Payment Terms | T/T, L/C, Western Union |
Supply Ability | 500,000 mt per year |
Delivery Time | 15-30 working days after received your advance payment |
Packaging Details | Standard export packaging like carton/ wooden box |
Color | silver color |
Treatment | Mill finish coating |
Use area | Liquid cooling, battery cooling for heat exchange |
Technical | Brazed |
Thickness | 1-7mm |
Dimention | Width and length according to requirement |
Brand Name | Trumony |
Model Number | TR-J009 |
Certification | TS16949 , ISO14001 and OHSAS 18001 |
Place of Origin | China |
View Detail Information
Explore similar products
CNC Prototype Machined Aluminum Thin Sheet for Customized Design
Flexible Battery Pack Aluminum Radiator Parts Extrusion Micro Channel Pipe
Hot Rolling Aluminum Spare Parts Extrusion Heat Sink Radiator Aluminum Auto
Silver Aluminum Spare Parts Heat Sink Oil Cooler Air Cooler Manifold For Vehicle
Product Specification
Payment Terms | T/T, L/C, Western Union | Supply Ability | 500,000 mt per year |
Delivery Time | 15-30 working days after received your advance payment | Packaging Details | Standard export packaging like carton/ wooden box |
Color | silver color | Treatment | Mill finish coating |
Use area | Liquid cooling, battery cooling for heat exchange | Technical | Brazed |
Thickness | 1-7mm | Dimention | Width and length according to requirement |
Brand Name | Trumony | Model Number | TR-J009 |
Certification | TS16949 , ISO14001 and OHSAS 18001 | Place of Origin | China |
3003 EV Battery cooling brazed aluminum alloy water cooling plate
We offer R&D recommendation,tooling design service together with sample supply for prototype manufacturing. We have combined our supply chain with brazing technolody,extrusion technology,CNC processing,painting,
welding etc thus ensured our clients with one stop sourcing for short sample delivery time and mass production cost efficiency.
1. Description of our production
Process: Cold stamping - cleaning - spray flux - fixture clamp the product into the brazing furnace - brazing furnace after more than a dozen procedures (automatic heating/insulation/cooling/welding, etc.) - do full inspection of air tightness test - cleaning (mainly for welding cleaning, polishing, drying) a total of more than 20 procedures
1) Cladding Material
Alloy | Si | Fe | Cu | Mn | Mg | Zn | Zr | Ti | code |
3003 | 0.6 | 0.7 | 0.05-0.20 | 1.0-1.5 | - | 0.1 | 0.05 | 0.03 | 1 |
3003+1%Zn | 0.6 | 0.7 | 0.05-0.20 | 1.0-1.5 | - | 0.5-1.50 | 0.05 | 0.05 | 2 |
3003+1.5%Zn | 0.6 | 0.7 | 0.05-0.20 | 1.0-1.5 | - | 1.0-2.0 | 0.05 | 0.05 | 3 |
3003+1.5%Zn+Zr | 0.5-1.0 | 0.7 | 0.05-0.20 | 1.0-1.6 | - | 1.0-2.0 | 0.05-0.2 | - | 4 |
3003+0.5%Cu | 0.6 | 0.7 | 0.30-0.70 | 1.0-1.5 | - | 0.10 | 0.05 | 0.1 | 5 |
3005 | 0.6 | 0.7 | 0.20-0.40 | 1.0-1.5 | 0.20-0.60 | 0.25 | - | 0.01 | 6 |
Core Material
Alloy | Si | Fe | Cu | Mn | Mg | Zn | Zr | Ti | code |
4343 | 6.8-8.2 | 0.8 | 0.25 | 0.1 | - | 0.2 | - | 0.05 | 1 |
4343+1%Zn | 6.8-8.2 | 0.8 | 0.25 | 0.1 | - | 0.5-1.5 | - | 0.05 | 2 |
4045 | 9.0-11.0 | 0.8 | 0.3 | 0.05 | - | 0.2 | - | 0.2 | 3 |
4045+1%Zn | 9.0-11.0 | 0.8 | 0.3 | 0.05 | - | 0.5-1.5 | - | 0.2 | 4 |
4004 | 9.0-10.5 | 0.8 | 0.25 | 0.1 | 1.0-2.0 | 0.2 | - | 0.2 | 5 |
2) Main mechanical of aluminum alloy for welding heat exchanger system
Alloy Code | temper | Tensile Strength Rm(MPa) | Yield Strength Rp0.2(Mpa) | Extend Ratio A50(%) |
TR-010,TR-020,TR-030,TR-040,TR-050,TR-110,TR-310,TR-116,TR-316,TR-111,TR-313,TR-121,TR-131,TR-141,TR-150,TR-151,TR-156 Etc. | O | 95-135* | ≥35* | ≥15* |
H14 | 140-185 | ≥125 | ≥1.5 | |
H24 | 140-185 | ≥125 | ≥3.0 | |
H16 | 185-225 | ≥160 | ≥1.0 | |
H18 | ≥185 | - | ≥0.5 | |
TR-166 Etc.tube material | H24 | 185-235 | ≥150 | ≥8 |
TR-116,TR-316 Etc.tube material | H14 | 140-185 | ≥125 | ≥3 |
H24 | 140-185 | ≥125 | ≥8 |
2.Our advantage of 3003 Brazed cold water plate for heat sink of electrical vehicle:
1. Since 2006, we have rich experience in this aluminum heat exchange industry in China;
2. Good reputation in household and industrial aluminum spare parts areas;
3. Design develop ability: We have design team to achieve your idea or give you suggestion
4. Price advantage.
5. Good experience and cooperation with big clients in the world;
6. With Certificate ISO9001-2008;
7. Sample order is acceptable
8. High performance cost ratio;
9. Fast delivery time and fast resolve problem attitude.
3.Terms and conditions:
1, Trade term: CIF / CFR / FOB/ EXW
2, Payment term: 30% before production+70% before shipment;
or 100% Irrevocable L/C at sight
Or we can further communicate with each other about this part.
3, Shipment time: Normally it is about 15-35 days.
Company Details
Business Type:
Manufacturer
Year Established:
2006
Total Annual:
100000000-150000000
Employee Number:
300~500
Ecer Certification:
Site Member
Trumony Group was established in 2007. With more than 10 years development , now Trumony is national high-tech enterprise . specialized in production of battery thermal management components , thermal interface material , aluminum brazing material and extruded profile. Trumony group hea... Trumony Group was established in 2007. With more than 10 years development , now Trumony is national high-tech enterprise . specialized in production of battery thermal management components , thermal interface material , aluminum brazing material and extruded profile. Trumony group hea...
Get in touch with us
Leave a Message, we will call you back quickly!