| Payment Terms | T/T,Western Union,D/P,D/A,L/C |
| Operating Environment | Industrial |
| Material | High-grade steel and heat-resistant alloys |
| Capacity | Customized |
| Safety Features | Overheat protection, emergency shutdown |
| Type | Industrial Equipment |
| Maintenance | Low maintenance cost |
| Controlsystem | Automated PLC control or manual operation |
| Brand Name | Hongxin |
| Place of Origin | China |
View Detail Information
Explore similar products
Product Specification
| Payment Terms | T/T,Western Union,D/P,D/A,L/C | Operating Environment | Industrial |
| Material | High-grade steel and heat-resistant alloys | Capacity | Customized |
| Safety Features | Overheat protection, emergency shutdown | Type | Industrial Equipment |
| Maintenance | Low maintenance cost | Controlsystem | Automated PLC control or manual operation |
| Brand Name | Hongxin | Place of Origin | China |
| High Light | Submerged Arc Furnace Casting System ,Hot Metal Ladle Casting System ,Ingot Machine Casting System | ||
| Parameter | Requirement |
|---|---|
| Mold Preheating Temperature | ≥150℃ |
| Mold Material | Mainly cast iron, aluminum alloy cavity can be anodized |
| Coating Requirement | Spray refractory coating to adjust cooling rate |
| Casting Weight Limitation | Not too large |
| Casting Shape | Mainly simple shapes |
| Parameter | Range |
|---|---|
| Annual Production Capacity | Slab: 2-2.5 million t/year Bloom: 0.8-1 million t/year Billet: 0.6-0.8 million t/year |
| Operating Rate | 80-90% |
| Casting Speed | Slab: 1.2-1.8 m/min (max 3.0) Billet: 2.5-3.5 m/min |
| Sequence Casting | Average 4-6 heats, max 329 heats |
| Radius | 11-17 m (max 18.5 m) |
| Parameter | Typical Range |
|---|---|
| Ingot Weight | 8-20 t |
| Height/Width Ratio | 2.5-3.5 |
| Taper | 0.8-4.2% |
| Wall Thickness | 50-160 mm |
| Mold/Ingot Weight Ratio | 0.8-1.2 |
| Corner Radius | 8-15% of diameter |
Taper Calculation Formula:
Square Section: Taper = (D₁ - D₂) / H × 100%
Round Section: Taper = (R₁ - R₂) / H × 100%
D₁ and D₂ are the lengths of the top and bottom edges, R₁ and R₂ are the radii of the top and bottom edges, and H is the height of the ingot
| Project | Requirement |
|---|---|
| Preheating Before Use | 80-120℃ |
| Hoisting Requirements | Must hang four lifting lugs, return flat after turning |
| Placement Requirements | Hang double slings, align with nozzle brick and lower slowly |
| Mold Standing | Ensure ground level, 4" and 6" molds cannot stand alone |
| Damage Repair | Welding patching or mixed refractory repair |
| Scrap Standard | Promptly scrap when unrepairable |
Company Details
Business Type:
Manufacturer,Distributor/Wholesaler,Exporter,Seller
Year Established:
2007
Total Annual:
32000000-35000000
Employee Number:
140~150
Ecer Certification:
Verified Supplier
Xi'an Hongxin Arc Furnace Co., Ltd. is a high-tech enterprise specializing in the research and development, manufacturing, installation, commissioning, and technical services of ferroalloy submerged arc furnace equipment and environmental dust removal equipment. The company was founded in... Xi'an Hongxin Arc Furnace Co., Ltd. is a high-tech enterprise specializing in the research and development, manufacturing, installation, commissioning, and technical services of ferroalloy submerged arc furnace equipment and environmental dust removal equipment. The company was founded in...
Get in touch with us
Leave a Message, we will call you back quickly!