| Payment Terms | 30%TT, Balance against copy of BL |
| Supply Ability | 400 to 500 tons per month |
| Delivery Time | 14 to 21 days after deposit |
| Packaging Details | In bundle or pallets, or by customer demands |
| Raw Material | Steel tube,Timber beam, Plywood |
| Supporting system | Floor prop |
| Assemble and disassemble | Operated once, reusable in different sections, Integral movement |
| Application | Concrete construciton-Cast in place slab |
| Size | Modular size or Project-specific design |
| Floor height | Less than 4.5m |
| Brand Name | ZNLS |
| Model Number | S-TP |
| Place of Origin | China |
View Detail Information
Explore similar products
Aluminum Truss Flying Table Formwork For Slab Light But Strong S-TF
Economical Slab Formwork Systems Adjusted Table Width / Length / Height
Lightweight Aluminum Trusses Table Formwork , Permanent Formwork For Concrete
Convenient Beam Slab System High Lift Forklift , Steel Formwork For Concrete
Product Specification
| Payment Terms | 30%TT, Balance against copy of BL | Supply Ability | 400 to 500 tons per month |
| Delivery Time | 14 to 21 days after deposit | Packaging Details | In bundle or pallets, or by customer demands |
| Raw Material | Steel tube,Timber beam, Plywood | Supporting system | Floor prop |
| Assemble and disassemble | Operated once, reusable in different sections, Integral movement | Application | Concrete construciton-Cast in place slab |
| Size | Modular size or Project-specific design | Floor height | Less than 4.5m |
| Brand Name | ZNLS | Model Number | S-TP |
| Place of Origin | China | ||
| High Light | Load Bearing Scaffolding ,Table Formwork System | ||
Table formwork - Prop-2 - The beamless handset system for speed on site
Overview
Table formwork-prop is easy and practical to set up and can be shifted and adapted very quickly. This makes them a cost-effective and efficient way of carrying out large-area slab projects.Table formwork-floor prop is the is the idea way to get the job done quickly and cost-effectively. Specially for larger-scale, open design form of construction. Table formwork-prop is made of floor prop, timber beam, plywood and etc.It can be repositioning both vertically and horizontally as a unit.
System introduction
1. Lower labour costs: Matched shifting devices can save much labor cost and crane time.
2. Minimised close-out costs: Because of its outstanding system attributes.
3. Perfect adaptability
Value-added Service
ZNLS will provide relating technical service including formwork & scaffolding proposal drawing, material list, shop drawing, calculation sheet, loading capacity analysis and assembly instruction on site and other after-sale service. Moreover, cargo transport arrangement and tracking, relating import and export documents will be supplied as customs’ requirements.
![]()
Company Details
Business Type:
Manufacturer,Importer,Exporter,Trading Company
Year Established:
2014
Total Annual:
10000000-12000000
Employee Number:
100~150
Ecer Certification:
Active Member
Cost-efficiency, safety, simple handling and high-quality concrete are the key elements of any modern construction site worldwide. Meanwhile, taller and taller buildings, more and more complex structures and more difficult layout, these are typical architecture of our times. For all of requirements ... Cost-efficiency, safety, simple handling and high-quality concrete are the key elements of any modern construction site worldwide. Meanwhile, taller and taller buildings, more and more complex structures and more difficult layout, these are typical architecture of our times. For all of requirements ...
Get in touch with us
Leave a Message, we will call you back quickly!