China factories

Chat Now Send Email
China factory - Beijing Silk Road Enterprise Management Services Co., Ltd.

Beijing Silk Road Enterprise Management Services Co., Ltd.

  • China,Beijing ,Beijing
  • Verified Supplier
  1. Home
  2. Products
  3. About Us
  4. Contact Us

Leave a Message

we will call you back quickly!

Submit Requirement
China 470uF 35V Electrolytic Capacitor Econd 470UF35VG170GF GF Series Long Lead Green
China 470uF 35V Electrolytic Capacitor Econd 470UF35VG170GF GF Series Long Lead Green

  1. China 470uF 35V Electrolytic Capacitor Econd 470UF35VG170GF GF Series Long Lead Green

470uF 35V Electrolytic Capacitor Econd 470UF35VG170GF GF Series Long Lead Green

  1. MOQ:
  2. Price:
  3. Get Latest Price
Lifetime 3000hrs@105℃
Operating Temperature -40℃~+105℃
Capacitance 470uF
Height - Seated (Max) 17mm
Voltage Rating 35V
Pin Spacing 5mm
Diameter 10mm
Equivalent Series Resistance(ESR) 56mΩ
Ripple Current 1.21A@100KHz
Tolerance ±20%
Description 470uF 35V Aluminum Electrolytic Capacitors Through Hole,D10xL17mm 3000hrs@105℃
Mfr. Part # 470UF35VG170GF
Package Through Hole,D10xL17mm
Model Number 470UF35VG170GF

View Detail Information

Inquiry by Email Get Latest Price
Chat online Now Ask for best deal
  1. Product Details
  2. Company Details

Product Specification

Lifetime 3000hrs@105℃ Operating Temperature -40℃~+105℃
Capacitance 470uF Height - Seated (Max) 17mm
Voltage Rating 35V Pin Spacing 5mm
Diameter 10mm Equivalent Series Resistance(ESR) 56mΩ
Ripple Current 1.21A@100KHz Tolerance ±20%
Description 470uF 35V Aluminum Electrolytic Capacitors Through Hole,D10xL17mm 3000hrs@105℃ Mfr. Part # 470UF35VG170GF
Package Through Hole,D10xL17mm Model Number 470UF35VG170GF

Product Overview

This document specifies the MILANG ELECTRONICS CO.,LTD GF Series Aluminum Electrolytic Capacitor. It is designed for various electronic applications requiring stable capacitance and reliable performance.

Product Attributes

  • Brand: MILANG ELECTRONICS CO.,LTD
  • Origin: Hubei, China
  • Product Series: GF Series
  • Color: Green sleeve with white lettering (PET)
  • Certifications: RoHS
  • Lead Type: Long lead
  • Working Temperature: -40 to +105
  • Storage Conditions: Temperature 35, Humidity 75% RH, Shelf life: 1 year (recharge required after 1 year)

Technical Specifications

Part NumberSeriesCapacitance (uF)Rated Voltage (V)Size (D x L mm)ToleranceDissipation Factor (DF/120Hz)Leakage Current (uA/60s)Impedance (/100KHz)Life (Hrs)Ripple Current (mA/100KHz)Surge Voltage (V)SleeveWorking Temperature ()
GF 470UF35VG170GFGF470.035.010.0 X 17.0-20% ~ +20%9.0164.50.05630001210.044.0Green PET-40+105

