China factories

Chat Now Send Email
China factory - DONGGUAN LONROY EQUIPMENT CO LTD

DONGGUAN LONROY EQUIPMENT CO LTD

  • China,Dongguan ,Guangdong
  • Verified Supplier
  1. Home
  2. Products
  3. About Us
  4. Contact Us

Leave a Message

we will call you back quickly!

Submit Requirement
China Cement High Temperature and High Pressure Consistometer High-temperature High
China Cement High Temperature and High Pressure Consistometer High-temperature High

  1. China Cement High Temperature and High Pressure Consistometer High-temperature High
  2. China Cement High Temperature and High Pressure Consistometer High-temperature High
  3. China Cement High Temperature and High Pressure Consistometer High-temperature High
  4. China Cement High Temperature and High Pressure Consistometer High-temperature High
  5. China Cement High Temperature and High Pressure Consistometer High-temperature High
  6. China Cement High Temperature and High Pressure Consistometer High-temperature High

Cement High Temperature and High Pressure Consistometer High-temperature High

  1. MOQ: 1
  2. Price:
  3. Get Latest Price
Type Testing Machine
Accuracy Class High Accuracy
Accuracy ----
Application Auto Testing, Laboratory Testing, Lab Testing
customized support OEM, ODM, OBM
power ---
Protection Class Ip56
Voltage 220 V
warranty 1 Year
power requirement VAC220±10% 50/60HZ
Brand Name LONROY
Place of Origin Guangdong, China

View Detail Information

Inquiry by Email Get Latest Price
Chat online Now Ask for best deal
  1. Product Details
  2. Company Details

Product Specification

Type Testing Machine Accuracy Class High Accuracy
Accuracy ---- Application Auto Testing, Laboratory Testing, Lab Testing
customized support OEM, ODM, OBM power ---
Protection Class Ip56 Voltage 220 V
warranty 1 Year power requirement VAC220±10% 50/60HZ
Brand Name LONROY Place of Origin Guangdong, China
High Light high temperature cement consistometerhigh pressure thickening instrumentlab consistency tester with warranty

Cement High Temperature and High Pressure Consistometer High-temperature High-pressure Thickening Instrument Consistency Tester

 

Overview

The 2012 model high-temperature and high-pressure thickening instrument is manufactured strictly in accordance with the requirements of API Specification 10. It is an instrument specifically designed for measuring the thickening time of cement slurry.

The thickening time of cement slurry is an important indicator that must be measured before performing a single or double well cementing. The corresponding technical requirements and operation procedures are detailed in the recommended test method RP-10B of the American Petroleum Institute (API) Specification 10.

 

Characteristics

It fully complies with the requirements of API Specification 10;

It features a digital intelligent temperature controller and digital temperature display;

The reactor body is made of special alloy;

The maximum pressure can reach 315 Mpa;

The maximum temperature can reach 275℃;

It uses a high-power heater;

It is sturdy, durable and easy to use;

All the main control and execution units are made of imported components;

It adopts a magnetic drive device, which is convenient for maintenance.

The reactor body can be cooled rapidly;

The pen-type recorder displays temperature and consistency values;

An optional computer-based 4000 data acquisition and control system can be equipped, which can perform real-time collection, storage and printing of test data through communication port 1.

 

Installation

(1) Unpacking

After unpacking, check the instruments and spare parts against the packing list to ensure that all components have been received and are undamaged. In case of any unexpected situation, please contact our company.

(2) Installing the instrument

1. Connecting air and water (Figure 1)

2. Connect to the power supply

Connect the instrument and the corresponding voltage power supply. The power supply must be reliably grounded. When opening the side cover for installation or maintenance, all power sources must be turned off to avoid injury.

2.1 Connect the [10] rubber hose to the air inlet on the back of the instrument and tighten it;

2.2 Connect the [10] rubber hose to the water inlet on the back of the instrument and tighten it;

2.3 Connect the [10] rubber hose to the drain outlet at the bottom of the instrument on the back and tighten it;

 

Operation of the Instrument

(1) Preparation

1. Carefully check if all the components are installed properly. All electrical switches and air inlet valves, gas source switches, and manual relief valves must be in the closed state.

