| Operating Temperature | - |
| Lifetime | - |
| Capacitance | 2.7uF |
| Height - Seated (Max) | 11mm |
| Pin Spacing | 2mm |
| Voltage Rating | 50V |
| Diameter | 5mm |
| Equivalent Series Resistance(ESR) | - |
| Tolerance | ±20% |
| Ripple Current | 26mA@120Hz |
| Description | 2.7uF 50V Aluminum Electrolytic Capacitors Through Hole,D5xL11mm |
| Mfr. Part # | NP2751HMC112RB |
| Package | Through Hole,D5xL11mm |
| Model Number | NP2751HMC112RB |
View Detail Information
Explore similar products
High Temperature Aluminum Electrolytic Capacitor Chengx KM228M010G17RR0VH2FP0
V chip Aluminum Electrolytic Capacitors Chengx RVT1E221M0810 Rated 105C with
Aluminum Electrolytic Capacitor Guangdong TOPAZ Elec Tech ECLJ0612270M080P00 for
aluminum electrolytic capacitor HRK 400V10uF CD110 with rated voltage 400 volts
Product Specification
| Operating Temperature | - | Lifetime | - |
| Capacitance | 2.7uF | Height - Seated (Max) | 11mm |
| Pin Spacing | 2mm | Voltage Rating | 50V |
| Diameter | 5mm | Equivalent Series Resistance(ESR) | - |
| Tolerance | ±20% | Ripple Current | 26mA@120Hz |
| Description | 2.7uF 50V Aluminum Electrolytic Capacitors Through Hole,D5xL11mm | Mfr. Part # | NP2751HMC112RB |
| Package | Through Hole,D5xL11mm | Model Number | NP2751HMC112RB |
The XUNDA NP series are non-polar aluminum electrolytic capacitors designed with single-ended leads. They offer stable and reliable performance with low loss, making them suitable for audio electronic circuits and DC or pulsating circuits where polarity reversal may occur.
| Customer P/N | XUNDA P/N | Capacitance | Voltage | Dimensions (mm) | Tolerance (%) | Leakage Current (uA) | Dissipation Factor (%) | Max Ripple Current (mA) | Surge Voltage (SV) | Lead Type |
|---|---|---|---|---|---|---|---|---|---|---|
| NP2751HMC112RB | 2.7uF/50v | 5*11 | ±10 | 4.05 | 14 | 26 | 63 | Long leads | ||
| 2.7 | 50 VDC | 5*11 | ±10 | 4.05 | 14 | 26 | 63 | Long leads |
| Parameter | Specification |
|---|---|
| Capacitance Range | 1~6800F |
| Rated Working Voltage (WVDC) | 6.3~250V |
| Operating Temperature Range | -40 ~ +105 |
| Capacitance Tolerance (120Hz, 255) | ±10% |
| Dissipation Factor (TAN) (120Hz, 255) | 0.10 to 0.26 (Varies with voltage) |
| Leakage Current (I) (at 255, 5 min @ WV) | I 0.03CV or 3A (whichever is greater) |
| Marking | Xunda, Series (NP), Rated Voltage, Nominal Capacitance, Sleeve Color (Black), Ink Color (White), Temperature (105), Tolerance (M) |
| Surge Voltage (SV) | 8 to 300V (Varies with WV) |
| Test Item | Test Condition | Requirement |
|---|---|---|
| Appearance Inspection | Visual | Clear marking, compliant with 2.3.7 |
| Dimensions | Measurement | Compliant with 2.2 |
| Capacitance | 120Hz (10%), 255 | Compliant with 2.3.2 |
| Dissipation Factor | 120Hz (10%), 255 | Compliant with 2.3.5 |
| Leakage Current | 255, 2 min @ WV | Compliant with 2.3.6 |
| Solderability | 2655, 51S dip, 51mm depth | 95% tinned area, bright and smooth leads |
| Solder Heat Resistance | 350 solder dip for 3s (1.5-2.0mm from lead root) | C/C10%, TAN200% of 2.3.5, I2.3.6, No electrolyte leakage or deformation |
| Lead Strength | Applied pull force for 10s | No lead breakage or looseness (Load varies by lead diameter) |
| High Temperature Characteristics | +105 for 10 min, 2 min @ WV | I5 times of 2.3.6 |
| High Temp. Endurance | 1000hrs @ +105, WV applied, 16hrs recovery | C/C20%, TAN200% of 2.3.5, I2.3.6, No leakage or deformation |
| High Temp. Storage | 1000hrs @ +105, 16hrs recovery | C/C20%, TAN200% of 2.3.5, I2 times of 2.3.6, No leakage or deformation |
| Surge Voltage Test | 1000 cycles, +15~35, 30s charge @ SV, 330s discharge | C/C20%, TAN2.3.5, I2.3.6, No leakage or deformation |
| Solvent Resistance | Dichlorodifluoromethane, Alcohol, Trichlorodifluoroethane (5 min exposure, 15 min recovery) | Clear marking, no sleeve shrinkage |
Company Details
Business Type:
Manufacturer,Distributor/Wholesaler,Agent,Importer
Year Established:
2009
Employee Number:
>>300
Ecer Certification:
Verified Supplier
Company Profile Beijing Silk Road Enterprise Management Services Co.,Ltd. is a professional company focus on integrated circuit ic business. Beijing Silk Road will also responsible with exporting and logistic business. there is professional factory Beijing Silk Road which focus on desigining an... Company Profile Beijing Silk Road Enterprise Management Services Co.,Ltd. is a professional company focus on integrated circuit ic business. Beijing Silk Road will also responsible with exporting and logistic business. there is professional factory Beijing Silk Road which focus on desigining an...
Get in touch with us
Leave a Message, we will call you back quickly!