Test Items

NOTest ItemConditionsSpecifications
1Maximum permissible ripple currentTemperature:1052, Voltage:DC.Voltage+peak ripple voltage Rated voltage, Ripple frequency:100KHzRefer to table
2SurgeTemperature:1052, "ON" position: 30 seconds, "OFF" position: 5 minutes 30 seconds, Duration:1000 cycles1.No electrical or mechanical damage. 2.Capacitance change within 15%. 3.D.F.smaller than specification value. 4.Leakage current smaller than specification value.
3Temperature CycleOne Cycle: Rated high category temperature3 303, 25 3MAX; Rated low category temperature3 303, 25 3MAX. Total number of cycles: 51.No appearance defect. 2.Capacitance change within 5% 3.D.F.smaller than specification value. 4.Leakage current smaller than specification value.
4Resistance to Soldering HeatWarm up time:1202 seconds to reach 1202, Solder bath temperature: 2605, Solder bath composition: Sn-96.5%, Ag-3.0%, Cu-0.5%, Immersion depth: 1.5 to 2.0mm, Immersion duration: 101 seconds1.No appearance defect. 2.Capacitance change within 5% 3.D.F.smaller than specification value. 4.Leakage current smaller than specification value.
5Solder AbilitySolder bath temperature: 2355, Solder bath composition: Sn-96.5%, Ag-3.0%, Cu-0.5%, Immersion depth: 1.5 to 2.0mm, Immersion duration: 101 secondsA minimum of 95% the immersed surface is to be coated with the new solder
6Low Temperature Characteristics (Max.Impedance Ratio)working Voltage (v): 6.3, 10, 16, 25, 35, 50, 63, 100Impedance Z-40/+20: 8, 6, 4, 3, 3, 3, 3, 3
7High Humidity storageTemperature:402, Relative humidity:90 to 95%, Duration:2408 hours1.No electrical or mechanical damage. 2.Capacitance change within 15%. 3.D.F.smaller than specification value. 4.Leakage current smaller than specification value.
8VentConduct under normal lighting for lab workThere shall be no explosion, flash, flame, spark or fire from the capacitor during or after the test, nor shall there be expulsion of any metal from the casing
9Terminal strength: Tensile test/winding intensityTensile test intensity: Diameter of terminal 0.5d0.8, Tensile Strength(N) 10, continued time 101sec; Diameter of terminal 0.8d1.25, Tensile Strength(N) 20, continued time 101sec. Winding intensity: Diameter of terminal 0.5d0.8, Winding Strength(N) 5, Awl quality 0.51kg; Diameter of terminal 0.8d1.25, Winding Strength(N) 10, Awl quality 1.02kg1.No electrical or mechanical damage 2.No appearance damage
10VibrationFrequency range: 10 Hz to 55 Hz, Amplitude: 1.5 mm, Cycle definition: 10Hz to 55 Hz and back to 10Hz, Cycle duration: 1 minute, Duration: 2 hours per direction (3 directions)1.No electrical or mechanical damage 2.No appearance damage
11EnduranceCapacitors are placed in an oven and applied voltage for 3000 hours at 105. After being restored to 25, capacitors shall meet the specifications.1.Capacitance change within 20% of the initial value. 2.D.F.change within 200% of the specified value. 3.Leakage current smaller than specification value.
12Shelf LifeCapacitors are placed in an oven for 1000 hours at 105 without applying rated working voltage. After being restored to 25, capacitors shall meet the specifications.1.Capacitance change within 20% of the initial value. 2.D.F.change within 200% of the specified value. 3.Leakage current within 200% of the specification value.

2504101957_Econd-470UF35VG170GF_C46867056.pdf

Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer,Distributor/Wholesaler,Agent,Importer

  • Year Established:

    2009

  • Employee Number:

    >>300

  • Ecer Certification:

    Verified Supplier

Company Profile Beijing Silk Road Enterprise Management Services Co.,Ltd. is a professional company focus on integrated circuit ic business. Beijing Silk Road will also responsible with exporting and logistic business. there is professional factory Beijing Silk Road which focus on desigining an... Company Profile Beijing Silk Road Enterprise Management Services Co.,Ltd. is a professional company focus on integrated circuit ic business. Beijing Silk Road will also responsible with exporting and logistic business. there is professional factory Beijing Silk Road which focus on desigining an...

+ Read More

Get in touch with us

  • Reach Us
  • Beijing Silk Road Enterprise Management Services Co., Ltd.
  • 16 Floor, Unit B, Jiatai International Mansion, No 41, Dongsihuan Zhong Road, Chaoyang District, Beijing
  • https://www.icpassive.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement