China factories

China factory - ZNLS ENGINEERING CO., LTD.

ZNLS ENGINEERING CO., LTD.

  • China,Beijing ,Beijing
  • Active Member

Leave a Message

we will call you back quickly!

Submit Requirement
China Construction Suspended / Concrete Slab Formwork Systems Shifting Trolley
China Construction Suspended / Concrete Slab Formwork Systems Shifting Trolley

  1. China Construction Suspended / Concrete Slab Formwork Systems Shifting Trolley
  2. China Construction Suspended / Concrete Slab Formwork Systems Shifting Trolley

Construction Suspended / Concrete Slab Formwork Systems Shifting Trolley

  1. MOQ: 25 tons
  2. Price: Negotiation
  3. Get Latest Price
Payment Terms 30%TT, Balance against copy of BL
Supply Ability 400 to 500 tons per month
Delivery Time 14 to 21 days after deposit
Packaging Details In bundle or pallets, or by customer demands
Material Steel
Price: Negotiation
Delivery Time: After deposit 15-20 days
Lifting type Rack and pinion mechanism
Bearing capacity 1500kg
Max. lifting height 690mm
Brand Name ZNLS
Model Number SA-TRS
Certification ISO9001-2008
Place of Origin China

View Detail Information

Contact Now Ask for best deal
Get Latest Price Request a quote
  1. Product Details
  2. Company Details

Product Specification

Payment Terms 30%TT, Balance against copy of BL Supply Ability 400 to 500 tons per month
Delivery Time 14 to 21 days after deposit Packaging Details In bundle or pallets, or by customer demands
Material Steel Price: Negotiation
Delivery Time: After deposit 15-20 days Lifting type Rack and pinion mechanism
Bearing capacity 1500kg Max. lifting height 690mm
Brand Name ZNLS Model Number SA-TRS
Certification ISO9001-2008 Place of Origin China
High Light Load Bearing ScaffoldingTable Formwork System

Detailed Product Description


suspended slab formwork

slab formwork

concrete slab formwork

 

Safe , Fast Operation by Using Shifting Trolley for Table Formwork in Slab Construction

Description:

1. Brief introduction

Shifting trolley is special shifting equipment for table formwork, as we know, in slab construction, we usually divide several construction sections for money saved, that makes turnover of slab formwork be very necessary. The speed of moving of table formwork is accelerated by means of shifting trolley, that is why we designed this smart tool.

 

2. Competitive advantage

①.The construction efficiency is improved.

 

As the picture above shown, the table formwork will be carried by trolley safely, quickly and easily; usually, the shifting of each block of table form will be finished only by one labor and one trolley, the speed of construction is accelerated and the engineer cost is lowered.

②.Omni-directional wheels make moving easier.

The direction will be controlled by labor in the moving process of trolley, there are Omni-directional wheels to make it easily achieved.

③.It is an auto-lifting car.

The trolley will go up and down by its own device. It is very easy to operation just by controlling control panel which marked “UP” and “DOWN”.

 

 

Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer,Importer,Exporter,Trading Company

  • Year Established:

    2014

  • Total Annual:

    10000000-12000000

  • Employee Number:

    100~150

  • Ecer Certification:

    Active Member

Cost-efficiency, safety, simple handling and high-quality concrete are the key elements of any modern construction site worldwide. Meanwhile, taller and taller buildings, more and more complex structures and more difficult layout, these are typical architecture of our times. For all of requirements ... Cost-efficiency, safety, simple handling and high-quality concrete are the key elements of any modern construction site worldwide. Meanwhile, taller and taller buildings, more and more complex structures and more difficult layout, these are typical architecture of our times. For all of requirements ...

+ Read More

Get in touch with us

  • Reach Us
  • ZNLS ENGINEERING CO., LTD.
  • Building 3, CCT Center, Chaoyang District, Beijing, China
  • http://www.formworkscaffoldingsystems.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement