China factories

China factory - FORPRO FORMWORK TECHNOLOGY (SHANGHAI) CO., LTD.

FORPRO FORMWORK TECHNOLOGY (SHANGHAI) CO., LTD.

  • China
  • Active Member

Leave a Message

we will call you back quickly!

Submit Requirement
China Forpro Climbing Formwork System Main Platform 2.4 Wide For Safe Operation
China Forpro Climbing Formwork System Main Platform 2.4 Wide For Safe Operation

  1. China Forpro Climbing Formwork System Main Platform 2.4 Wide For Safe Operation

Forpro Climbing Formwork System Main Platform 2.4 Wide For Safe Operation

  1. MOQ: 20 pcs
  2. Price:
  3. Get Latest Price
Payment Terms L/C, T/T
Supply Ability 1000 Pcs / year
Delivery Time 30-45 work days
Packaging Details Pallet
Material Q235 Steel, timber beam,Plywood
Color Blue, yellow
Size 50KN per bracket
Application High verticle structure, shiplock, pylon legs, high piers
Product name climbing formwork CF240 system
Type Wall Formwork, Steel formwork,Column formwork,Climbing formwork
Brand Name Forpro
Model Number Modular climbing formwork system
Certification ISO and CE
Place of Origin shanghai

View Detail Information

Contact Now Ask for best deal
Get Latest Price Request a quote
  1. Product Details
  2. Company Details

Product Specification

Payment Terms L/C, T/T Supply Ability 1000 Pcs / year
Delivery Time 30-45 work days Packaging Details Pallet
Material Q235 Steel, timber beam,Plywood Color Blue, yellow
Size 50KN per bracket Application High verticle structure, shiplock, pylon legs, high piers
Product name climbing formwork CF240 system Type Wall Formwork, Steel formwork,Column formwork,Climbing formwork
Brand Name Forpro Model Number Modular climbing formwork system
Certification ISO and CE Place of Origin shanghai
High Light crane climbing formworkclimbing scaffolding system

Climbing Formwork System for Universal Application to Construct High-rise Building

 

Description

As a high load bearing capacity, climbing formwork can be widely utilized in various projects as high piers, abutment, elevator testing tower and high-rise structures. it is designed for precise and convienient operation for all high-rise projects, 2.40m wide platform in comibination movable formwork unit ensure speedy and safe formwork operation. Multi level platforms  provide orient work space for formwork operation, concrete pouring,reinforcement installation and concrete surface repairing. The whole system is anchored in the stucture during the whole working process, the modular elements can be adjusted to fit any angle of wall inclination.

Elements
• Movable formwork unit could be Timber beam large size formwork or steel frame formwork or alumi formwork

• Climbing brackets incude horzontal profile and verticel profile

• Panel travelling unit can trave formwork 650mm away from concrete

• Anchoring system D20.0 with high loadability

 

Features
• Main Platform is 2.40 wide for safe operation

• Formwork 650mm retraction space for easy cleaning 

• 3 or 4 levels of platform level can be adjusted to meet structure inclination up to 150

• High capacity of 50KN per bracket and bracket is safely anchored on concrete structure with high strength anchor parts.

 

Climbing Formwork Installation Process

 

Applications Field

 

Forpro Service

Provide support in every stage of projects
1.Provide cosult when client take part in projects bid invitation.
2.Provide optimized formwork tender solution to assitant client to win the project.

3.Developing formwork design, refining initial plan, and exploring relation limit between supply&demand.

4.Start to design the formwork detailedly according to the winning bidding.
5.Provide economic formwork solution package and provide continous on-site support service.

 

Factory

 

FAQ

Q 1, Are you a factory or a trading company?
Yes,We are professional factory.

Q 2.Do you have strong techinicans teams?
Yes,We have 23 technical engineers with more than 20 years experience

Q 3. Do you accept OEM services?
Yes, we could make the customized products according to your drawings.

Q 4. What is your production capacity?
3000Tons per month.

Q 5. Do you have test report?
Yes, we have done many test by TUV Rheinland(Shanghai) Co.,Ltd.

Q 6. How long is your delivery.
Usually 20-25days after deposit confirmed.

Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer,Trading Company,Seller,Other

  • Year Established:

    2015

  • Total Annual:

    11000000USD-15000000

  • Employee Number:

    85~100

  • Ecer Certification:

    Active Member

  ForPro Formwork Technology (Shanghai) Co., Ltd. is a professional formwork technology company focusing on formwork system research and development, design and production. Our own brand "ForPro", derived from Formwork • Profession, represents the our development philosophy: f...   ForPro Formwork Technology (Shanghai) Co., Ltd. is a professional formwork technology company focusing on formwork system research and development, design and production. Our own brand "ForPro", derived from Formwork • Profession, represents the our development philosophy: f...

+ Read More

Get in touch with us

  • Reach Us
  • FORPRO FORMWORK TECHNOLOGY (SHANGHAI) CO., LTD.
  • https://www.concrete-formworksystems.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement