Payment Terms | L/C,D/P,T/T |
Supply Ability | 60000ton/year |
Delivery Time | 8-10 work days |
Packaging Details | Naked |
Product Capability | 60000 Pieces Per Year |
Grade | Q355B |
Qualification | ISO or Similar |
Main Steel | Q345B |
Finish | Hot-dipped Galvanized or black |
Name | Bailey Bridge |
Material | Steel |
Type | Truss bridge |
Surface Protection | hot-dip galvanized |
Secondary Steel | Q235 |
Brand Name | Zhonghai Bailey Bridge |
Model Number | CB200/CB321 |
Certification | IS09001, CE |
Place of Origin | China |
View Detail Information
Explore similar products
Painted Light Gray Steel Structure Bridge / Bailey Bridge Used For Roads
Modular Small Steel Truss Bridge Hot Dip Galvanized Steel Bridge
Prefab Steel Bridge Galvanized Or Pained Steel Frame Bridge 50-100 years Design
Compact Panel Permanent Assembly Prefabricated Steel Truss Bridge Modular Design
Product Specification
Payment Terms | L/C,D/P,T/T | Supply Ability | 60000ton/year |
Delivery Time | 8-10 work days | Packaging Details | Naked |
Product Capability | 60000 Pieces Per Year | Grade | Q355B |
Qualification | ISO or Similar | Main Steel | Q345B |
Finish | Hot-dipped Galvanized or black | Name | Bailey Bridge |
Material | Steel | Type | Truss bridge |
Surface Protection | hot-dip galvanized | Secondary Steel | Q235 |
Brand Name | Zhonghai Bailey Bridge | Model Number | CB200/CB321 |
Certification | IS09001, CE | Place of Origin | China |
High Light | galvanized prefabricated truss bridge ,galvanized steel pipe bridge ,steel prefabricated truss bridge |
Steel Mill Bridge For Sale/steel Pipe Bridge
Prefabricated highway steel bridges offer a range of significant benefits that make them highly advantageous for modern infrastructure projects:
1. **Speed of Construction**:
Prefabricated steel bridges can be constructed much faster than traditional bridges. Components are manufactured off-site in a controlled environment, reducing on-site work and minimizing traffic disruption. This approach allows for quicker project completion, which is particularly important in urban areas where minimizing disruptions is essential.
2. **Cost Efficiency**:
These bridges can significantly reduce overall project costs. Reduced labor costs, decreased need for on-site equipment, and minimized construction time contribute to lower budgets. Additionally, prefabrication generates less waste and promotes sustainability.
3. **Enhanced Quality Control**:
Manufacturing components in a factory setting allows for rigorous testing and inspection, ensuring high-quality standards. This reduces the likelihood of defects and structural failures once the bridge is assembled.
4. **Design Flexibility**:
Prefabricated steel bridges offer extensive design possibilities. Engineers can create customized solutions tailored to specific site conditions or aesthetic requirements without compromising structural integrity. This flexibility extends to various environments and applications, from pedestrian walkways to vehicular overpasses.
5. **Reduced Environmental Impact**:
Prefabricated bridges minimize disruption to surrounding ecosystems during installation. On-site work is limited mainly to assembling pre-manufactured components, reducing noise pollution and traffic congestion. Many manufacturers also emphasize sustainable practices, using recycled materials or low-energy manufacturing processes.
6. **Improved Safety**:
Prefabricated bridges reduce risks associated with traditional construction methods. Off-site fabrication minimizes worker exposure to hazardous conditions, and reduced on-site time decreases the potential for accidents.
7. **Resilience Against Natural Disasters**:
Prefabricated steel bridges can be engineered to withstand extreme conditions such as earthquakes or hurricanes. Advanced materials and design techniques ensure durability and resilience.
8. **Maintenance and Longevity**:
Modern steel bridges benefit from advanced coating technologies that enhance durability and reduce maintenance requirements. With proper maintenance, steel bridges can serve communities for many decades.
These benefits make prefabricated highway steel bridges an ideal choice for various infrastructure projects, offering efficiency, sustainability, and long-term value.
Specifications:
CB321(100) Truss Press Limited Table | |||||||||
No. | Lnternal Force | Structure Form | |||||||
Not Reinforced Model | Reinforced Model | ||||||||
SS | DS | TS | DDR | SSR | DSR | TSR | DDR | ||
321(100) | Standard Truss Moment(kN.m) | 788.2 | 1576.4 | 2246.4 | 3265.4 | 1687.5 | 3375 | 4809.4 | 6750 |
321(100) | Standard Truss Shear (kN) | 245.2 | 490.5 | 698.9 | 490.5 | 245.2 | 490.5 | 698.9 | 490.5 |
321 (100) Table of geometric characteristics of truss bridge(Half bridge) | |||||||||
Type No. | Geometric Characteristics | Structure Form | |||||||
Not Reinforced Model | Reinforced Model | ||||||||
SS | DS | TS | DDR | SSR | DSR | TSR | DDR | ||
321(100) | Section properties(cm3) | 3578.5 | 7157.1 | 10735.6 | 14817.9 | 7699.1 | 15398.3 | 23097.4 | 30641.7 |
321(100) | Moment of inertia(cm4) | 250497.2 | 500994.4 | 751491.6 | 2148588.8 | 577434.4 | 1154868.8 | 1732303.2 | 4596255.2 |
CB200 Truss Press Limited Table | |||||||||
NO. | Internal Force | Structure Form | |||||||
Not Reinforced Model | Reinforced Model | ||||||||
SS | DS | TS | QS | SSR | DSR | TSR | QSR | ||
200 | Standard Truss Moment(kN.m) | 1034.3 | 2027.2 | 2978.8 | 3930.3 | 2165.4 | 4244.2 | 6236.4 | 8228.6 |
200 | Standard Truss Shear (kN) | 222.1 | 435.3 | 639.6 | 843.9 | 222.1 | 435.3 | 639.6 | 843.9 |
201 | High Bending Truss Moment(kN.m) | 1593.2 | 3122.8 | 4585.5 | 6054.3 | 3335.8 | 6538.2 | 9607.1 | 12676.1 |
202 | High Bending Truss Shear(kN) | 348 | 696 | 1044 | 1392 | 348 | 696 | 1044 | 1392 |
203 | Shear Force of Super High Shear Truss(kN) | 509.8 | 999.2 | 1468.2 | 1937.2 | 509.8 | 999.2 | 1468.2 | 1937.2 |
CB200 Table of Geometric Characteristics of Truss Bridge(Half Bridge) | ||||
Structure | Geometric Characteristics | |||
Geometric Characteristics | Chord Area(cm2) | Section Properties(cm3) | Moment of Inertia(cm4) | |
ss | SS | 25.48 | 5437 | 580174 |
SSR | 50.96 | 10875 | 1160348 | |
DS | DS | 50.96 | 10875 | 1160348 |
DSR1 | 76.44 | 16312 | 1740522 | |
DSR2 | 101.92 | 21750 | 2320696 | |
TS | TS | 76.44 | 16312 | 1740522 |
TSR2 | 127.4 | 27185 | 2900870 | |
TSR3 | 152.88 | 32625 | 3481044 | |
QS | QS | 101.92 | 21750 | 2320696 |
QSR3 | 178.36 | 38059 | 4061218 | |
QSR4 | 203.84 | 43500 | 4641392 |
Advantage
Possessing the features of simple structure,
convenient transport, speedy erection
easy disassembling,
heavy loading capacity,
great stability and long fatigue life
being capable of an alternative span, loading capacity
Company Details
Business Type:
Manufacturer
Year Established:
2014
Total Annual:
20753202.90-27670940.00
Employee Number:
100~150
Ecer Certification:
Verified Supplier
Introduction to Jiangsu Zhonghai Bridge Equipment Co., Ltd. Jiangsu Zhonghai Bridge Equipment Co., Ltd., established in 2010, is a high-tech enterprise specializing in the research, development, manufacturing, and sales of bridge equipment. With a registered capital of 55 million yuan, the company ... Introduction to Jiangsu Zhonghai Bridge Equipment Co., Ltd. Jiangsu Zhonghai Bridge Equipment Co., Ltd., established in 2010, is a high-tech enterprise specializing in the research, development, manufacturing, and sales of bridge equipment. With a registered capital of 55 million yuan, the company ...
Get in touch with us
Leave a Message, we will call you back quickly!