China factories

Chat Now Send Email
China factory - CHG International Limited

CHG International Limited

  • China,Beijing ,Beijing
  • Verified Supplier
  1. Home
  2. Products
  3. About Us
  4. Contact Us

Leave a Message

we will call you back quickly!

Submit Requirement
China Overhead Conveyor Powder Coating Line for Sheet Metal Parts 20000.00cm * 200
China Overhead Conveyor Powder Coating Line for Sheet Metal Parts 20000.00cm * 200

  1. China Overhead Conveyor Powder Coating Line for Sheet Metal Parts 20000.00cm * 200
  2. China Overhead Conveyor Powder Coating Line for Sheet Metal Parts 20000.00cm * 200
  3. China Overhead Conveyor Powder Coating Line for Sheet Metal Parts 20000.00cm * 200

Overhead Conveyor Powder Coating Line for Sheet Metal Parts 20000.00cm * 200

  1. MOQ: 1 set
  2. Price: 100,000-300,000 USD
  3. Get Latest Price
Payment Terms T/T, L/C, D/A, D/P, Western Union
Supply Ability 10/Year
Delivery Time Varies depending on the design
Packaging Details Varies depending on the design
Substrate Metal
Control Unit PLC
Techcnical Date Customized
Transport Package Customized
After-sales Service Guide Equipment Installation and Use
Shipping Cost Contact the supplier about freight and estimated delivery time.
Brand Name CHG
Model Number AC-05
Certification CE, ISO, CE, ISO
Place of Origin China

View Detail Information

Inquiry by Email Get Latest Price
Chat online Now Ask for best deal
  1. Product Details
  2. Company Details

Product Specification

Payment Terms T/T, L/C, D/A, D/P, Western Union Supply Ability 10/Year
Delivery Time Varies depending on the design Packaging Details Varies depending on the design
Substrate Metal Control Unit PLC
Techcnical Date Customized Transport Package Customized
After-sales Service Guide Equipment Installation and Use Shipping Cost Contact the supplier about freight and estimated delivery time.
Brand Name CHG Model Number AC-05
Certification CE, ISO, CE, ISO Place of Origin China
High Light Overhead ConveyorPowder Coating Line


Powder Coating Production Line for Electric Control Cabinet Chassis

This powder coating production line is specifically designed for coating sheet metal components of electric control cabinet chassis in a wide range of sizes and geometries. The system features a polypropylene (PP) spray booth, offering excellent chemical resistance and long service life.The coating process combines automatic electrostatic spraying with manual touch-up coating, ensuring uniform coverage across flat surfaces, edges, and complex structures. A monorail overhead conveyor system provides stable, continuous transportation of workpieces throughout the entire coating process.


Production Line Workflow

1. Hanger Stop & Elevator: PositioningThe hangers stop at the loading station while the elevator descends to assist operators with manual hanging of the sheet metal workpieces.

2. Pre-Spray Treatment: Workpieces move step-by-step through multiple pre-treatment stations. At each station, the parts stop for spraying and cleaning operations, ensuring thorough surface preparation before coating.

3. Moisture Drying: After pre-treatment, the workpieces accumulate in a drying zone where residual moisture is completely removed, preparing the surfaces for high-quality powder application.

4. Manual Spray Booth: The workpieces pause in the manual spray room, allowing operators to perform detailed coating on corners, recesses, and areas requiring special attention.

5. Automatic Spray Booth: In the automatic spray booth, workpieces move continuously at a controlled speed of 1.0–1.5 m/min. Automatic spraying is combined with supplementary manual spraying to achieve consistent, full-surface coverage.

6. Powder Solidification: Following spraying, the coated workpieces are accumulated in an inclined arrangement to ensure proper powder solidification, resulting in a durable and uniform coating layer.

7. Natural Cooling: The workpieces stop in the cooling area to undergo natural cooling, allowing the coating to stabilize and maintain its mechanical and aesthetic properties.

8. Transfer to Assembly Area: Once cooled, the finished parts are conveyed to the assembly area for subsequent operations such as component installation or packaging.

9. Elevator Down & Manual Unloading: Finally, the elevator descends to assist operators in manually removing the finished workpieces, preparing them for shipment or further processing.


Customized Equipment Powder Coating Line for Sheet Metal Parts with Monorail Conveyor Customized Equipment Powder Coating Line for Sheet Metal Parts with Monorail Conveyor

Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer,Exporter,Trading Company

  • Year Established:

    2007

  • Employee Number:

    70~80

  • Ecer Certification:

    Verified Supplier

     CHG International Limited was established in 2007. With nearly 20 years of experience, our company and products have gained acceptance from a large number of customers.   Our business covers the import and export of machinery and equipment, automation e...      CHG International Limited was established in 2007. With nearly 20 years of experience, our company and products have gained acceptance from a large number of customers.   Our business covers the import and export of machinery and equipment, automation e...

+ Read More

Get in touch with us

  • Reach Us
  • CHG International Limited
  • Building B, No.5 Jinxing West Road, Daxing District, Beijing, China
  • https://www.chgcoating.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement