| Payment Terms | 30%TT, Balance against copy of BL |
| Supply Ability | 400 to 500 tons per month |
| Delivery Time | 14 to 21 days after deposit |
| Packaging Details | In bundle or pallets, or by customer demands |
| Raw Material | Steel |
| Surface treatment | Powder coated |
| Lifting method | Self Climbing , Hydraulic Drive |
| Load capacity | 5 tons |
| Integrated platform no. | 4 platforms for independent work |
| Climbing rail | Different length available |
| Brand Name | ZNLS |
| Model Number | PF-AC50 |
| Place of Origin | China |
View Detail Information
Explore similar products
Multi Function Hydraulic Jump Form Shuttering System OEM / ODM Available
High Safety Automatic Climbing System For Vertical / Arced Wall Easy Operation
Advanced Design Automatic Climbing System For High Building AC50-2
Fully Automatic Climbing Wall , Jump Form System Construction PF-AC50
Product Specification
| Payment Terms | 30%TT, Balance against copy of BL | Supply Ability | 400 to 500 tons per month |
| Delivery Time | 14 to 21 days after deposit | Packaging Details | In bundle or pallets, or by customer demands |
| Raw Material | Steel | Surface treatment | Powder coated |
| Lifting method | Self Climbing , Hydraulic Drive | Load capacity | 5 tons |
| Integrated platform no. | 4 platforms for independent work | Climbing rail | Different length available |
| Brand Name | ZNLS | Model Number | PF-AC50 |
| Place of Origin | China | ||
| High Light | Auto Climbing Formwork System ,Self Climbing Formwork System | ||
AC50-7 Automatic climbing formwork - A special-type of formwork for vertical concrete structures
Overview
AC50-7 Automatic climbing formwork is a self-climbing formwork system. Its motive power comes from its hydraulic climbing system, and thus it does not need any other cranes.
The AC50-7 Automatic climbing formwork can be operated conveniently, and easy to work high above ground with a very high level of safety as well as saving working time.
The AC50-7 Automatic climbing formwork is equipped with working platform (multilayer), this result in sufficient space being created. This system can be used in the construction of high tower and core share wall for saving time and crane cost.
2 . Roll-back carriages for works between formwork panels.
3 . High load-bearing capacity. Large formwork assemblies can be lifted easily.
Value-added Service
ZNLS will provide relating technical service including formwork & scaffolding proposal drawing, material list, shop drawing, calculation sheet, loading capacity analysis and assembly instruction on site and other after-sale service. Moreover, cargo transport arrangement and tracking, relating import and export documents will be supplied as customs’ requirements.
![]()
Company Details
Business Type:
Manufacturer,Importer,Exporter,Trading Company
Year Established:
2014
Total Annual:
10000000-12000000
Employee Number:
100~150
Ecer Certification:
Active Member
Cost-efficiency, safety, simple handling and high-quality concrete are the key elements of any modern construction site worldwide. Meanwhile, taller and taller buildings, more and more complex structures and more difficult layout, these are typical architecture of our times. For all of requirements ... Cost-efficiency, safety, simple handling and high-quality concrete are the key elements of any modern construction site worldwide. Meanwhile, taller and taller buildings, more and more complex structures and more difficult layout, these are typical architecture of our times. For all of requirements ...
Get in touch with us
Leave a Message, we will call you back quickly!