| Delivery Time | After deposit 15-20 days |
| Payment Terms | T/T L/C (bank transfer) |
| Supply Ability | 100sets/day |
| Packaging Details | In bulk,pallet,bundle or according the customer demand |
| Model Number | shaft platform formwork |
| Place of Origin | Beijing, China (Mainland) |
| Brand Name | ZULIN |
| Certification | ISO9001-2008 |
View Detail Information
Explore similar products
Single-side Climbing Formwork with adjusted horizontally or vertically
DXB180 / DXB240 Single-side adjusted Climbing Formwork used in guy anchor etc
Auto Climbing Formwork (CB-240) used in pouring concrete of piers, high
Single-side adjusted Climbing Formwork (DXB-180 & DXB-240) used in guy anchor
Product Specification
| Delivery Time | After deposit 15-20 days | Payment Terms | T/T L/C (bank transfer) |
| Supply Ability | 100sets/day | Packaging Details | In bulk,pallet,bundle or according the customer demand |
| Model Number | shaft platform formwork | Place of Origin | Beijing, China (Mainland) |
| Brand Name | ZULIN | Certification | ISO9001-2008 |
| High Light | automatic climbing formwork , foundation formwork | ||
Shaft platform Climbing Formwork system with adjustabe length
Descrition:
The shaft platform is mainly used in concrete pouring of elevator well, equipment well, stair well
of high-rise buildings and so on. Concrete lateral pressure is entirely supported by wall-through tie-rods,
and no other reinforcement is required. The construction is easy, rapid and economical.
Structure sketch
The shaft platform is mainly made up of platform board, timber beam,beam clamp,shaft beam and
anchor system.The sketch is shown below :
L is the length of timber beam. W varies from 1.45m to 5.9m. The shaft beam is in a variety of
specifications to fit the shaft's dimension.
Shaft beam structure sketch
The lift sketches
The formwork and the shaft platform are lifted respectively, first the formwork and then the platform.
When the formwork is in position, it is necessary to keep the pawl for shaft beam tightly locked with
the tensile bolt.The sketches are shown below:
|
|
|
|
Adjustable scope
In order to provide enough movable space for the lifting of platform, some distance from the platform
edge to the concrete surface should be kept.
Work with climbing formwork
Shaft platform must work together with other formwork systems in construction. The sketch below
shows how shaft platform works with Climbing Formwork CB-240.
|
|
|
Characteristics
1.The system has a steady structure and connecting components with a high level of universality
and standardization. It is also easy to operate.
2. The construction loads are supported by anchor system and therefore scaffolding is not needed.
It is suitable for corewall concreting of high-rise buildings.
3. Various specifications as well as length adjustability can fit in with various dimensions of the core tube.
Company Details
Business Type:
Manufacturer,Distributor/Wholesaler,Exporter,Trading Company,Seller
Year Established:
2003
Total Annual:
>50 Million
Employee Number:
500~1000
Ecer Certification:
Verified Supplier
As a professional formwork company, Beijing Zulin Formwork & Scaffolding Co., Ltd., dedicates to the design, manufacture and supply of formwork and scaffolding in fields of Civil Engineering, Bridge-Road Projects,Hydroelectricity & Dam projects. We have advanced productio... As a professional formwork company, Beijing Zulin Formwork & Scaffolding Co., Ltd., dedicates to the design, manufacture and supply of formwork and scaffolding in fields of Civil Engineering, Bridge-Road Projects,Hydroelectricity & Dam projects. We have advanced productio...
Get in touch with us
Leave a Message, we will call you back quickly!