China factories

Chat Now Send Email
China factory - Beijing Silk Road Enterprise Management Services Co., Ltd.

Beijing Silk Road Enterprise Management Services Co., Ltd.

  • China,Beijing ,Beijing
  • Verified Supplier
  1. Home
  2. Products
  3. About Us
  4. Contact Us

Leave a Message

we will call you back quickly!

Submit Requirement
China Electrolytic Capacitor Long Lead 1uF 50V Xunda NP1051HMC112RB Stable Performance
China Electrolytic Capacitor Long Lead 1uF 50V Xunda NP1051HMC112RB Stable Performance

  1. China Electrolytic Capacitor Long Lead 1uF 50V Xunda NP1051HMC112RB Stable Performance

Electrolytic Capacitor Long Lead 1uF 50V Xunda NP1051HMC112RB Stable Performance

  1. MOQ:
  2. Price:
  3. Get Latest Price
Operating Temperature -
Lifetime -
Capacitance 1uF
Height - Seated (Max) 11mm
Pin Spacing 2mm
Voltage Rating 50V
Diameter 5mm
Equivalent Series Resistance(ESR) -
Tolerance ±20%
Ripple Current 13mA@120Hz
Description 1uF 50V Aluminum Electrolytic Capacitors Through Hole,D5xL11mm
Mfr. Part # NP1051HMC112RB
Package Through Hole,D5xL11mm
Model Number NP1051HMC112RB

View Detail Information

Inquiry by Email Get Latest Price
Chat online Now Ask for best deal
  1. Product Details
  2. Company Details

Product Specification

Operating Temperature - Lifetime -
Capacitance 1uF Height - Seated (Max) 11mm
Pin Spacing 2mm Voltage Rating 50V
Diameter 5mm Equivalent Series Resistance(ESR) -
Tolerance ±20% Ripple Current 13mA@120Hz
Description 1uF 50V Aluminum Electrolytic Capacitors Through Hole,D5xL11mm Mfr. Part # NP1051HMC112RB
Package Through Hole,D5xL11mm Model Number NP1051HMC112RB

Product Overview

The XUNDA NP series aluminum electrolytic capacitors are low-loss, bipolar capacitors with stable and reliable performance. They are designed for audio electronic circuits and DC or pulsating circuits with polarity reversal. These capacitors are characterized by their single-ended lead wire type and are suitable for direct insertion into mounting.

Product Attributes

  • Brand: XUNDA
  • Origin: Dongguan, China
  • Certifications: GB2693-88 (Reference Standard)

Technical Specifications

SeriesCustomer Part No.XUNDA Part No.SpecificationProcessing FormCapacitance/VoltageDimensions (mm)Tolerance (%)Leakage Current (uA)Max Ripple Current (120Hz/105) (mA)Surge Voltage (SV)
NPNP1051HMC112RBLong Lead1uF/50v5*11
NP1uF/50VLong Lead1uF/50V5*1110%3.01363
NP4.7uF/50VLong Lead4.7uF/50V6.3*1110%3.01363
NP10uF/50VLong Lead10uF/50V8*1210%3.01363
NP47uF/50VLong Lead47uF/50V10*1310%3.01363
NP100uF/50VLong Lead100uF/50V10*1710%3.01363
NP220uF/50VLong Lead220uF/50V13*2010%3.01363
NP470uF/50VLong Lead470uF/50V16*2510%3.01363
NP1000uF/50VLong Lead1000uF/50V18*2510%3.01363
NP1uF/63VLong Lead1uF/63V5*1110%3.01379
NP4.7uF/63VLong Lead4.7uF/63V6.3*1110%3.01379
NP10uF/63VLong Lead10uF/63V8*1210%3.01379
NP47uF/63VLong Lead47uF/63V10*1310%3.01379
NP100uF/63VLong Lead100uF/63V13*2010%3.01379
NP220uF/63VLong Lead220uF/63V16*2510%3.01379
NP470uF/63VLong Lead470uF/63V18*2510%3.01379
NP1000uF/63VLong Lead1000uF/63V22*2510%3.01379
NP1uF/100VLong Lead1uF/100V6.3*1110%3.013125
NP4.7uF/100VLong Lead4.7uF/100V8*1210%3.013125
NP10uF/100VLong Lead10uF/100V10*1310%3.013125
NP47uF/100VLong Lead47uF/100V13*2010%3.013125
NP100uF/100VLong Lead100uF/100V16*2510%3.013125
NP220uF/100VLong Lead220uF/100V18*2510%3.013125
NP470uF/100VLong Lead470uF/100V22*2510%3.013125
NP1000uF/100VLong Lead1000uF/100V25*3010%3.013125
NP1uF/160VLong Lead1uF/160V8*1210%3.013200
NP4.7uF/160VLong Lead4.7uF/160V10*1310%3.013200
NP10uF/160VLong Lead10uF/160V13*2010%3.013200
NP47uF/160VLong Lead47uF/160V16*2510%3.013200
NP100uF/160VLong Lead100uF/160V18*2510%3.013200
NP220uF/160VLong Lead220uF/160V25*3010%3.013200
NP1uF/200VLong Lead1uF/200V10*1310%3.013250
NP4.7uF/200VLong Lead4.7uF/200V13*2010%3.013250
NP10uF/200VLong Lead10uF/200V16*2510%3.013250
NP47uF/200VLong Lead47uF/200V18*2510%3.013250
NP100uF/200VLong Lead100uF/200V25*3010%3.013250
NP1uF/250VLong Lead1uF/250V13*2010%3.013300
NP4.7uF/250VLong Lead4.7uF/250V16*2510%3.013300
NP10uF/250VLong Lead10uF/250V18*2510%3.013300
NP47uF/250VLong Lead47uF/250V25*3010%3.013300

2205131445_Xunda-NP1051HMC112RB_C3003230.pdf

Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer,Distributor/Wholesaler,Agent,Importer

  • Year Established:

    2009

  • Employee Number:

    >>300

  • Ecer Certification:

    Verified Supplier

Company Profile Beijing Silk Road Enterprise Management Services Co.,Ltd. is a professional company focus on integrated circuit ic business. Beijing Silk Road will also responsible with exporting and logistic business. there is professional factory Beijing Silk Road which focus on desigining an... Company Profile Beijing Silk Road Enterprise Management Services Co.,Ltd. is a professional company focus on integrated circuit ic business. Beijing Silk Road will also responsible with exporting and logistic business. there is professional factory Beijing Silk Road which focus on desigining an...

+ Read More

Get in touch with us

  • Reach Us
  • Beijing Silk Road Enterprise Management Services Co., Ltd.
  • 16 Floor, Unit B, Jiatai International Mansion, No 41, Dongsihuan Zhong Road, Chaoyang District, Beijing
  • https://www.icpassive.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement