| Payment Terms | 30%TT, Balance against copy of BL |
| Supply Ability | 400 to 500 tons per month |
| Delivery Time | 14 to 21 days after deposit |
| Packaging Details | In bundle or pallets, or by customer demands |
| Material | Steel |
| Price: | Negotiation |
| Delivery Time: | After deposit 15-20 days |
| Lifting type | Rack and pinion mechanism |
| Bearing capacity | 1500kg |
| Max. lifting height | 690mm |
| Brand Name | ZNLS |
| Model Number | SA-TRS |
| Certification | ISO9001-2008 |
| Place of Origin | China |
View Detail Information
Explore similar products
Table Formwork System / Formwork For Beams Columns And Slabs Lower Labour Costs
Customized Slab Formwork Systems , Beam Slab System For Concrete Construciton
Different Color Slab Formwork Systems Channel Steel / Timber Beam / Plywood
Professional Raft Slab Formwork , Waffle Slab Formwork Easy Assembly
Product Specification
| Payment Terms | 30%TT, Balance against copy of BL | Supply Ability | 400 to 500 tons per month |
| Delivery Time | 14 to 21 days after deposit | Packaging Details | In bundle or pallets, or by customer demands |
| Material | Steel | Price: | Negotiation |
| Delivery Time: | After deposit 15-20 days | Lifting type | Rack and pinion mechanism |
| Bearing capacity | 1500kg | Max. lifting height | 690mm |
| Brand Name | ZNLS | Model Number | SA-TRS |
| Certification | ISO9001-2008 | Place of Origin | China |
| High Light | Load Bearing Scaffolding ,Table Formwork System | ||
Detailed Product Description
suspended slab formwork
slab formwork
concrete slab formwork
Safe , Fast Operation by Using Shifting Trolley for Table Formwork in Slab Construction
Description:
1. Brief introduction
Shifting trolley is special shifting equipment for table formwork, as we know, in slab construction, we usually divide several construction sections for money saved, that makes turnover of slab formwork be very necessary. The speed of moving of table formwork is accelerated by means of shifting trolley, that is why we designed this smart tool.![]()
2. Competitive advantage
①.The construction efficiency is improved.
As the picture above shown, the table formwork will be carried by trolley safely, quickly and easily; usually, the shifting of each block of table form will be finished only by one labor and one trolley, the speed of construction is accelerated and the engineer cost is lowered.
②.Omni-directional wheels make moving easier.
The direction will be controlled by labor in the moving process of trolley, there are Omni-directional wheels to make it easily achieved.
③.It is an auto-lifting car.
The trolley will go up and down by its own device. It is very easy to operation just by controlling control panel which marked “UP” and “DOWN”.
Company Details
Business Type:
Manufacturer,Importer,Exporter,Trading Company
Year Established:
2014
Total Annual:
10000000-12000000
Employee Number:
100~150
Ecer Certification:
Active Member
Cost-efficiency, safety, simple handling and high-quality concrete are the key elements of any modern construction site worldwide. Meanwhile, taller and taller buildings, more and more complex structures and more difficult layout, these are typical architecture of our times. For all of requirements ... Cost-efficiency, safety, simple handling and high-quality concrete are the key elements of any modern construction site worldwide. Meanwhile, taller and taller buildings, more and more complex structures and more difficult layout, these are typical architecture of our times. For all of requirements ...
Get in touch with us
Leave a Message, we will call you back quickly!