| Payment Terms | T/T, L/C, Western Union |
| Supply Ability | 500,000 pcs per year |
| Delivery Time | 15-30 working days after received your advance payment |
| Packaging Details | Standard export packaging like carton/ wooden box |
| Color | silver |
| Surface | Mill finish |
| Use place | Heat exchange, heat sink for water cooling, battery cooling |
| Temper | O, H etc |
| Packing | Carton or wooden box |
| Thickness | 1-4mm |
| Size | Customerized |
| Technical | Brazing |
| Brand Name | Trumony |
| Model Number | TR-J006 |
| Certification | TS16949 , ISO14001 and OHSAS 18001 |
| Place of Origin | China |
View Detail Information
Explore similar products
Customized High Quality Battery Vechical Electric High Thermal Conductivity Heat
FSW Brazed Welding Cold Plate For Truck Battery Cooling System
Aluminum Liquid Cooling Unit For Battery Energy Storage System (BESS) Rack
H112 Serpentine 3003 Aluminum Plate For Vehicle Battery Cooling
Product Specification
| Payment Terms | T/T, L/C, Western Union | Supply Ability | 500,000 pcs per year |
| Delivery Time | 15-30 working days after received your advance payment | Packaging Details | Standard export packaging like carton/ wooden box |
| Color | silver | Surface | Mill finish |
| Use place | Heat exchange, heat sink for water cooling, battery cooling | Temper | O, H etc |
| Packing | Carton or wooden box | Thickness | 1-4mm |
| Size | Customerized | Technical | Brazing |
| Brand Name | Trumony | Model Number | TR-J006 |
| Certification | TS16949 , ISO14001 and OHSAS 18001 | Place of Origin | China |
| High Light | aluminum auto parts , aluminum car radiator | ||
3003 Brazed liquid cooling panel for Heat sink of Electrical car design develop
1. Description of production:
Cold stamping - cleaning - spray flux - fixture clamp the product into the brazing furnace - brazing furnace after more than a dozen procedures (automatic heating/insulation/cooling/welding, etc.) - do full inspection of air tightness test - cleaning (mainly for welding cleaning, polishing, drying), a total of more than 20 process.
Plate thickness: our company can achieve a single plate thickness of 0.8-1.5mm, 0.8,1.0,1.2mm, the minimum plate thickness can be achieved plate + channel plate 0.8mm+0.8mm, currently 1.0mm+1.0mm has been produced, 0.8mm+0.8mm is not batch, it needs to be verified, and 0.8mm+0.8mm pressure resistance is relatively bad, done plate 1.2mm, channel plate 1.0mm
1) Cladding Material:
| Alloy | Si | Fe | Cu | Mn | Mg | Zn | Zr | Ti | code |
| 3003 | 0.6 | 0.7 | 0.05-0.20 | 1.0-1.5 | - | 0.1 | 0.05 | 0.03 | 1 |
| 3003+1%Zn | 0.6 | 0.7 | 0.05-0.20 | 1.0-1.5 | - | 0.5-1.50 | 0.05 | 0.05 | 2 |
| 3003+1.5%Zn | 0.6 | 0.7 | 0.05-0.20 | 1.0-1.5 | - | 1.0-2.0 | 0.05 | 0.05 | 3 |
| 3003+1.5%Zn+Zr | 0.5-1.0 | 0.7 | 0.05-0.20 | 1.0-1.6 | - | 1.0-2.0 | 0.05-0.2 | - | 4 |
| 3003+0.5%Cu | 0.6 | 0.7 | 0.30-0.70 | 1.0-1.5 | - | 0.10 | 0.05 | 0.1 | 5 |
| 3005 | 0.6 | 0.7 | 0.20-0.40 | 1.0-1.5 | 0.20-0.60 | 0.25 | - | 0.01 | 6 |
Core Material
| Alloy | Si | Fe | Cu | Mn | Mg | Zn | Zr | Ti | code |
| 4343 | 6.8-8.2 | 0.8 | 0.25 | 0.1 | - | 0.2 | - | 0.05 | 1 |
| 4343+1%Zn | 6.8-8.2 | 0.8 | 0.25 | 0.1 | - | 0.5-1.5 | - | 0.05 | 2 |
| 4045 | 9.0-11.0 | 0.8 | 0.3 | 0.05 | - | 0.2 | - | 0.2 | 3 |
| 4045+1%Zn | 9.0-11.0 | 0.8 | 0.3 | 0.05 | - | 0.5-1.5 | - | 0.2 | 4 |
| 4004 | 9.0-10.5 | 0.8 | 0.25 | 0.1 | 1.0-2.0 | 0.2 | - | 0.2 | 5 |
2) Main mechanical of aluminum alloy and composite-material for welding heat exchanger
| Alloy Code | temper | Tensile Strength Rm(MPa) | Yield Strength Rp0.2(Mpa) | Extend Ratio A50(%) |
| TR-010,TR-020,TR-030,TR-040,TR-050,TR-110,TR-310,TR-116,TR-316,TR-111,TR-313,TR-121,TR-131,TR-141,TR-150,TR-151,TR-156 Etc. | O | 95-135* | ≥35* | ≥15* |
| H14 | 140-185 | ≥125 | ≥1.5 | |
| H24 | 140-185 | ≥125 | ≥3.0 | |
| H16 | 185-225 | ≥160 | ≥1.0 | |
| H18 | ≥185 | - | ≥0.5 | |
| TR-166 Etc.tube material | H24 | 185-235 | ≥150 | ≥8 |
| TR-116,TR-316 Etc.tube material | H14 | 140-185 | ≥125 | ≥3 |
| H24 | 140-185 | ≥125 | ≥8 |
2.Our advantage of 3003 Brazed cold water sheet for heat sink of electrical vehicle:
1. Since 2006, we have rich experience in this aluminum heat exchange industry in China, and have attend many electrical vehicle develop progrem, can reduce your develop time;
2. Good reputation in household and industrial aluminum spare parts areas;
3. Design ability: We have design team to achieve your idea or give you suggestion
4. Price advantage.
5. Good experience and cooperation with big clients in the world;
6. With Certificate ISO9001-2008;
7. Sample order is acceptable
8. High performance cost ratio;
9.Fast delivery time and fast resolve problem attitude.
3.Terms and conditions:
1, Trade term: CIF / CFR / FOB / EXW
2, Payment term: 30% before production+70% before shipment;
100% Irrevocable L/C at sight
Or we can further cummunicate with each other about this part.
3, Shipment: Normally it is about 15-30 days.![]()
![]()
![]()
![]()
![]()
Company Details
Business Type:
Manufacturer,Exporter,Seller
Year Established:
2017
Total Annual:
>$30,000,000
Employee Number:
200~500
Ecer Certification:
Verified Supplier
Trumony Aluminum Limited which was founded in 2017 is headquartered in Suzhou, a traditional cultural and commercial hub. "Helping technology get off the ground and helping customers succeed" is its mission. "Adhering to the concept of green development and continuously contributing to the global ca... Trumony Aluminum Limited which was founded in 2017 is headquartered in Suzhou, a traditional cultural and commercial hub. "Helping technology get off the ground and helping customers succeed" is its mission. "Adhering to the concept of green development and continuously contributing to the global ca...
Get in touch with us
Leave a Message, we will call you back quickly!