| Payment Terms | 30%TT, Balance against copy of BL |
| Supply Ability | 400 to 500 tons per month |
| Delivery Time | 14 to 21 days after deposit |
| Packaging Details | In bundle or pallets, or by customer demands |
| Slab Formwork Solution | Table Formwork-Prop |
| Wall Formwork Solution | Flexible Wall Formwork |
| Working Platform Solution | J240 Jumped Climbing Formwork |
| Delivery condition | SKD, Complete assemble on site |
| Reusable | Yes |
| Sale/Rent | For sale |
| Brand Name | ZNLS |
| Model Number | S-TP , W-H20 , PF-J240 |
| Place of Origin | China |
View Detail Information
Explore similar products
Engineered Formwork System , Climbing Scaffolding System Unique Design
Jump Form Formwork System Scaffolding And Formwork For Concrete Walls
Safety Formwork Scaffolding Systems Flexible Concrete Formwork High Load
Customized Formwork Scaffolding Systems Self Climbing Formwork System
Product Specification
| Payment Terms | 30%TT, Balance against copy of BL | Supply Ability | 400 to 500 tons per month |
| Delivery Time | 14 to 21 days after deposit | Packaging Details | In bundle or pallets, or by customer demands |
| Slab Formwork Solution | Table Formwork-Prop | Wall Formwork Solution | Flexible Wall Formwork |
| Working Platform Solution | J240 Jumped Climbing Formwork | Delivery condition | SKD, Complete assemble on site |
| Reusable | Yes | Sale/Rent | For sale |
| Brand Name | ZNLS | Model Number | S-TP , W-H20 , PF-J240 |
| Place of Origin | China | ||
| High Light | Engineered Formwork System ,Construction Form Work | ||
System slab formwork , wall formwork , climbing system for tower project in Dubai
| Project | Beach Tower |
| Contractor/Client | Commodore Qatar Contracting Co.LLC. |
| Location | Dubai,UAE |
| Table Formwork-Prop | Table formwork-Prop kept work moving ahead sweiftly throughout this project |
| Flexible Wall Formwork | ZNLS Flexible wall formwork consists of less different system components, and is ideal for forming large areas economically. |
| J240 Jumped Climbing Formwork | J240 stands out for its high load bearing capacity and maximun safety. Its integrated platforms are strong enough for temporary material storage and moving loads with crane. |
Value-added Service:
ZNLS will provide relating technical service including formwork & scaffolding proposal drawing, material list, shop drawing, calculation sheet, loading capacity analysis and assembly instruction on site and other after-sale service. Moreover, cargo transport arrangement and tracking, relating import and export documents will be supplied as customs’ requirements.![]()
Company Details
Business Type:
Manufacturer,Importer,Exporter,Trading Company
Year Established:
2014
Total Annual:
10000000-12000000
Employee Number:
100~150
Ecer Certification:
Active Member
Cost-efficiency, safety, simple handling and high-quality concrete are the key elements of any modern construction site worldwide. Meanwhile, taller and taller buildings, more and more complex structures and more difficult layout, these are typical architecture of our times. For all of requirements ... Cost-efficiency, safety, simple handling and high-quality concrete are the key elements of any modern construction site worldwide. Meanwhile, taller and taller buildings, more and more complex structures and more difficult layout, these are typical architecture of our times. For all of requirements ...
Get in touch with us
Leave a Message, we will call you back quickly!