| Payment Terms | 30%TT, Balance against copy of BL |
| Supply Ability | 400 to 500 tons per month |
| Delivery Time | 14 to 21 days after deposit |
| Packaging Details | In bundle or pallets, or by customer demands |
| Slab Formwork Solution | Table Formwork-Prop |
| Column Formwork Solution | Flexible Column Formwork |
| Wall Formwork Solution | Flexible Wall Formwork |
| Working Platform Solution | J240 Jumped Climbing Formwork |
| Reusable | Yes |
| Sale/Rent | For sale |
| Brand Name | ZNLS |
| Model Number | S-TP , C-H20 , W-H20 , PF-J240 |
| Place of Origin | China |
View Detail Information
Explore similar products
Engineered Formwork System , Climbing Scaffolding System Unique Design
Various Size Formwork Support Systems Jump Form System S-TP / W-H20 / PF-J240
Jump Form Formwork System Scaffolding And Formwork For Concrete Walls
Safety Formwork Scaffolding Systems Flexible Concrete Formwork High Load
Product Specification
| Payment Terms | 30%TT, Balance against copy of BL | Supply Ability | 400 to 500 tons per month |
| Delivery Time | 14 to 21 days after deposit | Packaging Details | In bundle or pallets, or by customer demands |
| Slab Formwork Solution | Table Formwork-Prop | Column Formwork Solution | Flexible Column Formwork |
| Wall Formwork Solution | Flexible Wall Formwork | Working Platform Solution | J240 Jumped Climbing Formwork |
| Reusable | Yes | Sale/Rent | For sale |
| Brand Name | ZNLS | Model Number | S-TP , C-H20 , W-H20 , PF-J240 |
| Place of Origin | China | ||
| High Light | Building Construction Scaffolding ,Construction Form Work | ||
System slab formwork , column formwork , wall formwork , climbing system for tower project in Abu Dhabi
| Project | Sector 1, Area 1, Al Reem Island |
| Contractor/Client | Beijing Construction Engineering Group Co.-ABU DHABI |
| Location | Abu Dhabi, U.A.E |
| Table Formwork-Prop | The high-capacity system components are designed for optimum interoperability so that lots of time and labour costs can be saved. |
| Flexible Column Formwork | This system can be exactly adapted to the shape and concrete pressure by adjusting the direction and distance between girders. |
| Flexible Wall Formwork | The wall forms are used for almost any kind of wall construction. It goes well with the straight walls or walls with corners and projections. |
| J240 Jumped Climbing Formwork | The system's specially co-ordinated components make it ideal for construction projects with vertical walls. Exact coordination of formwork equipment made for high numberof re-use cycles, low formwork quantities. |
Value-added Service:
ZNLS will provide relating technical service including formwork & scaffolding proposal drawing, material list, shop drawing, calculation sheet, loading capacity analysis and assembly instruction on site and other after-sale service. Moreover, cargo transport arrangement and tracking, relating import and export documents will be supplied as customs’ requirements.
![]()
Company Details
Business Type:
Manufacturer,Importer,Exporter,Trading Company
Year Established:
2014
Total Annual:
10000000-12000000
Employee Number:
100~150
Ecer Certification:
Active Member
Cost-efficiency, safety, simple handling and high-quality concrete are the key elements of any modern construction site worldwide. Meanwhile, taller and taller buildings, more and more complex structures and more difficult layout, these are typical architecture of our times. For all of requirements ... Cost-efficiency, safety, simple handling and high-quality concrete are the key elements of any modern construction site worldwide. Meanwhile, taller and taller buildings, more and more complex structures and more difficult layout, these are typical architecture of our times. For all of requirements ...
Get in touch with us
Leave a Message, we will call you back quickly!