China factories

Chat Now Send Email
China factory - Beijing Silk Road Enterprise Management Services Co., Ltd.

Beijing Silk Road Enterprise Management Services Co., Ltd.

  • China,Beijing ,Beijing
  • Verified Supplier
  1. Home
  2. Products
  3. About Us
  4. Contact Us

Leave a Message

we will call you back quickly!

Submit Requirement
China Long Lead Type Aluminum Electrolytic Capacitor Xunda NP2751HMC112RB 2.7uF 50
China Long Lead Type Aluminum Electrolytic Capacitor Xunda NP2751HMC112RB 2.7uF 50

  1. China Long Lead Type Aluminum Electrolytic Capacitor Xunda NP2751HMC112RB 2.7uF 50

Long Lead Type Aluminum Electrolytic Capacitor Xunda NP2751HMC112RB 2.7uF 50

  1. MOQ:
  2. Price:
  3. Get Latest Price
Operating Temperature -
Lifetime -
Capacitance 2.7uF
Height - Seated (Max) 11mm
Pin Spacing 2mm
Voltage Rating 50V
Diameter 5mm
Equivalent Series Resistance(ESR) -
Tolerance ±20%
Ripple Current 26mA@120Hz
Description 2.7uF 50V Aluminum Electrolytic Capacitors Through Hole,D5xL11mm
Mfr. Part # NP2751HMC112RB
Package Through Hole,D5xL11mm
Model Number NP2751HMC112RB

View Detail Information

Inquiry by Email Get Latest Price
Chat online Now Ask for best deal
  1. Product Details
  2. Company Details

Product Specification

Operating Temperature - Lifetime -
Capacitance 2.7uF Height - Seated (Max) 11mm
Pin Spacing 2mm Voltage Rating 50V
Diameter 5mm Equivalent Series Resistance(ESR) -
Tolerance ±20% Ripple Current 26mA@120Hz
Description 2.7uF 50V Aluminum Electrolytic Capacitors Through Hole,D5xL11mm Mfr. Part # NP2751HMC112RB
Package Through Hole,D5xL11mm Model Number NP2751HMC112RB

XUNDA NP Series Aluminum Electrolytic Capacitors

The XUNDA NP series are non-polar aluminum electrolytic capacitors designed with single-ended leads. They offer stable and reliable performance with low loss, making them suitable for audio electronic circuits and DC or pulsating circuits where polarity reversal may occur.

Product Attributes

  • Brand: XUNDA
  • Origin: Dongguan, China
  • Product Series: NP
  • Certifications/Standards: GB2693-88 (Reference)

Technical Specifications

Customer P/N XUNDA P/N Capacitance Voltage Dimensions (mm) Tolerance (%) Leakage Current (uA) Dissipation Factor (%) Max Ripple Current (mA) Surge Voltage (SV) Lead Type
NP2751HMC112RB 2.7uF/50v 5*11 ±10 4.05 14 26 63 Long leads
2.7 50 VDC 5*11 ±10 4.05 14 26 63 Long leads
Parameter Specification
Capacitance Range 1~6800F
Rated Working Voltage (WVDC) 6.3~250V
Operating Temperature Range -40 ~ +105
Capacitance Tolerance (120Hz, 255) ±10%
Dissipation Factor (TAN) (120Hz, 255) 0.10 to 0.26 (Varies with voltage)
Leakage Current (I) (at 255, 5 min @ WV) I 0.03CV or 3A (whichever is greater)
Marking Xunda, Series (NP), Rated Voltage, Nominal Capacitance, Sleeve Color (Black), Ink Color (White), Temperature (105), Tolerance (M)
Surge Voltage (SV) 8 to 300V (Varies with WV)
Test Item Test Condition Requirement
Appearance Inspection Visual Clear marking, compliant with 2.3.7
Dimensions Measurement Compliant with 2.2
Capacitance 120Hz (10%), 255 Compliant with 2.3.2
Dissipation Factor 120Hz (10%), 255 Compliant with 2.3.5
Leakage Current 255, 2 min @ WV Compliant with 2.3.6
Solderability 2655, 51S dip, 51mm depth 95% tinned area, bright and smooth leads
Solder Heat Resistance 350 solder dip for 3s (1.5-2.0mm from lead root) C/C10%, TAN200% of 2.3.5, I2.3.6, No electrolyte leakage or deformation
Lead Strength Applied pull force for 10s No lead breakage or looseness (Load varies by lead diameter)
High Temperature Characteristics +105 for 10 min, 2 min @ WV I5 times of 2.3.6
High Temp. Endurance 1000hrs @ +105, WV applied, 16hrs recovery C/C20%, TAN200% of 2.3.5, I2.3.6, No leakage or deformation
High Temp. Storage 1000hrs @ +105, 16hrs recovery C/C20%, TAN200% of 2.3.5, I2 times of 2.3.6, No leakage or deformation
Surge Voltage Test 1000 cycles, +15~35, 30s charge @ SV, 330s discharge C/C20%, TAN2.3.5, I2.3.6, No leakage or deformation
Solvent Resistance Dichlorodifluoromethane, Alcohol, Trichlorodifluoroethane (5 min exposure, 15 min recovery) Clear marking, no sleeve shrinkage

2205131445_Xunda-NP2751HMC112RB_C3003232.pdf

Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer,Distributor/Wholesaler,Agent,Importer

  • Year Established:

    2009

  • Employee Number:

    >>300

  • Ecer Certification:

    Verified Supplier

Company Profile Beijing Silk Road Enterprise Management Services Co.,Ltd. is a professional company focus on integrated circuit ic business. Beijing Silk Road will also responsible with exporting and logistic business. there is professional factory Beijing Silk Road which focus on desigining an... Company Profile Beijing Silk Road Enterprise Management Services Co.,Ltd. is a professional company focus on integrated circuit ic business. Beijing Silk Road will also responsible with exporting and logistic business. there is professional factory Beijing Silk Road which focus on desigining an...

+ Read More

Get in touch with us

  • Reach Us
  • Beijing Silk Road Enterprise Management Services Co., Ltd.
  • 16 Floor, Unit B, Jiatai International Mansion, No 41, Dongsihuan Zhong Road, Chaoyang District, Beijing
  • https://www.icpassive.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement