure place to prevent people from falling.
- **Guardrails and safety nets**: Guardrails are set up around the bridge deck, the edge of the scaffolding, and other locations, and safety nets are hung on both sides of the bridge and between the scaffolding and the bridge to prevent people and objects from falling.
- **Anti-slip shoes and gloves**: Provide anti-slip shoes and gloves for construction workers to increase grip and stability on slippery or rough surfaces.


Warning equipment
- **Warning signs and warning lights**: Set up obvious warning signs in the construction area to indicate the construction scope and dangerous areas. During night construction, warning lights should be set up to remind passing vehicles and pedestrians to pay attention to safety.
- **Traffic diversion facilities**: When there is social traffic in the construction area, traffic diversion facilities such as traffic cones, warning signs, etc. should be set up, and special personnel should be arranged to divert traffic.


Hoisting and lifting equipment
- **Hoisting equipment**: According to the specific needs of bridge reconstruction, select appropriate lifting equipment, such as truck cranes, crawler cranes, gantry cranes, crane ships, tower cranes, etc. The lifting equipment should be accepted before entering the site, and should be used in accordance with the technical performance, load-bearing capacity and other requirements specified in the factory manual.
- **Lifting equipment and rigging**: Use hoists, pulley blocks, wire ropes, hoists, hooks, clasps and various jacks and other lifting equipment and rigging. These equipment should use qualified products in good condition and be inspected and maintained regularly.


Monitoring and protection equipment
- **Construction monitoring equipment**: Install construction monitoring equipment to monitor and control the internal force and linear shape of the bridge structure in real time to ensure structural safety and that the internal force and linear shape meet the design requirements.
- **Over-limit protectors and protective covers**: Install over-limit protectors, protective covers and other devices on mechanical equipment to prevent safety accidents caused by equipment overload or misoperation.
- **Grounding device and lightning arrester**: Grounding device and lightning arrester are installed to prevent electrical equipment leakage and lightning strike accidents.


Emergency escape equipment
- **Escape passage**: Escape passage is installed in the construction area to ensure that personnel can evacuate quickly in an emergency.
- **First aid equipment**: First aid kits, stretchers and other first aid equipment are equipped so that first aid can be provided in time when personnel are injured.


Other equipment
- **Temporary power protection device**: When there are 5 or more temporary power equipment at the construction site or the total capacity of the equipment is 50kW or more, a temporary power construction organization design should be prepared and a temporary power protection device should be installed.
- **Windproof cable and ground anchor**: For various temporary facilities such as brackets (brackets) and towers, windproof cables and ground anchors should be installed to enhance their stability.



Specifications:

CB200 Truss Press Limited Table
NO. Internal Force Structure Form
Not Reinforced Model Reinforced Model
SS DS TS QS SSR DSR TSR QSR
200 Standard Truss Moment(kN.m) 1034.3 2027.2 2978.8 3930.3 2165.4 4244.2 6236.4 8228.6
200 Standard Truss Shear (kN) 222.1 435.3 639.6 843.9 222.1 435.3 639.6 843.9
201 High Bending Truss Moment(kN.m) 1593.2 3122.8 4585.5 6054.3 3335.8 6538.2 9607.1 12676.1
202 High Bending Truss Shear(kN) 348 696 1044 1392 348 696 1044 1392
203 Shear Force of Super High Shear Truss(kN) 509.8 999.2 1468.2 1937.2 509.8 999.2 1468.2 1937.2

​​

CB200 Table of Geometric Characteristics of Truss Bridge(Half Bridge)
Structure Geometric Characteristics
Geometric Characteristics Chord Area(cm2) Section Properties(cm3) Moment of Inertia(cm4)
ss SS 25.48 5437 580174
SSR 50.96 10875 1160348
DS DS 50.96 10875 1160348
DSR1 76.44 16312 1740522
DSR2 101.92 21750 2320696
TS TS 76.44 16312 1740522
TSR2 127.4 27185 2900870
TSR3 152.88 32625 3481044
QS QS 101.92 21750 2320696
QSR3 178.36 38059 4061218
QSR4 203.84 43500 4641392

​​

CB321(100) Truss Press Limited Table
No. Lnternal Force Structure Form
Not Reinforced Model Reinforced Model
SS DS TS DDR SSR DSR TSR DDR
321(100) Standard Truss Moment(kN.m) 788.2 1576.4 2246.4 3265.4 1687.5 3375 4809.4 6750
321(100) Standard Truss Shear (kN) 245.2 490.5 698.9 490.5 245.2 490.5 698.9 490.5
321 (100) Table of geometric characteristics of truss bridge(Half bridge)
Type No. Geometric Characteristics Structure Form
Not Reinforced Model Reinforced Model
SS DS TS DDR SSR DSR TSR DDR
321(100) Section properties(cm3) 3578.5 7157.1 10735.6 14817.9 7699.1 15398.3 23097.4 30641.7
321(100) Moment of inertia(cm4) 250497.2 500994.4 751491.6 2148588.8 577434.4 1154868.8 1732303.2 4596255.2



Advantage

Possessing the features of simple structure,
convenient transport, speedy erection
easy disassembling,
heavy loading capacity,
great stability and long fatigue life
being capable of an alternative span, loading capacity



Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer

  • Year Established:

    2014

  • Total Annual:

    20753202.90-27670940.00

  • Employee Number:

    100~150

  • Ecer Certification:

    Verified Supplier

Introduction to Jiangsu Zhonghai Bridge Equipment Co., Ltd. Jiangsu Zhonghai Bridge Equipment Co., Ltd., established in 2010, is a high-tech enterprise specializing in the research, development, manufacturing, and sales of bridge equipment. With a registered capital of 55 million yuan, the company ... Introduction to Jiangsu Zhonghai Bridge Equipment Co., Ltd. Jiangsu Zhonghai Bridge Equipment Co., Ltd., established in 2010, is a high-tech enterprise specializing in the research, development, manufacturing, and sales of bridge equipment. With a registered capital of 55 million yuan, the company ...

+ Read More

Get in touch with us

  • Reach Us
  • Jiangsu Zhonghai Bridge Equipment Co.,LTD
  • No. 83, Dantu New City Section, Speech Highway, Dantu District, Zhenjiang, Jiangsu, China
  • https://www.zhonghaibridge.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement