| Operating Temperature | - |
| Lifetime | - |
| Capacitance | 3.3uF |
| Height - Seated (Max) | 11mm |
| Pin Spacing | 2mm |
| Voltage Rating | 50V |
| Diameter | 5mm |
| Equivalent Series Resistance(ESR) | - |
| Tolerance | ±20% |
| Ripple Current | 27mA@120Hz |
| Description | 3.3uF 50V Aluminum Electrolytic Capacitors Through Hole,D5xL11mm |
| Mfr. Part # | NP3351HMC112RB |
| Package | Through Hole,D5xL11mm |
| Model Number | NP3351HMC112RB |
View Detail Information
Explore similar products
High Temperature Aluminum Electrolytic Capacitor Chengx KM228M010G17RR0VH2FP0
V chip Aluminum Electrolytic Capacitors Chengx RVT1E221M0810 Rated 105C with
Aluminum Electrolytic Capacitor Guangdong TOPAZ Elec Tech ECLJ0612270M080P00 for
aluminum electrolytic capacitor HRK 400V10uF CD110 with rated voltage 400 volts
Product Specification
| Operating Temperature | - | Lifetime | - |
| Capacitance | 3.3uF | Height - Seated (Max) | 11mm |
| Pin Spacing | 2mm | Voltage Rating | 50V |
| Diameter | 5mm | Equivalent Series Resistance(ESR) | - |
| Tolerance | ±20% | Ripple Current | 27mA@120Hz |
| Description | 3.3uF 50V Aluminum Electrolytic Capacitors Through Hole,D5xL11mm | Mfr. Part # | NP3351HMC112RB |
| Package | Through Hole,D5xL11mm | Model Number | NP3351HMC112RB |
The XUNDA NP series are unipolar aluminum electrolytic capacitors, designed as single-ended lead types. These capacitors offer low loss and stable performance, making them suitable for audio electronic circuits and DC or pulsating circuits where polarity reversal occurs.
| Series | Customer Part No. | Xunda Part No. | Specification | Capacity/Voltage | Dimensions (mm) | Processing Form | Loss (%) | Leakage Current (uA) | Max Ripple Current (120Hz/105) (mA) | Surge Voltage (SV) | Tolerance (%) | Remarks |
| NP | NP3351HMC112RB | 3.3uF/50v | 5*11 | Long lead | 14 | 4.95 | 27 | 63 | ±20 | Long lead | ||
| NP | 50VDC | 3.3uF | 5*11 | 14 | 4.95 | 27 | 63 | ±20 | Long lead | |||
| NP | 6.3VDC | 0.26 | 8 | |||||||||
| NP | 10VDC | 0.24 | 13 | |||||||||
| NP | 16VDC | 0.22 | 20 | |||||||||
| NP | 25VDC | 0.20 | 32 | |||||||||
| NP | 35VDC | 0.16 | 44 | |||||||||
| NP | 50VDC | 0.14 | 63 | |||||||||
| NP | 63VDC | 0.12 | 79 | |||||||||
| NP | 100VDC | 0.10 | 125 | |||||||||
| NP | 160~250VDC | 0.20 | 200~300 |
| Item | Test Condition | Requirement |
| Appearance Inspection | Visual | Marking clear, conforms to 2.3.7 requirements |
| External Dimensions | Measuring tool test | Conforms to 2.2 requirements |
| Capacitance | Frequency (120Hz or 1KHZ±10%), Temp 25±5 | Conforms to 2.3.2 requirements |
| Dissipation Factor | Frequency (120Hz or 1KHZ±10%), Temp 25±5 | Conforms to 2.3.5 requirements |
| Leakage Current | 25±5, apply rated voltage for 2 minutes | Conforms to 2.3.6 requirements |
| Solderability | Temp 265±5, immersion time 5±1S, immersion depth 5±1mm | 95% or more area tinned, leads bright and smooth |
| Heat Resistance to Soldering | From lead root 1.5~2.0mm, immerse in molten solder at 350 for 3 seconds, then place at room temp for 2 hours | ΔC/C≤±10%, TANδ≤200% of value specified in 2.3.5, I≤ requirements of 2.3.6 (rated voltage test), Appearance: no electrolyte leakage, no body deformation |
| Lead Strength | Apply the following tensile force in the parallel direction of the lead, hold for 10S, no lead breakage or looseness | 0.5mm lead diameter: 0.51kg; 0.6mm~0.8mm lead diameter: 1.0kg; >0.8mm lead diameter: 2.0kg |
| High Temperature Characteristics | +105, 10 minutes, apply rated voltage for 5 minutes | I≤ 5 times the value specified in 2.3.6 |
| High Temperature Endurance | Apply rated voltage, duration 1000HRS, ambient temp +105, recovery time at room temp: 16HRS | ΔC/C≤±20%, TANδ≤200% of value specified in 2.3.5, I≤ requirements of 2.3.6 (rated voltage test), Appearance: no electrolyte leakage, no body deformation. |
| High Temperature Storage | Ambient temp +105, duration: 1000HRS, recovery time at room temp: 16HRS | ΔC/C≤±20%, TANδ≤200% of value specified in 2.3.5, I≤ 2 times the value specified in 2.3.6 (rated voltage test), Appearance: no electrolyte leakage, no body deformation. |
| Surge Voltage Test | Cycle: 1000 times, Temp: +15~35, Charging voltage: see 2.3.8 SV value, Charging duration: 30S, Discharging duration: 330S | ΔC/C≤±20%, TANδ≤ value specified in 2.3.5, I≤ requirements of 2.3.6 (rated voltage test), Appearance: no electrolyte leakage, no body deformation. |
| Solvent Resistance | Dichlorodifluoromethane, alcohol, trichlorodifluoroethane, time less than 5 minutes, recovery 15 minutes | Marking clear, sleeve no poor shrinkage |
Company Details
Business Type:
Manufacturer,Distributor/Wholesaler,Agent,Importer
Year Established:
2009
Employee Number:
>>300
Ecer Certification:
Verified Supplier
Company Profile Beijing Silk Road Enterprise Management Services Co.,Ltd. is a professional company focus on integrated circuit ic business. Beijing Silk Road will also responsible with exporting and logistic business. there is professional factory Beijing Silk Road which focus on desigining an... Company Profile Beijing Silk Road Enterprise Management Services Co.,Ltd. is a professional company focus on integrated circuit ic business. Beijing Silk Road will also responsible with exporting and logistic business. there is professional factory Beijing Silk Road which focus on desigining an...
Get in touch with us
Leave a Message, we will call you back quickly!