China factories

Chat Now Send Email
China factory - Beijing Silk Road Enterprise Management Services Co., Ltd.

Beijing Silk Road Enterprise Management Services Co., Ltd.

  • China,Beijing ,Beijing
  • Verified Supplier
  1. Home
  2. Products
  3. About Us
  4. Contact Us

Leave a Message

we will call you back quickly!

Submit Requirement
China Long Lead Aluminum Electrolytic Capacitor Econd 6.8UF400VF120KM2 Suitable For
China Long Lead Aluminum Electrolytic Capacitor Econd 6.8UF400VF120KM2 Suitable For

  1. China Long Lead Aluminum Electrolytic Capacitor Econd 6.8UF400VF120KM2 Suitable For

Long Lead Aluminum Electrolytic Capacitor Econd 6.8UF400VF120KM2 Suitable For

  1. MOQ:
  2. Price:
  3. Get Latest Price
Lifetime 2000hrs@105℃
Operating Temperature -25℃~+105℃
Capacitance 6.8uF
Height - Seated (Max) 12mm
Pin Spacing 2.5mm
Voltage Rating 400V
Diameter 8mm
Ripple Current 63mA@120Hz
Tolerance ±20%
Description 6.8uF 400V Aluminum Electrolytic Capacitors Through Hole,D8xL12mm 2000hrs@105℃
Mfr. Part # 6.8UF400VF120KM2
Package Through Hole,D8xL12mm
Model Number 6.8UF400VF120KM2

View Detail Information

Inquiry by Email Get Latest Price
Chat online Now Ask for best deal
  1. Product Details
  2. Company Details

Product Specification

Lifetime 2000hrs@105℃ Operating Temperature -25℃~+105℃
Capacitance 6.8uF Height - Seated (Max) 12mm
Pin Spacing 2.5mm Voltage Rating 400V
Diameter 8mm Ripple Current 63mA@120Hz
Tolerance ±20% Description 6.8uF 400V Aluminum Electrolytic Capacitors Through Hole,D8xL12mm 2000hrs@105℃
Mfr. Part # 6.8UF400VF120KM2 Package Through Hole,D8xL12mm
Model Number 6.8UF400VF120KM2

Product Overview

The Hubei Milang Xingchuang Electronics Co., Ltd. KM Series aluminum electrolytic capacitor is designed for various electronic applications. This specification sheet details its electrical characteristics, dimensions, marking, testing procedures, and packaging.

Product Attributes

  • Brand: MILANG
  • Origin: Hubei, China
  • Product Type: Aluminum Electrolytic Capacitor
  • Series: KM
  • Color: Black with white lettering (sleeve)
  • Certifications: RoHS
  • Supplier Part Number: 6.8UF400VF120KM2
  • Date: 2025/3/17

Technical Specifications

Part NumberSeriesCapacitance (uF)Rated Voltage (WV)Size (DxL mm)ToleranceD.F (Max) / 120HzLeakage Current (LC uA) 60sImpedance () 100KHzRipple Current (R.C.mA) 120Hz 105Surge VoltageSleeveWorking Temperature ()Terminal Type
KMKM6.84008 X 12-20% ~ +20%0.151581.62000450Black PET with white lettering-25 ~ +105Long lead

Dimensions (Unit: mm)

DLFd
8.0 0.512.0 1.52.5 0.50.5 0.05

Marking

ItemDescription
1Company Logo
2Capacitance and Rated Voltage
3Polarity bar
4Product Series
5Operating Temperature Range and Capacitance Tolerance
6RoHS
7Production Date (e.g., 2502 for Feb 2025)
8Sleeve Material

Testing Conditions

Test ItemConditionsSpecifications
Maximum Permissible Ripple CurrentTemperature: 1052, Voltage: DC Voltage + peak ripple voltage Rated voltage, Ripple frequency: 120HzRefer to table
SurgeTemperature: 1052, Applied voltage: see specification, Duration: 1000 cycles1. No electrical or mechanical damage. 2. Capacitance change within 15%. 3. D.F. smaller than specification value. 4. Leakage current smaller than specification value.
Temperature CycleOne Cycle: Rated low category temperature3 (303 min) to 25 (3 MAX min), Total number of cycles: 51. No appearance defect. 2. Capacitance change within 5%. 3. D.F. smaller than specification value. 4. Leakage current smaller than specification value.
Resistance to Soldering HeatWarm up time: 1202 seconds to reach 1202, Solder bath temperature: 2605, Immersion depth: 1.5 to 2.0mm, Immersion duration: 101 seconds1. No appearance defect. 2. Capacitance change within 5%. 3. D.F. smaller than specification value. 4. Leakage current smaller than specification value.
Solder AbilitySolder bath temperature: 2355, Immersion depth: 1.5 to 2.0mm, Immersion duration: 101 secondsA minimum of 95% of the immersed surface is to be coated with new solder.
Low Temperature Characteristics (Max. Impedance Ratio)Various working voltagesImpedance Z(-40)/Z(+20) or Z(-25)/Z(+20) as specified
High Humidity StorageTemperature: 402, Relative humidity: 90 to 95%, Duration: 2408 hours1. No electrical or mechanical damage. 2. Capacitance change within 15%. 3. D.F. smaller than specification value. 4. Leakage current smaller than specification value.
VentConduct under normal lighting for lab workNo explosion, flash, flame, spark or fire from the capacitor during or after the test, nor shall there be expulsion of any metal from the casing.
Terminal Strength (Tensile/Bending)Tensile test: specified duration and strength based on terminal diameter. Bending test: specified bends and strength.1. No electrical or mechanical damage. 2. No appearance damage.
VibrationFrequency range: 10 Hz to 55 Hz, Amplitude: 1.5 mm, Duration: 2 hours per direction (3 directions)1. No electrical or mechanical damage. 2. No appearance damage.
EnduranceCapacitors are placed in an oven and applied voltage for 2000 hours at 105. After being restored to 25.1. Capacitance change within 20% of the initial value. 2. D.F. change within 200% of the specified value. 3. Leakage current smaller than specification value.
Shelf LifeCapacitors are placed in an oven for 1000 hours at 105 without applying rated working voltage. After being restored to 25.1. Capacitance change within 20% of the initial value. 2. D.F. change within 200% of the specified value. 3. Leakage current within 200% of the specification value.

Packaging

TypeDetails
Bulk PackagingOuter box dimensions: 420X327X270mm
Taped PackagingInner box dimensions: 345X235X55mm. Outer box dimensions: 490X355X295mm. 10 inner boxes per outer box.
Reel Packaging(Details not fully specified in source)

Storage Conditions

ParameterCondition
Storage Temperature 35
Storage Humidity 75% RH
Storage ValidityOne year (recharge required after one year)

2504101957_Econd-6-8UF400VF120KM2_C46867099.pdf

Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer,Distributor/Wholesaler,Agent,Importer

  • Year Established:

    2009

  • Employee Number:

    >>300

  • Ecer Certification:

    Verified Supplier

Company Profile Beijing Silk Road Enterprise Management Services Co.,Ltd. is a professional company focus on integrated circuit ic business. Beijing Silk Road will also responsible with exporting and logistic business. there is professional factory Beijing Silk Road which focus on desigining an... Company Profile Beijing Silk Road Enterprise Management Services Co.,Ltd. is a professional company focus on integrated circuit ic business. Beijing Silk Road will also responsible with exporting and logistic business. there is professional factory Beijing Silk Road which focus on desigining an...

+ Read More

Get in touch with us

  • Reach Us
  • Beijing Silk Road Enterprise Management Services Co., Ltd.
  • 16 Floor, Unit B, Jiatai International Mansion, No 41, Dongsihuan Zhong Road, Chaoyang District, Beijing
  • https://www.icpassive.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement