| Payment Terms | L/C, T/T |
| Supply Ability | 1000 Piece / year |
| Delivery Time | 30-45 work days |
| Packaging Details | Pallet |
| Material | Q235 Steel, timber beam,Plywood |
| Color | Hot-galvanize, yellow,brown |
| Size | Width 2400mm |
| Application | High rise buildings, pylons,piers |
| Product name | Climbing formwork |
| Type | Wall Formwork, Steel formwork,Column formwork,Climbing formwork |
| Brand Name | CF240 |
| Model Number | Crane lifted formwork |
| Certification | ISO and CE |
| Place of Origin | shanghai |
View Detail Information
Explore similar products
High Safety Slip Climbing Formwork System For High Silo Continuous Construction
High Safety Sliding Climbing Formwork System With Short Construction Period
Non Stop Slip Form Formwork System For Silo And Cooling Tower And Chimney
High Efficient F16 Cantilever Formwork System For For Large Area Concrete
Product Specification
| Payment Terms | L/C, T/T | Supply Ability | 1000 Piece / year |
| Delivery Time | 30-45 work days | Packaging Details | Pallet |
| Material | Q235 Steel, timber beam,Plywood | Color | Hot-galvanize, yellow,brown |
| Size | Width 2400mm | Application | High rise buildings, pylons,piers |
| Product name | Climbing formwork | Type | Wall Formwork, Steel formwork,Column formwork,Climbing formwork |
| Brand Name | CF240 | Model Number | Crane lifted formwork |
| Certification | ISO and CE | Place of Origin | shanghai |
| High Light | crane climbing formwork ,self climbing scaffold system | ||
Crane lifted Climbing Formwork System for Core Wall and Bridge Concrete
Description
Climbing Formwork CF240 is a crane lifted climbing formwork. It is utilised in various sturctures as high-rise build, pylons,piers and towers etc. It provides multi level platform for formwork operation, concrete pouring,reinforcement installation and concrete surface repairing. The whole system is anchored in the stucture during the whole working process. All jobs on the climbing brackets is fast, easy and safe.
Elements
• Large area formwork panel
• Climbing brackets CF240
• Panel travelling unit
• Anchoring system D20.0
Features
• Platform width: 2.40m
• Formwork panel can be move back 70cm from the concrete wall
• Platform level can be adjusted to meet structure inclination up to 150
• CF240 climbing formwork is safely anchored on concrete structure the whole working stage.
• Only 1 anchor will be losted each casting step for one climbing bracket
The Concrete Pouring Process
![]()
Applications Field
![]()
![]()
Company Details
Business Type:
Manufacturer,Trading Company,Seller,Other
Year Established:
2015
Total Annual:
11000000USD-15000000
Employee Number:
85~100
Ecer Certification:
Active Member
ForPro Formwork Technology (Shanghai) Co., Ltd. is a professional formwork technology company focusing on formwork system research and development, design and production. Our own brand "ForPro", derived from Formwork • Profession, represents the our development philosophy: f... ForPro Formwork Technology (Shanghai) Co., Ltd. is a professional formwork technology company focusing on formwork system research and development, design and production. Our own brand "ForPro", derived from Formwork • Profession, represents the our development philosophy: f...
Get in touch with us
Leave a Message, we will call you back quickly!