| Payment Terms | MoneyGram |
| Supply Ability | Supply Capacity |
| Delivery Time | A period of three months |
| Packaging Details | container |
| Brand Name | zonglan |
| Model Number | X012 |
| Place of Origin | henan |
View Detail Information
Explore similar products
Temperature Range 300-1000°C Fluidized-Bed Roasting High Automation Level for
Heat Transfer Fluid Bed Furnace 5 - 30 Minutes Fluidized Bed Incinerator
Low Operating Cost High Automation Level for Fluidized Bed Roasting Residence
300 To 1000 Degree Industrial Roaster Industrial Fluidised Bed Roaster 30min
Product Specification
| Payment Terms | MoneyGram | Supply Ability | Supply Capacity |
| Delivery Time | A period of three months | Packaging Details | container |
| Brand Name | zonglan | Model Number | X012 |
| Place of Origin | henan | ||
| High Light | Refractory Gold Ore Processing Fluidized Bed Roaster ,12-24 Hour Leaching Fluidized Bed Roasting Equipment ,Direct 99.99% Pure Gold Production Industrial Roaster | ||
Gold is often locked within sulfide minerals like pyrite and arsenopyrite as fine-grained or sub-microscopic particles. The cyanide leaching solution cannot access and extract the gold without first breaking down these host minerals.
![]()
The conventional gold extraction process primarily relies on two core technologies: "Flash Leaching" and "One-Step Gold Reduction." The well-established cyanidation method typically requires a leaching time of 36 to 96 hours. The entire cycle—from carbon adsorption and stripping to elution, electrolysis, and finally producing finished gold—usually spans 15 to 30 days, with a recovery rate generally between 50% and 70%.
![]()
In contrast, the new extraction method achieves leaching in just 12 to 24 hours and enables direct production of 99.99% pure gold from the pregnant solution. Furthermore, the entire process is environmentally friendly; the leaching agent is non-toxic and harmless, even possessing disinfectant properties. The leachate can be fully recycled after use, achieving true zero discharge of chemicals.
The presence of reactive components in the ore can severely hinder gold dissolution. These components engage in competitive side reactions with both cyanide and oxygen, resulting in excessive reagent consumption and significantly impeding the leaching process.
Company Details
Business Type:
Distributor/Wholesaler,Exporter,Seller
Year Established:
2018
Total Annual:
1000000-10000000
Employee Number:
130~150
Ecer Certification:
Verified Supplier
Henan Zoomline Machinery Manufacturing co. Ltd is located in Wen County, Jiaozuo City, Henan Province. It is mainly engaged in the production and installation of mining equipment and building materials equipment, as well as the relevant process design, equipment production and installation of harmle... Henan Zoomline Machinery Manufacturing co. Ltd is located in Wen County, Jiaozuo City, Henan Province. It is mainly engaged in the production and installation of mining equipment and building materials equipment, as well as the relevant process design, equipment production and installation of harmle...
Get in touch with us
Leave a Message, we will call you back quickly!