2. Add oil to the oil tank. Or pour the oil into the reactor body to apply pressure inside the reactor, and then return the oil to the oil tank. The specific steps are as follows: (see Figure 6)

2.1 Pour approximately 2000ml of thickener instrument-specific oil into the reactor body.

2.2 Insert the [4] reactor cover into the reactor body, and do it gently with your hands. Do not insert it too tightly.

2.3 Seal the reactor cover using the tightening screws on the thermocouple: simply insert the thermocouple into the reactor and tighten it.

Note: There is a left-handed small sleeve at the upper end of the thermocouple. Before tightening, the small sleeve should be at the upper end of the thread.

2.4 Rotate counterclockwise to open the air to the reactor valve (at this time, compressed air enters the reactor).

2.5 Rotate counterclockwise to open the manual relief valve (at this time, pressure oil slowly flows into the oil tank).

Note: The oil in the oil tank should not be too full. It is required that the liquid level can be seen in the oil gauge. If too much oil is added, open the ball valve below the oil tank to discharge it.

2.6 Close the air to the reactor valve.

2.7 Remove the tightening screws on the thermocouple and remove the reactor cover. The oiling is completed.

 

Operation of the Instrument

(1) Preparation

1. Carefully check if all the components are installed properly. All electrical switches and air inlet valves, gas source switches, and manual relief valves must be in the closed state.

2. Add oil to the oil tank. Or pour the oil into the reactor body to apply pressure inside the reactor, and then return the oil to the oil tank. The specific steps are as follows: (see Figure 6)

2.1 Pour approximately 2000ml of thickener instrument-specific oil into the reactor body.

2.2 Insert the [4] reactor cover into the reactor body, and do it gently with your hands. Do not insert it too tightly.

2.3 Seal the reactor cover using the tightening screws on the thermocouple: simply insert the thermocouple into the reactor and tighten it.

Note: There is a left-handed small sleeve at the upper end of the thermocouple. Before tightening, the small sleeve should be at the upper end of the thread.

2.4 Rotate counterclockwise to open the air to the reactor valve (at this time, compressed air enters the reactor).

2.5 Rotate counterclockwise to open the manual relief valve (at this time, pressure oil slowly flows into the oil tank).

Note: The oil in the oil tank should not be too full. It is required that the liquid level can be seen in the oil gauge. If too much oil is added, open the ball valve below the oil tank to discharge it.

2.6 Close the air to the reactor valve.

2.7 Remove the tightening screws on the thermocouple and remove the reactor cover. The oiling is completed.

 

 

Cement High Temperature and High Pressure Consistometer High-temperature High-pressure Thickening Instrument Consistency Tester

 

Technical Specification

 

Name

Technical Specification

Max work temperature

315℃

Max work pressure

275Mpa

Range of environmental temperature and consistency

0~100BC

Bowl rotation speed

150r/min

heater power

4000W

power requirement

VAC220±10% 50/60HZ

input power

5000W

environmental requirement

temperature:0~40℃;humidity:0~95%

compressed air

600~1000kpa

water

200~600kpa

pressure medium

mineral oil

 

 

 
 
 

Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer,Agent,Exporter,Seller

  • Year Established:

    2008

  • Total Annual:

    $5 million -$8 million

  • Employee Number:

    80~200

  • Ecer Certification:

    Verified Supplier

    Dongguan Lonroy Equipment Co., Ltd, located in Dongguan, Guangdong,  is a leading company specializing in the research and development, manufacturing and sales of high-tech and high-precision testing equipment. With 20 years of industry experience, we are committed to pr...     Dongguan Lonroy Equipment Co., Ltd, located in Dongguan, Guangdong,  is a leading company specializing in the research and development, manufacturing and sales of high-tech and high-precision testing equipment. With 20 years of industry experience, we are committed to pr...

+ Read More

Get in touch with us

  • Reach Us
  • DONGGUAN LONROY EQUIPMENT CO LTD
  • A31, 11 Floor, No 1 Building, Minjian Jinrong Building, No 111 Guantai Road, Sanyuanli Community, Nancheng Street, Dongguan, Guangdong, China
  • https://www.lab-testmachines.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement